The text of a manual · part 25 of 46
Pico GFX-70 Controllers User Manual: 4 - Wiring with Pico GFX-70, pages 211 to 220
Pages 211 to 220 of 400, from Pico GFX-70 Controllers User Manual
The original document is the PDF (2.1 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Allen-Bradley GFX-70 1760-DUB
Page 211
Wiring with Pico GFX-70
4-101
Scan time Tc Scan time Tc determines the duration of the interval in which the function block is called by the operating system for processing. The value range is between 0 and 6553.5 s. If the value 0 is set, the cycle time of the device is the pause time between the function block calls.
IMPORTANT
IMPORTANT
The device cycle time varies according to the length of the program. With a scan time of 0 s, this may cause an irregular control response.
Use the Set cycle time function block (see Set Cycle Time on page 4-137) to keep the cycle time of the device constant.
Manual Mode of the PID Controller A value must be present at the >MV input to set the manipulated variable directly. If the coil DC..SE is activated, the value at >MV is transferred as manipulated variable QV>. This value is present for as long as the DC..SE coil is activated or the value at the >MV input is changed. If coil DC..SE is deactivated, the control algorithm is reactivated. IMPORTANT
IMPORTANT
Extreme changes in the manipulated variable can occur when the manual manipulated variable is transferred or deactivated.
If the function block is running in UNI (unipolar) mode, a negative signed manipulated variable value will be output.
Signal Smoothing Filter Pico GFX-70 provides 32 signal smoothing filters FT01 to FT32. The function block allows you to smooth noisy input signals.
Wiring a Signal Smoothing Filter You can integrate a signal smoothing filter into your circuit as a coil.
Publication 1760-UM002B-EN-P - March 2005
Page 212
4-102
Wiring with Pico GFX-70
Figure 4.42 Pico GFX-70 circuit diagram with smoothing function block M 48----------------------------[ FT17EN
Parameter Display and Parameter Set for the FT Function Block FT17
+
>I1 >TG >KP QV>
FT17
FT PT1 signal smoothing filter function block, number 17
+
Appears in the parameter display
>I1
Input value
>TG
Recovery time
>KP
Proportional gain
QV>
Output value, smoothed
IMPORTANT
The recovery time Tg is the time in which the output value is calculated. The recovery time Tg must be set so that it is an integer multiple of the cycle time or controller scan time Tc.
Inputs The function block inputs >I1, >I2 and >KP can have the following operands: • Constants • Markers MD, MW, MB • Analog inputs IA01 to IA04 – IA01: terminal I7 – IA02: terminal I8 – IA03: terminal I11 – IA04: terminal I12 • Analog output QA01 • Actual value … QV> of another function block
Output The function block output QV> can be assigned the following operands: • Markers MD, MW, MB • Analog output QA01
Publication 1760-UM002B-EN-P - March 2005
Page 213
Wiring with Pico GFX-70
4-103
Value Range for Inputs and Outputs
Value range
Resolution/unit
>I1
Input value of the function block
-32 768 to +32767
>TG
Recovery time Tg
0 to 65535 in 100/ms
>KP
Proportional gain Kp
0 to 65535 in -- /%
QV>
Output value
-32 768 to +32767
Example:
Value at input
Value processed in the function block.
>TG
Recovery time Tg
250
25 s
>KP
Proportional gain Kp
1500
15
Displaying the Parameter Set in the PARAMETERS Menu • + Access enabled • - Access disabled
Coil FT01EN to FT32EN, function block enable
Memory Requirement of the FT Function Block The FT function block requires 56 bytes of memory plus 4 bytes per constant on the function block input.
Function of the Signal Smoothing Filter Function Block
IMPORTANT
The signal smoothing filter must be enabled so that it can work. Coil FT..EN is active. If coil FT..EN is not active, the entire function block is deactivated and reset. The output value is set to zero.
If the function block is called for the first time, the output value is initialized with the input value when the device is started or after a reset. This speeds up the startup behavior of the function block.
Publication 1760-UM002B-EN-P - March 2005
Page 214
4-104
Wiring with Pico GFX-70
IMPORTANT
The function block updates the output value every time recovery time Tg expires.
The function block operates according to the following equation: Y(t) = [Ta/Tg] x [Kp x x(t) - Y(t-1)] Y(t) = calculated output value for scan time t = Scan time Ta Tg = Recovery time Kp = proportional gain x(t) = Actual value with scan time t Y(t-1) = Output value with scan time t - 1
Scan time: Scan time Ta depends on the set recovery time value.
Recovery time Tg
Scan time Ta
0.1 s to 1 s
10 ms
1 s to 6553 s
Tg x 0.01
GET, Fetch a Value from the Network The function block allows you to selectively read (get) a 32-bit value from the network. The GET function block fetches data which another station has made available on the Pico-Link network with a PUT function block.
Publication 1760-UM002B-EN-P - March 2005
Page 215
Wiring with Pico GFX-70
4-105
Figure 4.43 Pico GFX-70 circuit diagram with GET function block GT01Q1---------------------------[ DB16T
Parameter display and parameter set for the GET function block: GT01 02 20
+
QV>
GT01
GET function block (fetch a value from the network), number 01
02
Station number from which the value is sent. Possible station number: 01 to 08
20
Send function block (PT 20) of the sending station. Possible function block number: 01 to 32
+
Appears in the parameter display
QV>
Actual value from the network
Output The function block output QV> can be assigned the following operands: • Markers MD, MW, MB • Analog output QA01
Contacts GT01Q1 to GT32Q1 Contact (make contact) GT..Q1 switches to status 1 if a new value transferred on the Pico-Link network is present.
