Page 50
Chapter 4 Installing Your Programmable Controller
Figure 4.3 Power Supplies and Input Circuits Receiving Power through a Separate Transformer disc 1FU
L1
2FU
L2
3FU
L3
L1 incoming ac L2 L3
H1
H4 H3
X1
H1 to motor starters
H2 step-down transformer
X2
H4 H3
H2
X1 isolation/constant-voltage transformer
X2 to power supplies and input circuits to output circuits 10302-I
Ground Connection When bringing ac power into the enclosure, do not connect its raceway through an equipment-grounding conductor to the ground bus on the back-panel. The raceway should be grounded elsewhere. Connecting the raceway to the ground bus would cause a ground loop.
4-10
Page 51
Chapter 4 Installing Your Programmable Controller
Ground loops may introduce objectionable ground currents causing faulty operation of the programmable controller. If multiple grounding connections cause faulty operation, refer to Article 250-21 of the National Electrical Code for recommended methods of reducing the objectionable ground current. When ac power is supplied as a separately derived system through an isolation/step-down transformer, you can connect it as a grounded ac system or an ungrounded ac system. For a grounded ac system, connect one side of the transformer secondary to the ground bus as in Figure 4.1. For an ungrounded ac system, connect one side of each test switch for the ground-fault-detector lights to the ground bus as in Figure 4.2. Surge Suppression EMI can be generated whenever inductive loads such as relays, solenoids, motor starters, or motors are operated by “hard contacts” such as pushbutton or selector switches. The wiring and grounding practices described previously guard the processor system against the effects of EMI. However, in some cases it may be necessary to use suppression networks to suppress EMI at its source. Inductive loads controlled only by solid-state output devices alone do not cause comparable EMI generation. However, inductive loads on ac output modules that are in series or parallel with hard contacts require suppression networks to protect the module output circuits as well as to suppress EMI. Connect suppression networks at the inductive loads. If you connect them at the switching devices, the wires connecting the switching devices to the inductive loads will act as antennas to radiate EMI. Figure 4.4 shows typical suppression circuitry for different types of loads. Allen-Bradley bulletin 700 relays and bulletin 509 and 709 motor starters have surge suppressors available as an option. Table 4.B lists these Allen-Bradley products and their suppressors.
4-11
Page 52
Chapter 4 Installing Your Programmable Controller
Figure 4.4 Typical Suppression Networks Suppressor for 3-phase apparatus
Suppressor for small apparatus
230V/460V ac
120V ac
Allen-Bradley Catalog No. 1691-N2
3-phase motor Electro Cube Inc. Part No. RG 1676-13
Suppressor for large apparatus
Suppressor for dc relays +
–
120V ac
V dc
Electro Cube Inc. Part No. RG 1676-14
12057-I
Table 4.B Allen-Bradley Suppressors Allen-Bradley Equipment
Suppressor Catalog Number
Motor Starter Bulletin 509
599-K041
Relay Bulletin 700 Type N or P
700-N242
Motor Starter Bulletin 709
1401-N101
Miscellaneous
700-N243
1 For starters with 120V ac coils. 2 Maximum coil voltage 150V ac or dc. 3 The Bulletin 700-N24 is a universal surge suppressor. It can be used on electromagnetic devices with the limitation of 35 sealed VA, 150V.
4-12
Page 53
Chapter 4 Installing Your Programmable Controller
How to Install Your Processor
This section provides general installation guidelines. The input and output devices that control your manufacturing operations determine the specifics of your installation. Figure 4.5 shows the location of your major pieces of hardware. Figure 4.5 The Locations of the Major Pieces of Hardware
Mini-PLC-2/02 processor (cat. no. 1772-LZ) or Mini-PLC-2/16 processor (cat. no. 1772-LX) or Mini-PLC-2/17 processor (cat. no. 1772-LW)
Mini-PLC-2/02 processor (cat. no. 1772-LZP) or Mini-PLC-2/16 processor (cat. no. 1772-LXP) or Mini-PLC-2/17 processor (cat. no. 1772-LWP)
or
I/O Chassis Assembly (Cat. No. 1771-A1B, -A2B, -A3B, -A4B)
4-slot
8-slot
12-slot
16-slot
I/O module field wiring arm
13491
4-13
Page 54
Chapter 4 Installing Your Programmable Controller
Installing your processor involves twelve steps. Perform these steps in order. 1.
Mounting the backpanel (page 4-14)
2.
Mounting and grounding components on the backpanel (page 4-15)
3.
Setting the switches within the switch group assembly (page 4-22)
4.
Installing keying bands and field wiring arms (page 4-24)
5.
Installing I/O modules (page 4-26)
6.
Installing backup battery (page 4-28)
7.
Installing the EEPROM memory module (page 4-29)
8.
Installing the processor (page 4-31)
9.
Installing the power supply (page 4-31)
10. Wiring field wiring arms (page 4-32) 11. Connecting power to the processor or power supply (page 4-37) 12. Connecting the industrial terminal (page 4-42) Electrostatic Discharge Electrostatic discharge can damage integrated circuits or semiconductors in this processor if you touch backplane connector pins. Avoid electrostatic damage by observing the following precautions: Touch a grounded object to discharge yourself before handling the processor. Do not touch the backplane connector or connector pins. When not in use, keep the module in its static-shield bag. ATTENTION: Electrostatic discharge can degrade performance or damage the processor. Handle as stated above. Failure to observe this caution may cause damage to the processor.
Step 1 - Mounting the Backpanel
4-14
Stud mounting of a backpanel to the back wall of an enclosure Bolt mounting of an I/O chassis or ground bus to the backpanel Stud mounting of an I/O chassis or ground bus to the backpanel
Page 55
Chapter 4 Installing Your Programmable Controller
Figure 4.6 Assembly Diagram of Studs, Bus, and Backpanel to Your Enclosure
Bolt Mounting of a Ground Bus or a Chassis to the Backpanel scrape paint and use a star washer ground bus or mounting bracket bolt tapped hole star washer backpanel
Stud Mounting of this Backpanel to the Back Wall of the Enclosure flat washer back wall of enclosure use a wire brush to remove paint from threads to allow ground connection ground lug welded stud Stud Mounting of a Ground Bus or Chassis to the Backpanel scrape paint scrape paint and use a star washer ground bus or mounting bracket welded stud backpanel
12666 star washer flat washer ground lug
12305-I
Step 2 - Mounting and Grounding Components on the Backpanel
Use 6.35 mm (0.25 in.) bolts to mount the I/O chassis on the enclosure backpanel. For component spacing and dimensions see Figure 4.7 and Figure 4.8.
4-15
Page 56
Chapter 4 Installing Your Programmable Controller
Figure 4.7 Programmable Controller Components Must Not be Spaced Less Than These Minimums 50.8mm
101.6mm
Mini-PLC-2 Processor 101.6mm
Wiring Duct
152.4mm
50.8mm
12059
Figure 4.8 You Need These Dimensions to Mount an I/O Chassis (cat.no. 1771-A1B, -A2B, -A3B, -A4B) use diameter mounting bolts (4 places)
315mm
594mm
340mm
476mm
213mm
1771-P2 or 1771-P7 power supply
16-slot 12-slot 8-slot 4-slot
254mm ground stud
92mm
483mm
247mm
4-16
610mm
16-slot 1771-A4B
356mm
8-slot 1771-A2B
12-slot 1771-A3B1 4-slot 1771-A1B
16189
Page 57
Chapter 4 Installing Your Programmable Controller
Before grounding your processor system, consult the following sources of information: National Electrical Code, published by the National Fire Protection Association of Boston, Massachusetts local codes and ordinances Mounting Processor Components After planning your layout, you can begin mounting the chassis. In mounting each chassis: Make sure each chassis lies flat. If the I/O chassis does not lie flat, shim it with washers so that the chassis is not warped, when the nuts are tightened. Warping an I/O chassis could damage the backplane and cause poor connections. Make good electrical connections between each I/O chassis, the backpanel, and the enclosure Remove paint or other nonconductive finish from studs and the backpanel so that good electrical contact is made at each bolt or stud. After you have established all layouts, you can begin mounting and properly grounding each chassis. Grounding is important for safety in electrical installations. With solid-state controls, proper grounding (including elimination of ground loops) has an added value of helping reduce the effects of electrostatic and electromagnetic interference. Providing a low-impedance path to earth-ground potential will reduce the chances of EMI causing your processor system to malfunction. An authoritative source for safety grounding requirements is the National Electrical Code. Article 250 of the code provides such data as the size and types of conductors and methods of safely grounding electrical components. As defined in the code, a grounding path must be permanent and continuous, and must be able to safely conduct ground-fault currents that may occur in the system to ground with minimum impedance. Also, the connections to a grounding conductor must be a permanent nature. Local codes and ordinances dictate which grounding method is permissible. Figure 4.8 showed mounting assembly details for stud-mounting of a chassis or ground bus to a backpanel, bolt-mounting of a chassis or ground bus to a backpanel, and stud-mounting of a backpanel to the back wall of the enclosure. You can mount the chassis with either bolts or welded studs.
4-17
Page 58
Chapter 4 Installing Your Programmable Controller
If the mounting brackets of a chassis do not lay flat before the nuts are tightened, use additional washers as shims so that the chassis will not be warped by tightening the nuts. Warping a chassis could damage the backplane and cause poor connections. Make good electrical connection between each chassis, the backpanel, and the enclosure through each mounting bolt or stud. Wherever contact is made, remove paint or other non-conductive finish from around studs or tapped holes so that good electrical contact is made at each bolt or stud. Equipment Ground Conductor In addition to the connection through each bolt or stud, use either 1-inch copper braid or 8 AWG copper wire to connect between each chassis, the enclosure, and a central ground but mounted on the backpanel. Figure 4.9 and Figure 4.10 show ground-bus connection details. Figure 4.11 shows enclosure-wall ground connection details. Use a steel enclosure to guard against EMI. If the enclosure door has a viewing window, it should be a laminated screen or a conductive optical substrate to block EMI. Do not rely on the hinge for electrical contact between the door and the enclosure; install a bonding wire. Figure 4.9 Ground Bus Connection Details ground bus tapped hole star washer ground lug bolt
4-18