The text of a manual · part 3 of 42
Bulletin 5370 CVIM Configurable Vision Input Module User Manual: 2 - CVIM Hardware Connection and Powerup Check
Pages 23 to 34 of 390, from Bulletin 5370 CVIM Configurable Vision Input Module User Manual
The original document is the PDF (26 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Allen-Bradley 5370-CVIM
Page 23
Chapter Chapter Objectives
CVIM Systern Components
Cl//M Hardware Connection and Powerup Check
2
The objectives of this chapter are to show you how to connect the CVIM system components and perform a powerup check.
The procedures in this chapter cover only those components that are related to the CVIM machine vision system, namely: l CVIM module, Catalog No. 5370-CVIM.
l Pyramid
Integrator chassis:
Four-slot chassis, Catalog No. 5 1 lo-A4. Eight-slot chassis, Catalog No. 5110-A8. l Chassis l Video power supply, Catalog No. 5120-Pl.
monitor:
~;~I~~~-inch, rack-mounted,
Monochrome, g-inch, 115VAC, Catalog No. 2801-N9.
Monochrome, g-inch, 230VAC, Catalog No. 2801-N20.
Monochrome, la-inch, l Light
115VAC, Catalog No.
115VAC, Catalog No. 2801-N6.
pen, Catalog No. 2801-N7.
l Camera,
Catalog No. 2801-YC.
l Interface modules:
User interface box, Catalog No. 2801-N22. I./O interface box, Catalog No. 2801-N21. Interface board, Catalog No. 1771-JMB. l Interconnecting cables.
Additional components may be required for some CVIM system configurations. These will be identified in the connection procedures. For complete information on installing the CVIM system in its factory floor location, refer to the Allen-Bradley Pyramid Integrator Installation Manual, Publication 5000-6.2.10, which is supplied with the CVIM module.
Connecting CVIM System Components -
Before you install the CVIM system at its factory-floor site, you may find it useful to connect the basic system components temporarily on a workbench or table top. There, away from the noise and distractions typically present on a factory floor, you can perform the powerup check and use the CVIM Quick Start Self-Training Guide, Catalog No. 5370-ND003, to get acquainted with the user interface.
Page 24
Chapter
2
CVIM Hardware
Connection and Powerup Check
2-2
Connecting CWM System Components (con timed)
If, however, you intend first to install the CVIM system at its factory-floor site, refer to the following Allen-Bradley publications for site installation information.
^ l Pyramid
Integrator Installation Manual, Publication No. 5000-6.2.10. Chapter 4, Grounding the Components, is of particular importance. l Grounding
1777-4.1.
l Solid
SGI-1.1.
and Wiring Guidelines,
Publication
State Control Safety Guidelines,
After completing the site installation,
No.
Publication
No.
return to this section.
Use the following steps to connect the CVIM system components and perform the powerup check. Your Action
Comments
Place the chassis backside down on the work surface. Pull the DUPWR LOCK handle out as far as it will go.
This handle is at the bottom edge of the chassis.
Remove any foreign material from inside the chassis. Locate the AC voltage-selection switch on the chassis power supply.
This is a slide switch near the bottom edge of the power supply module. NOTE:
No disassembly is required to access this switch.
A
-
Page 25
Chapter
-
2
CVlM Hardware
Connection and Powerup Check
2-3
Connecting CVIM System Components (con timed)
Comments
Your Action
The chassis power supply operates within one of the following two input voltage ranges: l Low Range: l High
Set the voltage-selection switch to match the AC input voltage. Install the power supply module in the chassis.
Range:
90 to 132 VAC @47 to 63 Hz. 180 to 264 VAC @ 47 to 63Hz.
Use the 115V setting for input voltages in the low range. Use the 230V setting for input voltages in the high range. Carefully align the power supply with the leftmost slot in the chassis. Slide the power supply into the chassis and press down to seat the module. Finally, tighten the thumb screws evenly to secure the power supply * NOTE: Do not push in the DC PWR/LOCK handle yet.
