The text of a manual · part 14 of 30
SLC 500 Modular Hardware Style User Manual, pages 131 to 140
Pages 131 to 140 of 296
The original document is the PDF (3.5 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Allen-Bradley 1747-L524
Page 131
Starting Up Your Control System
7. Observe Control Motion
131
Now that program execution has been verified, checkout of control motion can begin. All persons involved with the programming, installation, layout design, machine or process design and maintenance should be involved in making decisions for determining the best and safest way to test the total system. The following procedures are general in nature. Individual conditions may warrant their modification. The basic approach is to initiate testing with the least amount of machine motion. Only some outputs are allowed to generate machine motion. Then additional machine motion can be gradually added, thereby allowing any problems to be detected more easily under controlled conditions. The following procedure provides the steps for testing machine motion using one output at a time. ATTENTION
During all phases of checkout, station a person ready to operate an emergency-stop switch if necessary. The emergency-stop switch will de-energize the master control relay and remove power from the machine. This circuit must be hardwired only, it must not be programmed.
Use this procedure to observe control motion. 1. Identify the first output device to be tested and reconnect its wiring. ATTENTION
Contact with ac line potential may cause injury to personnel. When reconnecting wiring, make sure that the ac power disconnect switch is opened.
2. Place the controller in the Run mode and observe the behavior of the output device. To do this, simulate the input conditions necessary to energize the output in the program. If it is not practical to manually activate an input device, use the force function to simulate the proper input condition. ATTENTION
Never reach into a machine to actuate a device, unexpected machine operation could occur.
3. Repeat steps 1 and 2, testing each output device, one at a time.
Publication 1747-UM011G-EN-P - June 2008
Page 132
132
Starting Up Your Control System
8. Conduct a Dry Run ATTENTION
During all phases of checkout, station a person ready to operate an emergency-stop switch if necessary. The emergency-stop switch will de-energize the master control relay and remove power from the machine. This circuit must be hardwired only, it must not be programmed.
After thoroughly checking out the controller system and program, proceed with a dry run of the application with all of the output devices enabled. This dry run will vary with the application. A machine tool dry run would test the program with all outputs enabled but without tooling an actual part. After you check out the entire system, and your dry run has been completed satisfactorily, we recommend that you load your program into an EEPROM memory module for back-up program storage. Refer to your programming software’s online help for directions on loading the EEPROM from RAM. This step completes start-up procedures. Your SLC programmable controller is now ready for operation.
Publication 1747-UM011G-EN-P - June 2008
Page 133
Chapter
9
Maintaining Your Control System
This chapter covers the following maintenance issues: • Handling and storing battery, catalog number 1747-BA • Installing and replacing the battery of the SLC 5/01 or SLC 5/02 processor • Replacing your SLC 5/03, SLC 5/04, and SLC 5/05 battery • Replacing retainer clips on an I/O module • Replacing a fuse on the power supply See page 72 for important information on testing the Master Control Relay Circuit and Preventive Maintenance.
Handling and Storing Battery, Catalog Number 1747-BA
Follow the procedure below to ensure proper battery operation and reduce personnel hazards.
Handling • Use only for the intended operation. • Do not ship or dispose of cells except according to recommended procedures. • Do not ship on passenger aircraft. ATTENTION
Do not charge the batteries. An explosion could result or the cells could overheat causing burns. Do not open, puncture, crush, or otherwise mutilate the batteries. A possibility of an explosion exists and/or toxic, corrosive, and flammable liquids would be exposed. Do not incinerate or expose the batteries to high temperatures. Do not attempt to solder batteries. An explosion could result. Do not short positive and negative terminals together. Excessive heat can build up and cause severe burns.
133
Publication 1747-UM011G-EN-P - June 2008
Page 134
134
Maintaining Your Control System
Storing Store the lithium batteries in a cool, dry environment, typically 20...25 °C (68...77 °F) and 40...60% relative humidity. Store the batteries and a copy of the battery instruction sheet in the original container, away from flammable materials.
Transporting One or two batteries - Each battery contains 0.23 grams of lithium. Up to two batteries can be shipped together within the United States without restriction. Regulations governing shipment to or within other countries may differ. Three or more batteries - Procedures for the transportation of three or more batteries shipped together within the United States are specified by the Department of Transportation (DOT) in the Code of Federal Regulations, CFR49, “Transportation.” An exemption to these regulations, DOT - E7052, covers the transport of certain hazardous materials classified as flammable solids. This exemption authorizes transport of lithium batteries by motor vehicle, rail freight, cargo vessel, and cargo-only aircraft, providing certain conditions are met. Transport by passenger aircraft is not permitted. A special provision of DOT-E7052 (11th Rev., October 21, 1982, par. 8-a) provides that: “Persons that receive cell and batteries covered by this exemption may reship them pursuant to the provisions of 49 CFR 173.22a in any of these packages authorized in this exemption including those in which they were received.” The Code of Federal Regulations, 49 CFR 173.22a, relates to the use of packaging authorized under exemptions. In part, it requires that you must maintain a copy of the exemption at each facility where the packaging is being used in connection with shipment under the exemption. Shipment of depleted batteries for disposal may be subject to specific regulation of the countries involved or to regulations endorsed by those countries, such as the IATA Restricted Articles Regulations of the International Air Transport Association, Geneva, