The text of a manual · part 10 of 59
Mini-PLC-2/02, -2/16, -2/17 Processor (cat. no. 1772-LZ, LZP, LX, LXP, LW, LWP) User Manual: 4 - Installing Your Programmable Controller, pages 76 to 82
Pages 76 to 82 of 490, from Mini-PLC-2/02, -2/16, -2/17 Processor (cat. no. 1772-LZ, LZP, LX, LXP, LW, LWP) User Manual
The original document is the PDF (2.5 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Allen-Bradley 1772-LX / LXP
Page 76
Chapter 4 Installing Your Programmable Controller
8.
Repeat steps 6 and 7 until you wire the appropriate I/O devices to the field wiring arm.
9.
Connect the drain wire to ground.
10. Gather all of your wires and neatly bundle them using tie wraps. 11. Label all of your wires with a 5-digit I/O address code at each wire connection. Chapter 7 describes I/O addressing. 12. Make sure that the field wiring arm pivots freely from vertical to horizontal. 13. Replace the field wiring arm’s terminal cover. 14. Write terminal numbers on the labels next to the terminal’s status indicator and on the terminal cover. These notes aid you during system start-up (chapter 5) and troubleshooting (Chapter 6). If your application uses many shielded cables connected to one I/O chassis, then: provide a ground bus to connect the shielded wires solder several drain wires together at a field wiring arm so you route only one drain
Step 11 - Connecting Power to the Processor or Power Supply
When ac power is supplied as a separately derived system through an isolation or step-down transformer, you can connect the transformer either as a grounded or an ungrounded ac system. If you want to connect:
Then:
a grounded ac system connect one side of the transformer secondary to the ground bus (Figure 4.1)
an ungrounded ac system connect one side of each test switch for the ground-fault detector lights to the ground bus (Figure 4.2)
Power supplies are designed to give an ac undervoltage signal that shuts the processor down when ac line voltage drops below a specific value (Table 4.E). Power supplies give an ac OK signal that turns the processor on when the line voltage rises above a specific value (Table 4.E). This shutdown feature helps keep invalid data out of memory.
4-37
Page 77
Chapter 4 Installing Your Programmable Controller
Table 4.E Processor Operate and Shutdown Voltages On this system If the line voltage
120V
220V
The processor should drops below
92V
184V shutdown increases to
97V
194V start to operate
You provide the appropriate power cable to connect a processor with a power supply (1771-P3, -P4, -P5 power supplies) to its terminal strip. A processor without a power supply receives its power from the backplane of the I/O chassis. To connect the wires to the processor power plug or power supply terminal strip, do the following: Connecting the Processor
4-38
1.
Strip 3/32 inch insulation from the end of the wire.
2.
Insert screwdriver (tip should be no greater than 3/32 inch wide) into the square opening.
3.
Press down with the screwdriver. Figure 4.20 shows a top view of the power plug.
4.
Insert the wire into the round opening on the front of the plug.
5.
Remove screwdriver.
Page 78
Chapter 4 Installing Your Programmable Controller
Figure 4.20 Top View of the ac Power Plug place tool here insert wire here 17229
Connecting a Power Supply To connect the wires to the 1771-P3, -P4, or -P5 power supplies do the following: 1.
Strip 3/8 inch insulation from the end of the wire. Figure 4.21 shows an ac powered 1771-P3 or -P4 power supply. Figure 4.22 shows a dc powered 1771-P5 power supply.
2.
Loosen each terminal screw and place the appropriate wire under it (Figure 4.21).
4-39
Page 79
Chapter 4 Installing Your Programmable Controller
Figure 4.21 Connect Your Power Cable to the ac Power Supply's Terminal Strip 1.5A 125V SLOW BLOW
120V AC L1 N GN power wire connects to L1 neutral wire connects to N ground bus connects to GND 10321-I
Figure 4.22 Connect Your Power Cable to the dc Power Supply's Terminal Strip
5A 32V NORM BLO 24V DC +DC COM GND positive negative
24V DC equipment grounding conductor
10322-I
Connecting More Than One Power Supply When you use two power supplies (Figure 4.23) connect the: paralleling cable between each power supply incoming power source to that terminal strips of the power supplies
4-40
Page 80
Chapter 4 Installing Your Programmable Controller
Figure 4.23 Connecting More Than One Power Supply power supply paralleling cable (cat. no. 1771-CT)
line 120V neutral ac equipment grounding conductor Ground Bus When wiring a 1771-P3 module, connect GND to the ground stud. No. 14 AWG is recommended. 13496
To easily remove your I/O modules that are between the two power supplies, place the paralleling cable across the top of the I/O chassis (Figure 4.23).
4-41
Page 81
Chapter 4 Installing Your Programmable Controller
Setting the Input Voltage Selector Switch The processors can operate on 120 or 220 V ac. Select the required operating voltage by setting the Input Voltage Selector Switch at the rear of the processor (Figure 4.24). The processor is shipped set for 120V operation. Figure 4.24 Location of the Input Voltage Selector Switch input voltage selector switch
20216
Step 12 - Connecting the Industrial Terminal
To connect your 1770-T3 terminal to the processor refer to Figure 4.25. Figure 4.25 The Connections between an Industrial Terminal and a Processor Mini-PLC-2/02, -2/16, -2/17
Industrial Terminal (rear view)
Channel A PLC-2 Family
4-42
Program Panel Interconnect Cable cat. no. 1772-TC 10 ft (3.05 cm)
Interface 10249
Page 82
Chapter 4 Installing Your Programmable Controller
Master Control Relay
1.
Turn the power switch on the front of the 1770-T3 terminal to the OFF position.
2.
Plug the ac power cord into the 1770-T3 terminal.
3.
If using a processor with a power supply, plug the ac power cord into the ac power source.
4.
Connect one end of the 1772-TC Interconnect Cable to CHANNEL A at the back of the industrial terminal.
5.
Connect the other end of the interconnect cable to the socket labeled INTFC at the front of the processor.
6.
Place the PLC-2 family keytop overlay onto the keyboard.
7.
Turn the power switch on the front of the 1770-T3 terminal to the ON position.
8.
Turn the power switch of the processor to the ON position.
9.
Press the keys [1] [1] on the industrial terminal keyboard.
In cases where unexpected machine motion could damage equipment or injure personnel, you should provide a hard-wired master control relay for emergency power shutdown. Allen-Bradley suggests you include several emergency stop switches in the master control relay circuit. When any of the emergency stop switches is opened, power to the input and output devices is removed. Power is still supplied to the system power supply so that the processor continues operation even though all of its input and output devices are powered down.
ATTENTION: Emergency stop switches can be monitored but should not be controlled by your program. Any emergency stop switch must turn off all input and output devices by removing power to the master control relay. Otherwise, it is your responsibility to provide the master control relay and emergency stop switches. You must make certain that emergency stoop switches are wired in series and are located to provide quick and easy access to the operator or maintenance personnel.
4-43