The text of a manual · part 14 of 14
Series One/Series Three Data Communications User's Manual: Index
Pages 128 to 134 of 134, from Series One/Series Three Data Communications User's Manual
The original document is the PDF (14 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
Filed in the catalog under the GE Fanuc IC630MDL357A, Fanuc IC630MDL357A and GE IC630MDL357A
Page 128
GEK-90477
Index
INDEX
Accessing the CPU Scratch Pad, 5-44, 5-45, 5-46, 5-47, 5-48, 6-19 ACK, 6-2 Asynchronous Data Format, 6-l Cable Selection, 4-2 Cables, DCU or DCM to Workmaster through the Interface Adapter, 4-11 DCU or DCM to Workmaster Directly through the RS-422 Port, 4-12 Mul tidrop Modem Configuration, 4-10 Mul t idrop RS-422 Cable, 4-Wire, 4-5 Multidrop RS-422 Cable, 2-Wire, 4-7 Point-to-Point DCU or DCM to Series Six CCM or Host Computer, 4-5 Point-to-Point Modem Configuration, 4-9 Cables, GE Catalog Numbers, 4-3 Capabilities of DCU and DCM, l-l Change Password, 5-20, 5-31 Check Program Error Code, 5-20, 5-32 Clear Target Diagnostic Status Words, 5-20, 5-49 Commands, Series Six SCREQ, 5-2 06100, 06200 No Op 5-2 06101, 06201 Read from Target to Source Register Table, 5-2 06102, 06202 Read from Target to Source Input Table, 5-2 06103, 06203 Read from Target to Source Output Table, 5-2 06111, 06211 Write to Target from Source Register Table, 5-2 06112, 06212 Write to Target from Source Input Table, 5-2 06113, 06213 Write to Target from Source Output Table, 5-2 Command Numbers, 5-2 Command Target Run/Program mode, 5-20, 5-46 Communication Errors, 6-l 8 Communications Port Configuration DIP Switches (DCU), 2-6 Communications Port Configuration DIP Switches (DCM), 3-7 Communications Connector (DCU), 2-3 Communications Connector (DCM), 3-3
Configuration Switches Co&, 2-4 Configuration Switches (DCM), 3-4 Configuring the DCU Communications Port, 2-6 Configuring the DCM Communications Port, 3-7 Control Character Coding, 6-2 Data Flow Direction and Memory Type, 6-l 2 Data Length, 5-12 Data Rate Selection (DCU), 2-6 Data Rate Selection (DCM), 3-7 DCM Configuration Switches, 3-4 DCU Configuration SWitches, 2-4 DCU ID DIP Switches, 2-5 DCM ID DIP Switches, 3-6 DCU or DCM ID Number, 6-12 Description and Operation of User Interfaces (DCU), 2-1 Description and Operation of User Interfaces (DCM), 3-l Diagnostic Status Words, 5-16, 5-48, 5-49 Discrete I/O, 5-3, 6-13, Electrical Interface Circuits, 4-l ENQ, 6-2 Enquiry Response Delay, 6-2 EOT, 6-2 Error Checking for Series One Plus, 5-14, 5-15, 6-21 Error Codes, Diagnostic Status Word 1, 5-16 Error Codes, Series one, Series One Junior, Series Three, 5-16...19 ETB, 6-2 ETX, 6-2 External Power Supply Connector (DCM), 3-3 External Power Supply Connector (DCU), 2-7 Front Front
Panel Connectors Panel Connectors
(DCU), 2-3 (DCM), 3-3
Header and Text Data Block Response, 6-l 5 Header Block, 6-11
Page 129
GEK-90477
..
