Page 105
CPU Specifications and Operation
3--21
Forced Outputs - Outputs which are not used in the program can be forced on and off for troubleshooting and maintenance purposes. You can temporarily allow the forcing of any output by inserting an END coil instruction at the beginning of the ladder program. Then you can use DirectSOFT or a HPP to force outputs on and off. The DL405 CPUs only retain the forced value for one scan, if the I/O point corresponds to an actual point on a module in the system. However, if the point address is greater than any actual I/O point address in the system or it is not used in the ladder program, then the point will maintain the forced status. WARNING: Only authorized personnel fully familiar with all aspects of the application should make changes to the program. Make sure you thoroughly consider the impact of any changes to minimize the risk of personal injury or damage to equipment. Update Special There are certain V-memory locations that contain register information. This portion Relays and Special of the execution cycle makes sure these locations get updated on every scan. Also, there are several different Special Relays, such as diagnostic relays, etc., that are Registers also updated during this segment. CPU Bus Communication
DCM
DCM
Data
Update Clock, Special Relays, and Special Registers
The DL440 and DL450 CPUs have an internal real-time clock and calendar timer which is accessible to the application program. Special V-memory locations hold this information. This portion of the execution cycle makes sure these locations get updated on every scan. Also, there are several different Special Relays, such as diagnostic relays, etc., that are also updated during this segment.
DL405 User Manual, 4th Edition
CPU Specifications and Operation
Many of the Specialty Modules, such as the Data Communications Module and the FACTS CoProcessor modules, can transfer data to and from the CPU over the CPU bus on the backplane. This data is more than just standard I/O point status. This type of communications can only occur on the CPU (local) base. There is a portion of the execution cycle used to communicate with these modules. The CPU performs both read and write requests during this segment.
Page 106
3--22
CPU Specifications and Operation
Solve Application Program
The CPU evaluates each instruction in the application program during this segment of the scan cycle. The instructions define the relationship between input conditions and the system outputs. The CPU begins with the first rung of the ladder program, evaluating it from left to right and from top to bottom. It continues, rung by rung, until it encounters the END coil instruction. At that point, a new image for the outputs is complete. X0
X1
Y0 OUT
C0
CPU Specifications and Operation
Read Inputs from Specialty I/O Service Peripherals, Force I/O CPU Bus Communication Update Clock, Special Relays Solve the Application Program Solve PID equations (DL450)
C100 X5
Read Inputs
LD X10
K10
Write Outputs
Y3 OUT
Write Outputs to Specialty I/O
END
Diagnostics
The internal control relays (C), the stages (S), the global relays (GX), and the variable memory (V) are also updated in this segment. You may recall the CPU may have obtained and stored forcing information when it serviced the peripheral devices. If any I/O points or memory data have been forced, the output image register also contains this information. NOTE: If an output point was used in the application program, the results of the program solution will overwrite any forcing information that was stored. For example, if Y0 was forced on by the programming device, and a rung containing Y0 was evaluated such that Y0 should be turned off, then the output image register will show that Y0 should be off. Of course, you can force output points that are not used in the application program. In this case, the point remains forced because there is no solution that results from the application program execution. Solve PID Loop Equations
430 440 450
Write Outputs
The DL450 CPU can process up to 16 PID loops. The loop calculations are run as a separate task from the ladder program execution, immediately following it. Only loops which have been configured are calculated, and then only according to a built-in loop scheduler. The sample time (calculation interval) of each loop is programmable. Please refer to Chapter 8, PID Loop Operation, for more on the effects of PID loop calculation on the overall CPU scan time. Once the application program has solved the instruction logic and constructed the output image register, the CPU writes the contents of the output image register to the corresponding output points located in the local CPU base or the local expansion bases. Remember, the CPU also made sure any forcing operation changes were stored in the output image register, so the forced points get updated with the status specified earlier.
DL405 User Manual, 4th Edition
Page 107
CPU Specifications and Operation Write Outputs to Specialty and Remote I/O
3--23
After the CPU updates the outputs in the local and expansion bases, it sends the output point information that is required by any Specialty modules which are installed. For example, this is the portion of the scan that writes the output status from the image register to the Remote I/O racks. NOTE: It may appear the Remote I/O point status is updated every scan. This is not quite true. The CPU will send the information to the Remote I/O Master module every scan, but the Remote Master will update the actual remote modules during the next communication sequence between the master and slave modules. Remember, the Remote I/O link communication is managed by the Remote Master, not the CPU.
