Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeContact

The text of a manual ยท part 1 of 8

Intelligent Safety Relay Unit SL-R11 Instruction Manual: Contents

Pages 1 to 3 of 42, from Intelligent Safety Relay Unit SL-R11 Instruction Manual

The original document is the PDF (1.7 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the Keyence SL-R11

Page 1

96M13268

Intelligent Safety Relay Unit

SL-R11 Instruction Manual NOTICE Do not attempt to operate or service this machine until you have read and understood the instructions written in this manual.

00_SL-R11E.p65

1

14.9.9, 9:18 PM

Page 2

Contents Safety Precautions 1. 2. 3. 4. 5. 6. 7.

1 1-1 1-2 1-3 1-4

2

Safety Headings .................................................................................................................................... iii General Precautions ............................................................................................................................. iii Warning ..................................................................................................................................................iv Circuit Design and Wiring ..................................................................................................................... iv Testing and Maintenance ....................................................................................................................... v About Standards and Regulations ........................................................................................................ v Accessories ............................................................................................................................................ v

Specifications Integration with the SL-C ...................................................................................................................... 1-1 Part Names .......................................................................................................................................... 1-2 Specifications ..................................................................................................................................... 1-3 External Dimensions Diagram .......................................................................................................... 1-3 Power Supply Precautions ................................................................................................................ 1-4 1-4-1 Power Units that Can Be Used as Power Supplies for SL-C Series and SL-R11 ....................... 1-4 1-4-2 Recommended Dedicated Power Supply Unit ............................................................................ 1-4

Functions

2-1 Start Interlock ..................................................................................................................................... 2-1 2-2 Restart Interlock ................................................................................................................................. 2-1 2-3 E-STOP Input ...................................................................................................................................... 2-1 2-4 MPCE (Machine Primary Control Element) Monitor ........................................................................ 2-2 2-5 Main/Sub Setting ................................................................................................................................ 2-3 2-6 TEST Input .......................................................................................................................................... 2-3 2-7 FSD Output ......................................................................................................................................... 2-3 2-8 AUX Output ......................................................................................................................................... 2-3 2-9 Relay Replacement and Terminal Block Installation Removal Function ....................................... 2-4 2-10 Status Indicators ................................................................................................................................ 2-4 2-11 Mode Switch Settings ........................................................................................................................ 2-5 2-12 I/O Circuit ............................................................................................................................................ 2-7

3 3-1 3-2 3-3 3-4

Mounting and Installation Installation Location .......................................................................................................................... 3-1 Installation Using a DIN Rail .............................................................................................................. 3-1 Wall Mounting Using Screws ............................................................................................................ 3-3 Connection to the SL-U2 Recommended Dedicated Power Supply .............................................. 3-3

English ENGLISH i 00_SL-R11E.p65

2

14.9.8, 5:24 PM

Page 3

4

Wiring

4-1 Method for Connection to the SL-C Series ...................................................................................... 4-1 4-2 Method for Wiring to the Relay Output Terminal.............................................................................. 4-1 4-2-1 How to Replace the Relay Output Terminal Block ...................................................................... 4-2 4-3 Method for Wiring to Signal Input Terminals .................................................................................... 4-3 4-3-1 Wiring to Start/Restart Input Terminals ....................................................................................... 4-4 4-3-2 Wiring to E-STOP Input Terminals .............................................................................................. 4-5 4-3-3 Wiring to the MPCE Monitor Input Terminal ................................................................................ 4-6 4-3-4 Connecting to Main/Sub Select Input Terminal ........................................................................... 4-7 4-3-5 Wiring to the Test Input Terminal ................................................................................................. 4-8 4-4 About the Light Interference Prevention Connection ..................................................................... 4-9 4-4-1 What is a Light Interference Prevention Connection? ................................................................. 4-9 4-4-2 Parts Required for Connection .................................................................................................... 4-9 4-4-3 Main/Sub Switching Input Setting ............................................................................................... 4-9 4-4-4 Wiring Connections ..................................................................................................................... 4-9

5

Checklist

5-1 List of Pre-use Check Items .............................................................................................................. 5-1 5-1-1 First, Check the SL-R11 Installation Conditions ......................................................................... 5-1 5-1-2 Check the Wiring Before Turning on the Power ......................................................................... 5-1 5-1-3 Check Using an Operation Test While Machine is Stopped ....................................................... 5-1

6

Maintenance

6-1 Regular Inspections ........................................................................................................................... 6-1 6-1-1 Output Relay Inspection .............................................................................................................. 6-1 6-1-2 E-STOP Function Check ............................................................................................................. 6-1 6-2 Relay Circuit Board Replacement ..................................................................................................... 6-1

7

Troubleshooting Troubleshooting .................................................................................................................................... 7-1

8

Revision History Revision History .................................................................................................................................. 8-1

ENGLISH ii

96M13268

00_SL-R11E.p65

3

14.9.9, 9:18 PM