-
Obtain an AC line cord for the chassis power supply.
Use a three-wire line cord with a suitable type of insulation and sufficient length.
Attach one end of the line cord to a plug.
Use a three-prong voltage.
plug that is approriate for the AC input
At this point, refer to the Pyramid Integrator Installation Manual, Pub. No. 5000-6.2.10,pages 9-4 and A-12. Attach the other end of the line cord to thepower supply’s AC input connector.
Use the instructions and illustrations on pages 9-4 and A12.
A
WARNING: Be certain to connect the ground wire to both the AC connector and the plug. Failure to do so could result in a dangerous electric shock to personnel.
NOTE:
Do not apply AC power to the power supply yet.
t 0
Page 26
Chapter
2
W/M
Hardware Connection and Powerup Check
2-4
Connecting CVIM System Components (continued)
Comments
Your Action Locate the DC voltage-selection switch on the CVIM module.
This is a slide switch near the connector edge of the CVIM module. NOTE: No disassembly is required to access this switch.
+ 24 VDC (External) y-&&J k 12 VDc’(Internal) (factory default setting) -
Determine whether your application requires an external 24VDCpower supply.
The CVIM module uses a DC-to-DC converter to supply power to the cameras. The converter gets its DC voltage from either the chassis power supply (k 12V) or from an external DC power supply ( + 24V). Your choice of DC power source should be based on whether the chassis power supply has sufficient capacity in its + 12V and -12V sections for all the modules and cameras in your application. The following table shows the current required for one CVIM module alone and with one and two cameras: + 12V Current Requirement
-12V Current Requirement
No. of Cameras
0.065A
0.075A
0
0.275A
0.285A
1
0.405A
0.415A
2 -
Page 27
Chapter
2
CVlM Hardware
Connection and Powerup Check 2-5
-
Connecting Cl//M System Components (continued)
Your Action
Comments To determine the total current load on the + 12V and -12V sections of the chassis power supply, add the current requirements for all CVIM modules and cameras, then add to that the current requirements for all other modules (if any) in the same chassis. If the total current load exeeds the capacity of either the + 12V or -12V section in the chassis power supply, you must use an external 24VDC power supply. If your application requires an external 24VDC power supply, here are the current requirements for a CVIM module with one and two cameras: l One
CVIM module with one camera:
0.210A.
l One
CVIM module with tulo cameras:
0.340A.
To determine the total current load on the 24V power supply, add the current requirements for all CVIM modules and cameras in the chassis. Obtain a 24V power supply that has sufficient capacity to meet the needs of your application. Set the DC voltage-selection switch to match the DC voltage source.
Set the switch to f 12 when the camera power source is internal - the chassis power supply. Set the switch to + 24 when the camera power source is external - a 24VDC power supply.
Install the CVIM module in the chassis.
Carefully align the CVIM module with any available slot in the chassis. Slide the module into the chassis and press down to seat the module. Finally, tighten the thumb screws evenly to secure the CVIM module. NOTE:
Place the chassis upright on the work surface
Do not push in the DC PWR/LOCK handle yet.
Page 28
Chapter
2
CVlM Hardware Connection and Powerup Check
2-6 -
Connecting CVIM System Components (con timed)
Your Action Refer to the CVW interconnect diagram below for the cable connections in the next steps.
r
Comments The CVIM interconnect diagram is similar to the one on the side of the CVIM module. It does not, however, show connections to the communication ports. CVIM MODULE
MONOCHROME MONITOR
COLOR MONITOR
-L
1R (
G
B
-
USER
INTERFACE
MODULE connections, see the CVlM Comm.
Locate the user interface cable.
LIGHT PEN
The user interface cable is Cat. No. 2801-NC18A, -NC18B, or -NClK. Note that the cable ends have identical connectors-they are both female.
NOTE: Be certain that you have the user interface cable, not the camera cable.
