The text of a manual · part 1 of 8
Installation Instructions: SLC 500 Modular Chassis (Catalog Numbers 1746-A4, -A7, -A10, and -A13 Series B), pages 1 to 10
Pages 1 to 10 of 80: 1746-IN016C-MU-P SLC 500™ Modular Chassis Installation Instructions; Back Cover
The original document is the PDF (3.7 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Allen-Bradley 1746-A4, Allen-Bradley 1746-A7, Allen-Bradley 1746-A10 and Allen-Bradley 1746-A13
Page 1
Installation Instructions
SLC 500™ Modular Chassis
(Catalog Numbers 1746-A4, -A7, -A10, and -A13 Series B)
Inside... English Section ....................................................................................................................3 Section française ...............................................................................................................15 Deutscher Abschnitt ..........................................................................................................27 Sezione in Italiano .............................................................................................................39 Sección en español ............................................................................................................51 Seção em Português ..........................................................................................................63 Mounting Dimensions - Dimensions de montage - Einbauabmessungen - Dimensioni per il montaggio - Dimensiones de montaje - Dimensoes de montagem ...75
Publication 1746-IN016C-MU-P - December 2003
Page 2
2
Publication 1746-IN016C-MU-P - December 2003
Page 3
Installation Instructions
SLC 500™ Modular Chassis
(Catalog Numbers 1746-A4, -A7, -A10, and -A13 Series B) English Section
What’s in this Publication Use this publication as a guide when installing an SLC 500 modular chassis.
Installation To ...............................................................................................See page prepare for installation .............................................................................5 allow sufficient mounting space ..............................................................6 install your chassis ...................................................................................7 ground your chassis ..................................................................................9 install the chassis interconnect cable (optional)....................................12 install your I/O modules and attach your power supply.........................12
Reference For this information ................................................................See page specifications..........................................................................................13 Hazardous Location Considerations .......................................................14 mounting dimensions..............................................................................75 For additional installation information, see the SLC 500 Modular Style User Manual, publication 1747-UM011.
Publication 1746-IN016C-MU-P - December 2003
Page 4
4
SLC 500™ Modular Chassis
Important User Information Because of the variety of uses for the products described in this publication, those responsible for the application and use of these products must satisfy themselves that all necessary steps have been taken to assure that each application and use meets all performance and safety requirements, including any applicable laws, regulations, codes and standards. In no event will Rockwell Automation be responsible or liable for indirect or consequential damage resulting from the use or application of these products. Any illustrations, charts, sample programs, and layout examples shown in this publication are intended solely for purposes of example. Since there are many variables and requirements associated with any particular installation, Rockwell Automation does not assume responsibility or liability (to include intellectual property liability) for actual use based upon the examples shown in this publication. Allen-Bradley publication SGI-1.1, Safety Guidelines for the Application, Installation and Maintenance of Solid-State Control (available from your local Rockwell Automation office), describes some important differences between solid-state equipment and electromechanical devices that should be taken into consideration when applying products such as those described in this publication. Reproduction of the contents of this copyrighted publication, in whole or part, without written permission of Rockwell Automation, is prohibited. Throughout this publication, notes may be used to make you aware of safety considerations. The following annotations and their accompanying statements help you to identify a potential hazard, avoid a potential hazard, and recognize the consequences of a potential hazard:
WARNING
!
Identifies information about practices or circumstances that can cause an explosion in a hazardous environment, which may lead to personal injury or death, property damage, or economic loss.
ATTENTION
! IMPORTANT
Identifies information about practices or circumstances that can lead to personal injury or death, property damage, or economic loss.
Identifies information that is critical for successful application and understanding of the product.
Publication 1746-IN016C-MU-P - December 2003
Page 5
SLC 500™ Modular Chassis
5
Prepare for Installation Make sure you have these items.