Diagnostics
Read Inputs Read Inputs from Specialty I/O Service Peripherals, Force I/O CPU Bus Communication Update Clock, Special Relays Solve the Application Program Solve PID Loop Equations Write Outputs Write Outputs to Specialty I/O Diagnostics
You can use AUX 53 to view the minimum, maximum, and current scan time. Use AUX 55 to increase or decrease the watchdog timer value. There is also an RSTWT instruction that can be used in the application program to reset the watch dog timer during the CPU scan.
DL405 User Manual, 4th Edition
CPU Specifications and Operation
During this part of the scan, the CPU performs all system diagnostics and other tasks, such as: S calculating the scan time S updating special relays S resetting the watchdog timer DL405 CPUs automatically detect and report many different error conditions. Appendix B contains a listing of the various error codes available with the DL405 system. One of the more important diagnostic tasks is the scan time calculation and watchdog timer control. DL405 CPUs have a “watchdog” timer that stores the maximum time allowed for the CPU to complete the solve application segment of the scan cycle. The default value set from the factory is 200 mS. If this time is exceeded the CPU will enter the Program Mode, turn off all outputs, and report the error. For example, the Handheld Programmer displays “E003 S/W TIMEOUT” when the scan overrun occurs.
Page 108
3--24
CPU Specifications and Operation
I/O Response Time Is Timing Important I/O response time is the amount of time required for the control system to sense a change in an input point and update a corresponding output point. In the majority of for Your applications, the CPU performs this task practically instantaneously. However, Application? some applications do require extremely fast update times. There are four things that can affect the I/O response time: S The point in the scan period when the field input changes states S Input module Off to On delay time S CPU scan time S Output module Off to On delay time Normal Minimum I/O Response
The I/O response time is shortest when the module senses the input change just before the Read Inputs portion of the execution cycle. In this case the input status is read, the application program is solved, and the output point gets updated. The following diagram shows an example of the timing for this situation.
CPU Specifications and Operation
Scan Scan
Solve Program
Solve Program Read Inputs
Solve Program
Solve Program
Write Outputs
Field Input CPU Reads Inputs
Input Module Off/On Delay
CPU Writes Outputs
Output Module Off/On Delay I/O Response Time
In this case, you can calculate the response time by simply adding the following items. Input Delay + Scan Time + Output Delay = Response Time Normal Maximum I/O Response
The I/O response time is longest when the module senses the input change just after the Read Inputs portion of the execution cycle. In this case the new input status does not get read until the following scan. The following diagram shows an example of the timing for this situation. In this case, you can calculate the response time by simply adding the following items. Input Delay +(2 x Scan Time) + Output Delay = Response Time
DL405 User Manual, 4th Edition
Page 109
CPU Specifications and Operation
3--25
Scan Scan
Solve Program
Solve Program Read Inputs
Solve Program
Solve Program
Write Outputs
Field Input CPU Reads Inputs
Input Module Off/On Delay
CPU Writes Outputs
Output Module Off/On Delay I/O Response Time
Improving Response Time
Scan Scan
Solve Program Normal Read Input
Solve Program Read Input Immediate
Solve Program Write Output Immediate
Solve Program
Normal Write Outputs
Field Input Input Module Off/On Delay Output Module Off/On Delay I/O Response Time
In this case, you can calculate the response time by simply adding the following items. Input Delay + Instruction Execution Time + Output Delay = Response Time The instruction execution time is calculated by adding the time for the immediate input instruction, the immediate output instruction, and all instructions inbetween. NOTE: When the immediate instruction reads the current status from a module, it uses the results to solve that one instruction without updating the image register. Therefore, any regular instructions that follow will still use image register values. Any immediate instructions that follow will access the module again to update the status.
DL405 User Manual, 4th Edition
CPU Specifications and Operation
There are a few things you can do the help improve throughput. S Choose instructions with faster execution times S Use immediate I/O instructions (which update the I/O points during the ladder program execution segment) S Choose modules that have faster response times Immediate I/O instructions are probably the most useful technique. The following example shows immediate input and output instructions, and their effect.
Page 110
3--26
CPU Specifications and Operation
CPU Specifications and Operation
CPU Scan Time Considerations The scan time covers all the cyclical tasks that are performed by the operating system. You can use DirectSOFT or the Handheld Programmer to display the minimum, maximum, and current scan times that have occurred since the previous Program Mode to Run Mode transition. This information can be very important when evaluating the performance of a system. As we’ve shown previously there are several segments that make up the scan cycle. Each of these segments requires a certain amount of time to complete. Of all the segments, the only one you really have the most control over is the amount of time it takes to execute the application program. This is because different instructions take different amounts of time to execute. So, if you think you need a faster scan, then you can try to choose faster instructions. Your choice of I/O modules and system configuration, such as expansion or remote I/O, can also affect the scan time. However, these things are usually dictated by the application. For example, if you have a need to count pulses at high rates of speed, then you’ll probably have to use a High-Speed Counter module. Also, if you have I/O points that need to be located several hundred feet from the CPU, then you need remote I/O because it’s much faster and cheaper to install a single remote I/O cable than it is to run all those signal wires for each individual I/O point. The following paragraphs provide some general information on how much time some of the segments can require.