Page 29
Chapter
2
CVIM Hardware
Connection and Powerup Check 2-7
Connecting CVIM System Components (continued)
Your Action
Comments The user interface cable has a label attached to each end:
.‘.. .... .. .*. l!YzII I
Locate the user interface box.
The user interface box is Cat. No. 2801-N22. The connectors on the box are arranged as follows:
A t 0
Connect one end of the cable to the CVIM module. Connect the other end of the cable to the user interface box.
I
CAUTION: Attempting to connect the camera cable to the User Interface connector on the CVIM module can cause damage to the CVIM module circuitry.
Carefully align the cable connector with the User Interface port, then insert. Carefully align the cable connector with the INPUT connector, then insert.
Locate a camera cable.
The camera cable is Cat. No. 2801-NC14, -NC15, or -NCl& Note that the cable ends do not have identical connectors one is female, and the other is male.
Connect the male end of the cable to the CVIM module.
Carefully align the male connector with the Camera A or Camera B port, then insert.
Page 30
Chapter 2
W/M Hardware Connection and Powerup Check
2-8 -
Connecting CVlM System Components
(continued) Comments
Your Action Connect the female end of the cable to the camera. Place the video monitor on the work surface. Locate the coaxial cable(s) for the video monitor.
The coaxial cable is Catalog No 2801-NC2 or -NC3. A color monitor requires four cables; a monochrome monitor requires one cable. Ifyour monitor is color,
Connect the coaxial cables to the color monitor.
Connect to the R, G, B, and EXT SYNC “IN” connectors. Set each terminator switch to OFF.
Connect the coaxial cables to the user interface box.
Connect the other end of each cable to the corresponding RED, GREEN, BLUE, and SYNC connector. or, ifyour monitor is monochrome,
Connect the coaxial cable to the monochrome monitor.
Connect to the VIDEO IN connector. Set the terminator switch to OFF.
Connect the coaxial cable to the user interface box.
Connect the other end of the cable to the GREEN connector.
-
Locate the light pen. Connect the light pen plug to the user interface box.
Connect to the LIGHT PEN jack.
For systems requiring a 24VDCpower several steps: Obtain an AC line cord for the 24VDCpower supply. Attach one end to a plug. Attach the other end to the 24VDC power supply.
supply, follow the next
Use a three-wire line cord with a suitable type of insulation and sufficient length. Use a three-prong voltage.
plug that is approriate for the AC input
Observe the markings on the power supply’s AC input.
A t l
NOTE: yet.
WARNING: Be certain to connect the ground wire to both the AC input and the plug. Failure to do so could result in a dangerous electric shock to personnel. Do not apply AC power to the 24VDC power supply
_
Page 31
Chapter
2
Cl//M Hardware
Connection and Powerup Check 2-9
-
Connecting CVIM System Components (con tin ued)
Your Action
Comments
Locate the DCpower cable for the external power supply.
The power supply cable will be either Cat. No 5120-CP2 or 5120-CP3. Each has a set of color-coded wires and a rightangle molded plug.
Connect the &wires to the power supply output.
If your power supply has a ” + Sense” terminal, connect the single red wire to that terminal. Connect the triple red wire to the other ” + Output” terminal. If your power supply does not have a ” + Sense” terminal, connect both red wires to the ” + Output” terminal.
Connect the black wires to the power supply output.
If your power supply has a “-Sense” terminal, connect the single black wire to that terminal. Connect the triple black wire to the other “-Output” terminal. If your power supply does not have a “-Sense” terminal, connect both black wires to the “-Output” terminal.
Connect the molded plug to the chassis power supply.
The molded plug is olarized. Align the plug carefully with the + 24V Input jac kpon the front panel of the chassis power supply, then push the plug in until it latches in the jack. This completes the component connections for the powerup check. Now, continue with the powerup check.
Powering U
CVlM
Pystem
At this point, with all basic components connected together, the CVIM system is ready for the powerup check,
Your Action Prepare the video monitor for powerup.
Comment Set the monitor brightness and contrast controls to the middle of their range. Set the scan mode switch to “UNDER.” Set the power switch to OFF.