M4 or M5 (#10 or #12) Hardware • phillips screw and star washer (or SEM screw, phillips screw with attached star washer) for chassis mounting tabs This chassis:
Has:
1746-A4
4 mounting tabs
1746-A7
4 mounting tabs
1746-A10
6 mounting tabs
1746-A13
8 mounting tabs
• phillips screwdriver • drill
Documentation For your: • processor or I/O adapter module • power supply • communication modules and/or I/O modules
Installation Note The power supply support panel (left end panel) has screws as indicated in the illustration below. The center and right end panels are held in position by a molded latch and do not require screws. screw latch latch screw latch latch
Publication 1746-IN016C-MU-P - December 2003
Page 6
6
SLC 500™ Modular Chassis
Allow Sufficient Mounting Space Make sure you meet these minimum spacing requirements. Up to three SLC chassis can be connected (for a maximum of 30 I/O slots).
IMPORTANT
>15.3 cm (6.0 in)
>10.2 cm (4.0 in)
Enclosure
1746-C9
1746-C7
15.3 to 20 cm (6.0 to 8.0 in)
>15.3 cm (6.0 in)
IMPORTANT
For dimensions of:
>10.2 cm (4.0 in) 7.7 to 10.2 cm (3.0 to 4.0 in)
When vertically connecting two 1746-A13 chassis with a 1746-C9 cable, the space cannot be greater than 15.3 cm (6.0 in) for the cable to reach from chassis to chassis.
See page:
left side of all chassis
75
1746-A4, -A7
75
1746-A10, -A13
76
Publication 1746-IN016C-MU-P - December 2003
Page 7
SLC 500™ Modular Chassis
7
Install Your Chassis 1. Drill holes in the back panel of the enclosure for chassis mounting tabs.
ATTENTION
!
Be careful of metal chips when drilling mounting holes for the SLC chassis. Do not drill holes above an SLC chassis if a processor and I/O modules are installed.
2. Install the hardware for the top mounting tabs.
M4 or M5 (#10 or #12) phillips screw and star washer (or SEM screw)
TIP
Scrape paint off the back panel for an electrical connection between the chassis and back panel.
Publication 1746-IN016C-MU-P - December 2003
Page 8
8
SLC 500™ Modular Chassis
3. Slide the chassis over the installed hardware and tighten the screws. ATTENTION
!
If the chassis mounting tabs do not lay flat before the screws are tightened, use additional washers as shims so that the chassis will not be warped by tightening the screws. Warping a chassis could damage the backplane and cause poor connections.
4. Leaving far-left and far-right tabs open for grounding, install the remaining tab hardware (for a four-slot chassis, leave both tabs open).
Publication 1746-IN016C-MU-P - December 2003
Page 9
SLC 500™ Modular Chassis
9
Ground Your Chassis To properly ground your I/O chassis:
See page:
verify grounding configuration
9 install a central ground bus
10 connect equipment grounding conductor
10 connect equipment grounding conductor to ground bus
11 connect ground bus to grounding-electrode system
11
Verify Grounding Configuration This figure shows you how to run ground connections from the chassis to the ground bus. Use a ground bus because it reduces the electrical resistance at the connection. Nearest Ground Bus
Functional Ground
5.2 mm2 (10 AWG) (1)
2 mm2 (14 AWG)
(1)
2 mm2 (14 AWG)
(1)
2 mm2 (14 AWG)
TIP
Preferred Grounding Method.
(1) Keep wire length as short as possible.
Publication 1746-IN016C-MU-P - December 2003
Page 10
10
SLC 500™ Modular Chassis
Install a Central Ground Bus Each enclosure must contain a central ground bus. The ground bus is the common connection for each chassis within the enclosure and the enclosure itself. If you have not already installed a central ground bus, see the Industrial Automation Wiring and Grounding Guidelines, publication 1770-4.1.
Connect Equipment Grounding Conductor IMPORTANT
Use the following information, along with the installation manual for your programmable controller, to functionally ground the chassis.
4M or 5M (#10 or #12) star washer
4M or 5M (#10 or #12) phillips screw and star washer (or SEM screw) chassis mounting tab ground lug with 5.2mm2 (10 AWG) wire
TIP
Keep wire length as short as possible.
Publication 1746-IN016C-MU-P - December 2003