Power up
Initialize hardware Check I/O module config. and verify Initialize various memory based on retentive configuration
Update input Read input data from Specialty and Remote I/O Service peripheral
CPU Bus Communication
Update Clock / Calendar
PGM
Mode? RUN Execute ladder program
PID Equations (DL450)
Update output Write output data to Specialty and Remote I/O
Do diagnostics
OK OK? NO Report the error, set flag, register, turn on LED
Fatal error YES Force CPU into PGM mode
DL405 User Manual, 4th Edition
YES
NO
Page 111
CPU Specifications and Operation Initialization Process
Reading Inputs
3--27
The CPU performs an initialization task once the system power is on. The required time depends on system loading, such as the number of I/O modules installed, type of memory cartridge being used etc. The initialization task is performed once at power-up, so it does not affect the scan time for the application program. Initialization
DL430
DL440
DL450
Minimum Time
1.2 Seconds
1.0 Seconds
1.9 Seconds
Maximum Time
3.2 Seconds
2.5 Seconds
3.3 Seconds
The time required to read the input status for the local and expansion input modules depends on which CPU you are using, the number of input points in these bases, and the number of input modules being used. The following table shows typical update times required by the CPU. Timing Factors
DL430
DL440
DL450
20.0 μs
14.5 μs
20.0 μs
Per input module
48.0 μs
22.6 μs
13.0 μs
Per input point
4.0 μs
2.5 μs
6.3 μs
For example, the time required for a DL430 to read two 16-point input modules would be calculated as follows. (Where NM is the number of modules and NI is the total number of input points.) Formula
Time = 20μs + (48μs x NM) + (4μs x NI) Example
Time = 20μs + (48μs x 2) + (4μs x 16) Time = 180 μs
NOTE: This information provides the amount of time the CPU spends reading the input status from the modules. Don’t confuse this with the I/O response time that was discussed earlier.
DL405 User Manual, 4th Edition
CPU Specifications and Operation
Overhead
Page 112
3--28
CPU Specifications and Operation
Reading Inputs from Specialty I/O
During this portion of the cycle the CPU reads any input points associated with the following. S Remote I/O S Specialty Modules (such as High-Speed Counter, etc.) The time required to read any input status from these modules depends on which CPU you are using, the number of modules, and the number of input points. Specialty Module
DL430
DL450
Overhead
32.0 μs
20.0 μs
20.0 μs
Per module (with inputs)
100.0 μs
67.0 μs
13.0 μs
Per input point
80.0 μs
54.0 μs
13.8 μs
Remote Module
CPU Specifications and Operation
DL440
DL430
DL440
DL450
Overhead
32.0 μs
22.0 μs
19.0 μs
Per module (with inputs)
150.0 μs
100.0 μs
62.0 μs
Per input point
25.0 μs
17.0 μs
11.2 μs
For example, the time required for a DL430 to read two 32-point input modules (located in a Remote base) and the input points associated with a single High-Speed Counter module would be calculated as follows. (Where NM is the number of modules and NI is the total number of input points.) Remote I/O
High-Speed Counter
Formula Time = 32μs + (150μs x NM) + (25μs x NI)
Formula Time = 32μs + (100μs x NM) + (80μs x NI)
Example Time = 32μs + (150μs x 2) + (25μs x 32)
Example Time = 32μs + (100μs x 1) + (80μs x 16)
Time = 1832 μs
Time = 1412 μs
Total Time
Time = 3244 μs
Service Peripherals Communication requests can occur at any time during the scan, but the CPU only “logs” the requests for service until the Service Peripherals portion of the scan. (The CPU does not spend any time on this if there are no peripherals connected.) To Log Request (anytime)
DL430
DL440
DL450
Nothing Connected
Min. & Max.
0 μs
0 μs
0 μs
Port 0
Send Min. / Max.
52 / 62 μs
40 / 48 μs
38 / 38 μs
Rec. Min. / Max.
60 / 78 μs
52 / 63 μs
45 /45 μs
Send Min. / Max.
60 / 78 μs
46 / 50 μs
41 / 48 μs
Rec. Min. / Max.
68 / 86 μs
66 / 70 μs
47 / 59 μs
Send Min. / Max.
N/A
N/A
41 / 48 μs
Rec. Min. / Max.
N/A
N/A
47 / 59 μs
Send Min. / Max.
N/A
N/A
38 / 38 μs
Rec. Min. / Max.
N/A
N/A
45 / 45 μs
Port 1 Port 2 Port 3
DL405 User Manual, 4th Edition
Page 113
CPU Specifications and Operation
3--29
During the Service Peripherals portion of the scan, the CPU analyzes the communications request and responds as appropriate. The amount of time required to service the peripherals depends on the content of the request. To Service Request
CPU Bus Communication
DL430
DL440
DL450
Minimum
170 μs
120 μs
96 μs
Run Mode Max.
18 ms
26 ms
160 ms
Program Mode Max.
3 Seconds
15 Seconds
11.2 Seconds
Some specialty modules can also communicate directly with the CPU via the CPU bus. During this portion of the cycle the CPU completes any CPU bus communications. The actual time required depends on the type of modules installed and the type of request being processed. NOTE: Some specialty modules can have a considerable impact on the CPU scan time. If timing is critical in your application, consult the module documentation for any information concerning the impact on the scan time. The clock, calendar, and special relays are updated and loaded into special V-memory locations during this time. This update is performed during both Run and Program Modes. Modes Program Mode Run Mode
Writing Outputs
DL430
DL440
DL450
Minimum
8.0 μs fixed
35.0 μs
12.0 μs
Maximum
8.0 μs fixed
48.0 μs
12.0 μs
Minimum
20.0 μs
60.0 μs
22.0 μs
Maximum
26.0 μs
85.0 μs
29.0 μs
The time required to write the output status for the local and expansion I/O modules depends on which CPU you are using, the number of output points in these bases, and the number of output modules being used. The following table shows typical update times required by the CPU. Timing Factors
DL430
DL440
DL450
Overhead
20.0 μs
12.6 μs
15.0 μs
Per output module
45.0 μs
21.0 μs
13.0 μs
Per output point
4.0 μs
2.5 μs
14.1 μs
For example, the time required for a DL430 to write data for two 32-point output modules would be calculated as follows (where NM is the number of modules and NO is the total number of output points). Formula
Time = 20μs + (45μs x NM) + (4μs x NO) Example
Time = 20μs + (45μs x 2) + (4μs x 32) Time = 238 μs
DL405 User Manual, 4th Edition
CPU Specifications and Operation
Update Clock/Calendar, Special Relays, Special Registers
Page 114
3--30
CPU Specifications and Operation
Writing Outputs to Specialty I/O
During this portion of the cycle the CPU writes any output points associated with the following. S Remote I/O S Specialty Modules (such as High-Speed Counter, etc.) The time required to write any output image register data to these modules depends on which CPU you are using, the number of modules, and the number of output points. Specialty Module
DL430
DL440
DL450
Overhead
32.0 μs
20.0 μs
18.0 μs
Per module (with outputs)
100.0 μs
67.0 μs
13.0 μs
Per output point
80.0 μs
54.0 μs
14.1 μs
Remote Module
DL430
DL440
DL450
Overhead
32.0 μs
22.0 μs
15.0 μs
Per module (with outputs)
150.0 μs
100.0 μs
54.0 μs
Per output point
25.0 μs
17.0 μs
13.9 μs
CPU Specifications and Operation
For example, the time required for a DL430 to write two 32-point output modules (located in a Remote base) and the output points associated with a single High-Speed Counter module would be calculated as follows. (Where NM is the number of modules and NO is the total number of output points.) Remote I/O
High-Speed Counter
Formula Time = 32μs + (150μs x NM) + (25μs x NO)
Formula Time = 32μs + (100μs x NM) + (80μs x NO)
Example Time = 32μs + (150μs x 2) + (25μs x 32)
Example Time = 32μs + (100μs x 1) + (80μs x 4)
Time = 1832 μs
Time = 452 μs
Total Time
Time = 2284 μs
NOTE: This total time is the actual time required for the CPU to update these outputs. This does not include any additional time that is required for the CPU to actually service the particular specialty modules. Diagnostics
The DL405 CPUs perform many types of system diagnostics. The amount of time required depends on many things, such as the number of I/O modules installed, etc. The following table shows the minimum and maximum times that can be expected. Diagnostic Time
DL430
DL440
DL450
Minimum
680.0 μs
540.0 μs
282.0 μs
Maximum
880.0 μs
920.0 μs
398.0 μs