Memory Requirement of the GET Function Block The GET function block requires 28 bytes of memory.
GET Diagnostics The GET function block only functions when the Pico-Link network is functioning correctly (see Signs of Life of the Individual Stations and Diagnostics on page 6-12).
Publication 1760-UM002B-EN-P - March 2005
Page 216
4-106
Wiring with Pico GFX-70
Function of the GET Function Block Figure 4.44 Signal diagram of the GET function block
1
2
1: GT..Q1 2: value on GT..QV>
IMPORTANT
The GET function blocks are assigned the value 0 when the power supply is switched on.
Seven-Day Time Switch Pico GFX-70 is equipped with a real-time clock which you can use in the circuit diagram as a 7-day time switch and a year time switch.
IMPORTANT
The procedure for setting the time is described under Setting Date, Time and Daylight Savings Time on page 7-11.
Pico GFX-70 provides 32 seven-day time switches HW01 to HW32 for a total of 128 switching times. Each time switch has four channels which you can use to set four on and off times. The channels are set via the parameter display. The time is backed up in the event of a power failure and continues to run, although the time switch relays will no longer switch. The contacts are kept open when de-energized. Refer to General on page A-1 for information on the buffer time.
Wiring of a 7-Day Time Switch A 7-day time switch is integrated into the circuit diagram as a contact.
Publication 1760-UM002B-EN-P - March 2005
Page 217
Wiring with Pico GFX-70
4-107
Figure 4.45 Pico GFX-70 circuit diagram with 7-day time switch HW14Q1---------------------------[ Q 01
Parameter display and parameter set for the 7-day time switch HW: HW14
A
+
>DY1 >DY2
HW14
7-day time switch function block number 14
A
Time switch channel A
+
Appears in the parameter display
>DY1
Day 1
>DY2
Day 2
>ON
On time
>OFF
Off time
>ON >OFF
Channels 4 channels are available per time switch, channels A, B, C and D. These channels all act on the contact of the 7-day time switch.
Day 1 and Day 2 Either the time period acts from day 1 to day 2, e.g. Monday to Friday, or for one day only. Monday = MO, Tuesday = TU, Wednesday = WE, Thursday = TH, Friday = FR, Saturday = SA, Sunday = SU,
Time 00:00 to 23:59
Displaying the Parameter Set in the PARAMETERS Menu • + Access enabled • - Access disabled
Contacts HW01Q1 to HW32Q1
Publication 1760-UM002B-EN-P - March 2005
Page 218
4-108
Wiring with Pico GFX-70
Memory Requirement of the 7-Day Time Switch The 7-day time switch function block requires 68 bytes of memory plus 4 bytes per channel used.
Function of the 7-Day Time Switch The switching points are defined according to the parameters entered. MO to FR: on the weekdays Mo, Tu, We, Th, Fr ON 10:00, OFF 18:00: on and off switching times for the individual days of the week. MO: every Monday ON 10:00: switch on time SA: every Saturday OFF 18:00: switch off time Switching on working days
Time switch HW01 switches on Monday to Friday between 6:30 and 9:30 and between 17:00 and 22:30.
HW01 A
HW01 B >DY1 MO
>DY2 FR
>DY2 FR
>ON
>ON
06:30
>OFF 09:30
Publication 1760-UM002B-EN-P - March 2005
+
>DY1 MO
17:00
>OFF 22:30
+
Page 219
Wiring with Pico GFX-70
4-109
Switching at the weekend
Time switch HW02 switches on at 16:00 on Friday and switches off at 6:00 on Monday.
HW02 A
+
HW02 B
>DY1 FR
>DY1 MO
>DY2
>DY2
>ON
16:00
+
>ON
>OFF
>OFF 06:00
Figure 4.46 Signal diagram of “weekend”
Overnight switching
Time switch HW03 switches on overnight at 22:00 Monday and switches off at 6:00 on Tuesday.
HW03 D
+
>DY1 MO >DY2 >ON
22:00
>OFF 06:00
Figure 4.47 Signal diagram for night switching
IMPORTANT
If the Off time is before the On time, Pico GFX-70 will switch off on the following day.
Publication 1760-UM002B-EN-P - March 2005
Page 220
4-110
Wiring with Pico GFX-70
Time overlaps
The time settings of a time switch overlap. The clock switches on at 16:00 on Monday, whereas on Tuesday and Wednesday it switches on at 10:00. On Monday to Wednesday the switching-off time is 22:00.
HW04 A
+
HW04 B
>DY1 MO
>DY1 TU
>DY2 WE
>DY2 WE
>ON
>ON
16:00
>OFF 22:00
+
10:00
>OFF 00:00
Figure 4.48 Signal diagram of overlaps
IMPORTANT
Switch-on and switch-off times are always based on the channel which switches first.
Response in the event of a power failure
The power is removed between 15:00 and 17:00. The relay drops out and remains off, even after the power returns, since the first switching-off time was at 16:00.
HW05 A
+
HW05 B
>DY1 MO
>DY1 MO
>DY2 SU
>DY2 SU
>OFF 16:00
>ON
+
12:00
>OFF 18:00
IMPORTANT
Publication 1760-UM002B-EN-P - March 2005
When switched on, Pico GFX-70 always updates the switching state on the basis of all the available switching time settings.