Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeContact

The text of a manual · part 1 of 1

A-B Station Module Installation Instructions, pages 1 to 10

Pages 1 to 10 of 10

The original document is the PDF (267 KB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

Filed in the catalog under the Allen-Bradley 1785-L20B and Allen-Bradley 1785-L40B

Page 1

A-B Station Module

Installation Instructions

Contents

Use these instructions to help you: determine the equipment needed for installing the A-B station module install the A-B station module For information about:

See page:

selecting a power supply

2 properly handling the equipment

2 necessary equipment and tools for installation

3 installing the battery

3 installing the A-B station module

6 applying power

9 interpreting the LED status indicators

9 specifications

10 compatible products

10

Page 2

Installation Instructions A-B Station Module

Select A Power Supply

Before installing the A-B station module, select an appropriate power supply. See the Allen-Bradley Automation Products Catalog, publication AP-100, for backplane current requirements of any A-B product you are using. To determine the required power supply size, do the following:

1771-P7 Add current for: 1. I/O modules

________

2. PLC-5 processor

+________

3. A-B station module

+_2.5 Amps

4.. Total current req'd

=_________

Handle the Equipment Properly

1.

Record the total current draw for all I/O modules in the chassis.

2.

Record the current draw for the PLC-5 processor in the chassis.

3.

Record 2.50 Amps for the A-B station module.

4.

Total the values recorded in steps 1 through 3.

5.

Select a power supply dependent on the input voltage required and on the total current requirements calculated in step 4.

6.

Select a cable for the power supply.

Important: You cannot use an external power supply and a slot-based power supply to power the same chassis. They are not compatible.

The module is sensitive to electrostatic discharge (ESD). ESD can damage integrated circuits or semiconductors in the module. ATTENTION: Do not handle the module or the programmable controller without approved ESD protection. Wear a wrist strap that is attached to an approved grounding point and that remains attached at all times during the installation/removal procedures.

Wrist strap

Observe the following precautions to avoid ESD damage while performing any task in this document: Remain in contact with an approved ground point while handling the module or programmable controller (by wearing a properly grounded wrist strap). Place the module or programmable controller in a static-safe bag when it is not installed in the I/O chassis. Do not touch the backplane connector or connector pins.

2

Page 3

Installation Instructions A-B Station Module

Before Installing the A-B Station Module

You need the following items for installation:

❏ connector header

❏ A-B station module

❏ PLC-5 programmable controller

❏ lithium battery, battery cover, and mounting screw with side connector

❏ four phillips screws and spacers ❏ ESD grounding wrist strap ❏ Allen-Bradley 1771 Universal I/O chassis ❏ phillips screw driver

Install the Battery

(properly grounded) with a power supply.

21074

You receive one 3.0 volt lithium battery with your A-B station module. You can install the battery either before or after you install the module in the I/O chassis. The following applies to both installing and replacing the lithium battery. ATTENTION: For the lithium battery: do not short, recharge, heat above 100° C (212° F), disassemble, or expose contents to water.

ATTENTION: Use only the 3.0 volt battery supplied with the A-B station module. Do not use any other type or size of battery.

3

Page 4

Installation Instructions A-B Station Module

Install the Battery Install the battery in the A-B station module as follows: 1.

Remove the battery from the shipping bag.

2.

Remove the battery cover.

19401

3.

Connect the battery. (If replacing, remove the old battery first by pressing in the tab on the clip.)

19403

4.

Place the battery and the wires in the module. A

5.

Install the battery cover. A .

6.

Using an erasable marker, record the battery installation date. B .

A

B

19404

4

19405

Page 5

Installation Instructions A-B Station Module

Replace the Battery A red BATT status LED on the A-B station module indicates that the battery needs replacement. The battery is the same as that used by your PLC-5 processor. Therefore, order replacement batteries from Allen-Bradley; order catalog number 1770-XYC.

BATT indicator N O D E B U S A-B Station Module

We recommend that you replace the battery while the module is powered so that your programs are maintained in memory. You may lose your programs if you remove the battery when power is removed. Replace the battery as shown on the previous page.

Dispose of a Battery The guidelines described in the Allen-Bradley Guidelines for Lithium Battery Handling and Disposal, publication ICCG-5.14, apply to the A-B station module. Follow these guidelines when you dispose of the module’s battery. ATTENTION: Follow these precautions:

Do not incinerate or expose the battery to high temperatures. Do not solder the battery or leads; the battery could explode. Do not open, puncture, or crush the battery. The battery could explode and toxic, corrosive, and flammable chemicals could be exposed. Do not charge the battery. An explosion might result or the cell might overheat and cause burns. Do not short positive or negative terminals together. The battery will heat up.

5

Page 6

Installation Instructions A-B Station Module

Install the A-B Station Module

Connect the A-B station module to a PLC-5 programmable controller (with a side connector) using a connector header. Then, install the A-B station module/PLC-5 programmable controller, as a unit, into an I/O chassis. You need the following hardware:

❏ PLC-5 programmable controller with side connector

❏ connector header

❏ four phillips screws and spacers

❏ phillips screw driver

❏ ESD grounding wrist strap 20175

Verify the COMM1 Switch Assembly is Set for RS-423 switch:setting: 1 on 2 on 3 on 4 off 5 off 6 on 7 off

COMM 1 1

2

3

4

5

6

7 off on 20219

6

Page 7

Installation Instructions A-B Station Module

Connect A-B Station Module to Programmable Controller Connect the A-B station module to the PLC-5 programmable controller as follows. ATTENTION: Avoid bending pins when installing the connector header into the PLC-5 programmable controller side connector. Also, avoid bending pins when installing the A-B station module onto the connector header.

1.

Place the PLC-5 programmable controller on a flat, anti-static surface with the side connector face up.

2.

Hold connector header at the grip ridge with pins down. A

3.

Install the connector header into the programmable controller. B B

A Grip Ridge Shroud Pins

19409

NOTE: It is important to attach the shroud and the pin side of the connector header in the designated device.

4.

Place four nylon spacers over the programmable controller screw holes, adhesive side down.

5.

Install the A-B station module onto the shroud side of the connector header.

6.

Install four screws, adjust the module alignment, and then tighten.

FRONT - PLC-5 programmable controller

FRONT A-B station module

19410

PLC-5 processor

Screw (4 places)

Spacer (4 places)

Connector Header (Shroud Side) 19411

7

Page 8

Installation Instructions A-B Station Module

Install the A-B Station Module and PLC-5 Processor Unit ATTENTION: Before installing the A-B station module and PLC-5 processor unit, verify that power to the I/O chassis is off.

Install the PLC-5 processor and A-B station module in the 1771 I/O chassis as follows:

1.

Verify that power is OFF to the 1771 I/O chassis.

locking bar

2.

Install the unit in the I/O chassis, using the left-most slots.

3.

Slide until the modules fit into the backplane connectors.

4.

Close the locking bar.

A-B Station Module card guides PLC-5 programmable controller

20220

Remove the A-B Station Module ATTENTION: Before removing the A-B station module and PLC-5 processor unit, verify that power to the I/O chassis is off.

Remove the module by reversing the installation procedure.

8

Page 9

Installation Instructions A-B Station Module

Apply Power to the I/O Chassis

After power up, observe the following indicators:

BATT LED blinks red four times and then is off, indicating a properly charged battery CPU LED blinks green four times and then remains lit green

N O D E B U S A-B Station Module

Interpret LED Indicators

Use this table to help you interpret the A-B station module LED indicators.

Status for LED: CPU

COMM0 and COMM1

BATT

Color:

Indicates:

green valid processor cycles are occurring red a fault condition green receiving data red transmitting data off idle off good battery red replace battery (or no battery installed)

N O D E B U S A-B Station Module

9

Page 10

Installation Instructions A-B Station Module

Product Specifications

A-B station module specifications:

Backplane Current

2.50 Amps at +5 Vdc

Battery Life

1 year

Environmental

Operating temperature

0 - 60° C (32 - 140° F)

Conditions

Storage temperature

-40 - 85° C (-40 - 185° F)

Relative humidity

5 - 95% (without condensation)

COMM0 port

RS-232C; 9-pin

COMM1

Foxboro I/A protocol, DNBI OR DNBX adapter

Nodebus port

Maximum cable length is 150 feet using a DNBI or 400 feet using a DNBX

Location

Allen-Bradley 1771 Universal I/O Chassis

Connected to the side connector of the PLC-5 processor

Agency Certification

CSA certification

Communication Ports

CSA certifies products for general use as well as for use in hazardous locations. Actual CSA certification is indicated by the product label. UL Certification Underwriters Laboratories Inc. (UL) performs safety investigations of electrical and electronic equipment and products as well as other equipment and products. After product samples have been safety tested and are found to comply with applicable safety requirements, UL authorizes a manufacturer to apply the appropriate UL Mark on products that continue to comply with the requirements. In the case of the A-B station module, it is the presence of the UL Listing Mark on the individual product that indicates UL certification.

PLC-5 Processor Compatibility

The A-B station module is compatible with all PLC-5 processors having a coprocessor expansion port. Processors excluded are all PLC-5/40 and -5/60 series A as well as PLC-5/40 and-5/60 series B, revision B processors.

Obtaining Allen-Bradley Publications

These installation instructions reference the following publications: Title:

Publication number:

Allen-Bradley Automation Products Catalog

AP-100

Allen-Bradley Guidelines for Lithium Battery Handling and Disposal

ICCG-5.14

Obtain these publications by contacting your local Allen-Bradley sales or distributor office. PLC and PLC-5 are registered trademarks of Allen-Bradley Company, Inc.

Publication 1785-2.37 June 1994

10

Copyright 1994 Printed in USA

PN 955117-29