Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeContact

The text of a manual · part 1 of 7

type A0J2 (CPU) User's Manual, pages 1 to 4

Pages 1 to 4 of 46: INTRODUCTION; CONTENTS

The original document is the PDF (1.6 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the Mitsubishi A0J2CPU

Page 1

type A0J2 (CPU) , User s Manual type A0J2 (CPU) , User s Manual

MODEL

A0J2CPU-USERS-E

MODEL CODE

13J601

IB(NA)-66058-D(8812)MEE

HEAD OFFICE : 1-8-12, OFFICE TOWER Z 14F HARUMI CHUO-KU 104-6212,JAPAN NAGOYA WORKS : 1-14 , YADA-MINAMI 5 , HIGASHI-KU, NAGOYA , JAPAN

When exported from Japan, this manual does not require application to the Ministry of Economy, Trade and Industry for service transaction permission.

Specifications subject to change without notice.

Mitsubishi Programmable Logic Controller

Page 2 read from a scan by OCR; it may hold reading errors

INTRODUCTION

Thank you for choosing the Mitsubishi MELSEC-A Series of General Purpose Programmable Controllers. Please read this manual carefully so that the equipment is used to its optimum. A copy of this manual should be forwarded to the end User.

IB (NA) 66058-A

Page 3 read from a scan by OCR; it may hold reading errors

CONTENTS

1. GENERAL DESCRIPTION... 0... cece cece ener e eee e ener ete e eee eee acces 1-1

2. SPECIFICATIONS ..... 0. ccc ec ec ccc te cence tenet cent eensy 2-1~2-5 2.1 General Specifications ........ 00. eee eee eee ee tee tetnenees 2-1 2.2 CPU Unit Performance Specifications .............0eeeeeeeee neces eevee eneaes 2-2 2.2.1. Functions and specifications of CPU unit... 0.0... cc ce ee ee ees 2-2 2.2.2 Performance specifications of CPU unit built-in power supply ................ 2-4 2.3 Memory Specifications .......... 00. ee eee te tee teen e eens ea anee 2-4 2.4 ‘Battery Specifications ... 0.0.0... cece ee eee ent eee eee ee enaeas 2-5 3. HANDLING occ ee cece tere e eee e ene eeunennnseseee 3-1 ~ 3-10 3.1 Handling Instructions ..... 0.0.0... e ene e nee eees 3-1 3.1.1 CPU oo. e ccc cee ee ee eee tebe eben ee been eeeeueneee 3-1 3.1.2 Memory chips......... ccc cece tec e cece ee ee teen ee naeeneeee 3-1 3.1.39 Battery... ccc ccc ete eee ee eet tee ete eee te etna ete ee eeteee 3-2 3.2 CPUUNIt .. 0... ee et en tn tne eee et beeen nett tenets 33 3.2.1 Nomenclature... .. 0... cee een e eee eee eens 3-3 3.2.2 Setting... 0.0... ec eee eee eee teen e nets eset bets eeaes 3-7 3.2.3 Latch range setting and latch clear ...... 0.0... 0. cece ee ee eee es 3-9 4. CONCEPT AND CAUTIONS FOR AOQJ2CPU SYSTEM CONFIGURATION ........ 4-1 ~47 4.1. Assignment and Concept of 1/0 Numbers.......... 000 cece eee cee tener e ee tetas 4-1 4.2 Precautions for Use of Type AOJ2PW Extension Power Supply Unit .............605- 4-3 5. LOADING AND INSTALLATION ....... 0... cece eee eee cence eee ceesees 5-1 ~ 5-11 5.1 Unit Mounting ....... 0... 0 ccc cee eee eee tee cent ene ene ee ntees 5-1 5.1.1 Mounting instructions ....... 0.00. eee ee eee eee eee 5-1 5.1.2 Installation 0... ee ee eee eee eee eee een teenie 5-2 5.1.3 Unit-to-unit mounting method ......... 0... cee ee tenes 5-3 5.1.4 Unit-to-unit mounting ...... 0.0.0.0. cc cee eee ee eee eee e ee en enee 5-6 BQ WING... te ete eee eee eee eee ee eee eee tetas 5-7 5.2.1 Wiringinstructions ......... 0... cee eee ee eee tee 5-7 5.2.2 Wiringto unit terminals .......... 0... ccc ce tee ee eee eee tees 5-10 6. TEST OPERATION AND ADJUSTMENTS. ........ 0.00 cc cece eect eee ee eenees 6-1 ~62 6.1 Check Points Before Start of Test Operation. ......... 0. ccc eee cee eee en eees 6-1 6.2 Test Operation and Adjusting Procedure. ....... 0.00.0 eee ee eee teens 6-2

IB (NA) 66058-D

Page 4 read from a scan by OCR; it may hold reading errors

7. MAINTENANCE AND INSPECTION .......... 0c cece cece ee wee nent e eens 7-1 ~7-3

7.1 Daily Inspection ...... 0.00. ce ee eee eee eee nent eee eentceenee 7-1 7.2 Periodic Inspection. ..... 0.0... cc ee eee eee eee eet eee nner e eet etee senenes 7-2 7.3 Battery Replacement ........... 0. cece eee eens Dee eee wean 7-3 7.4 Battery Replacing Procedure. ...... 0... ccc eee cece tener eee e eee ene nneaes 7-3 APPENDICES. ......... 0 0c ccc eee eee nee tenets teen nnnes APP-1 APPENDIX 1 Dimensional Outline Drawing (AQJ2CPU unit) .......0 0.0.0 cc ee APP-1

IB (NA) 66058 -C