A ? 0
Insert the video monitor line cord plug in the AC outlet. Set the video monitor power switch to ON.
CAUTION: Verify that the AC voltage source is within limits for both the video monitor and the CVIM system.
After a few seconds, the raster should be dimly visible on the monitor screen. If you’re not sure, increase the screen brightness to maximum for a moment, then return it to its midrange setting.
Page 32
Chapter
2
CVIM Hardware
Connection and Powerup Check
2-10
-
Powering Up CVM SJGtW?l
(continued)
Your Action
Comment
Insert the CVIM system line cord plug in the AC outlet. If your CVIM system is using a + 24VDC power supply, insert the line cord plug in the AC outlet. Push in the DCIPWR LOCK handle.
Be sure the lock handle is in as far as possible. The power/lock mechanism connects DC power to the modules and locks them in the chassis. It also prevents anyone from removing a module with DC power applied. On the power supply front panel, the DC light should turn on. On the CVIM module front panel, the red Memory Active and green Trigger 1 lights will be on briefly. The Pass/Fail light should be a steady green. After about 15 seconds, the Memory Active and Trigger 1 lights should be off, but the Pass/Fai I light should still be green. If so, the powerup sequence was successful. Assuming the powerup sequence was successful, the monitor screen will display the “banner” message, the test pattern, and several “menu boxes”:
ALLEN-BRADLEY Configurable Vision Input Module Bulletin 5370-CVIM Series A Revision A Firmware Rev. CO1 Language: English Packages: None Copyright
1990 Allen-Bradley
Phase
I
Diagnostics
Completed
Status
= OK
Phase
II Diagnostics
Completed
Status
= OK
Status
= OK
System Initialization
Arm Display
Company l eo
Completed
-
Page 33
Chapter
2
W/M
Hardware
Connection and Powerup Check 2-17
Powering Up CVlM SyStef7?
(continued)
Your Action
Comment If the Pass/Fail light turns red, the powerup sequence was not successful. In addition, a failure message may appear on the monitor screen. If these conditions appear, a malfunction has occurred during the powerup sequence. Pull out the DUPWR LOCK handle and remove the AC power plug, then check the cable connections and re-seat the power supply and CVIM modules. Try the powerup sequence again. If the system repeatedly fails to complete the powerup sequence successfully, record all messages appearing on the monitor screen, then contact your Allen-Bradley Representative. Use the following steps to perform a simple test of the CVIM “user interface.”
Aim the light pen at the menu box labeled Setup. Press the light pen tip against the Setup menu box.
Move the pen around slightly until a red border appears around the Setup menu box. When you press the light pen tip against the menu box (“pick” the box), the banner message and the original set of menu boxes will disappear, and the “Main Configuration menu” will appear. This indicates that the CVIM system has entered the “setup” or configuration mode.
Env.
Camera A
Ref.Llne
Ref.Wln
Gage
Window
MISC
Exit
If the user interface appears to be OK, the CVIM system is now ready for use.
Page 34
Chapter
2
CVlM Hardware
Connection and Powerup Check
2- 12
-
Powering Up CVIM SyStetTl
(continued)
At this point, your should refer to the CV1M Quick Start Self-Training Guide, Catalog No. 5370-ND003, and familiarize yourself with the CVIM user interface. When you complete that manual, and you are comfortable with the user interface, you should be ready to investigate the configuration procedures described in this manual. If you have not yet installed the CVIM system at its factoryfloor site, refer to the following Allen-Bradley manuals: l Pyramid
Installation l Grounding
4.1.
l Solid
Manual, Publication and Wiring Guidelines,
5000-6.2.10.
Publication
State Control Safety Guidelines, SGI-1.1.
No. 1777-
Publication
No.
These manuals contains all the information required for panel- or rack-mounting, electrical grounding, and connecting the I/O components. You will have already performed in this chapter some of the steps described in the PI installation manual. When you encounter one of those steps, verify that you have performed it correctly, then continue.
_