I-II
Index
INDEX
Installing the DCU, 2-9 Installing the DCM, 3-10 Invalid Data, 6-19 lnval id Header, 6-l 8 Invalid NAK, ACK, or EOT, 6-18 LED Indicators (DCU), 2-2 LED Indicators (DCM), 3-2 Limitations of Data Transfers for the Series One and Series One Junior, 5-l 2 Logging-In on the Series One Plus, 5-14, 5-20, 5-30, 6-20 Loop-Back Diagnostics, 4-12 Loop-Back Test Selection (DCU), 2-6 Loop-Back Test Selection (DCM), 3-7 Mapping Series One Junior References to Target Addresses, 5-6 Mapping Series One Plus References to Target Addresses, 5-7 Mapping Series One References to Target Addresses, 5-5 Mapping Series Three References to Target Addresses, 5-9 Master-Slave Normal Sequence Flow Charts, 6-6 Master-Slave Protocol, 6-l Mating Connector for the Communications Port, 4-2 Message Termination, 6-16 Message Transfers, 6-l 1 Modem Configuration Cable Diagrams, 4-8 Mul t idrop Configurations, l-3 NAK, 6-2 Normal Response, Slave, 6-5 Normal Sequence Protocol Format, 6-3 Normal Sequence, Master, 6-5 Normal Sequence, Master-Slave, 6-3 Number of Bytes in Incomplete Last Block, 6-l 4 Number of Complete Data Blocks to Follow Header, 6-14 On/Off On/Off On/Off On/Off
Line Line Line Line
Switch Switch Switch Switch
(DCU), 2-4, 2-10 (DCM), 3-4 (DCU), 2-4, 2-10 (DCM), 3-4
Parity Selection (DCU), 2-6* Parity Selection (DCM), 3-7 Password for Series One Plus, 5-14, 5-l 5, 6-20 Point-to-Point Configuration, l-2 Port Characteristics, 4-l Power Cycle Conditions CDCU), 2-10 Power Cycle Conditions (DCM), 3-l 1 Power Supply Select Switch (DCU), 2-7 Power Supply Select Switch (DCM), 3-8 Power-Up Diagnostics, 4-12 Power-Up Mode Selection (DCU), 2-6, 2-10 Programmer Connector (DCU), 2-3 Read Data Blocks, Master or Slave, 6-l 0 Read from Target Timers and Counters, 5-20, 5-21, 5-37 Read from Target Data Registers, 5-20, 5-26, 5-35 Read from Target I/O, 5-20, 5-22, 5-40 Read from Target User Memory, 5-20, 5-24, 5-42 Read PC Type, 5-20, 5-44 Read Target Diagnostic Status Words, 5-20, 5-49 Read Target Run/Program Mode, 5-20, 5-45 RS-422 Link Connector, 4-6 Scratch Pad, 5-4, 6-13, 6-19 SCREQ Command Examples, 5-20 Change Password, 5-20, 5-31 Check Program Error Code, 5-20, 5-32 Clear Target Diagnostic Status Words, 5-20, 5-49 Command Target Run/Program mode, 5-20, 5-46 Logging-In with the Password, 5-20, 5-30 Read from Target Timers and Counters, 5-20, 5-21, 5-37 Read PC Type, 5-20, 5-44 Read from Target Data Registers, 5-20, 5-26, 5-35 Read Target Diagnostic Status Words, 5-20, 5-48
Page 130
GEK-90477 l-iii index
INDEX
SCAEQ Command Examples (cont.) Read from Target I/O, 5-20, 5-22, 5-40 Read from Target Run/Program Mode, 5-20, 5-45 Read from Target User Memory, 5-20, 5-24, 5-42 Write to Target Data Registers, 5-20, 5-27, 5-36 Write to Target I/O, 5-20, 5-23, 5-41 Write to Target Timers and Counters, 5-20, 5-28, 5-38 Write to Target User Memory, 5-20, 5-25, 5-43 SCREQ Registers, 5-2 Serial Link Time Out, 6-16, 6-17 Series Three CPU Connector (DCM), 3-3 SOH, 6-2 Source ID Number, 6-14 Source Memory Address, 5-13 STX, 6-2 System Configurations, l-2 Test Diagnostics, 4-12 Text Data Block, 6-15 Timer/Counter Accumulators, 6-13 Target ID, 6-12
AUTOMATION
CONTROLS
OPERATIONS,
5-3,
GENERAL
Target Memory Address, 6-12, 5-3 Target Memory Type, 5-3 Terminating Resistors, 4-4 Timing Consideratons, 6-16 Turn-Around Delay Selection (DCU), 2-6 Turn-Around Delay Selection (DCM), 3-7 Turn-Around Delays, 6-16 Units of Load (Series One/Junior), 2-8 Units of Load (Series Three), 3-9 User Memory, 5-4, 6-13 Using the DCU with CPU Rack Power (DCU), 2-7 Using the DCM with CPU Rack Power (DCU), 3-8 Workmaster to DCU or DCM Cable Diagrams, 4-l 1 Write Data Blocks, Master or Slave, 6-10 Write to Target Data Registers,‘ 5-20, 5-27, 5-36 Write to Target I/O? 5-20, 5-23, 5-41 Write to Target Timers and Counters, 5-20, 5-28, 5-38 Write to Target User Memory, 5-20, 5-25, 5-43
ELECTRIC
COMPANY,
CHARLOTTESVILLE,
VIRGINIA;::
n.-!:
Page 131
Page 132
Page 133
GE Fanuc Automation North America, Inc., Charlottesville, Virginia
Page 134
GEK-90477A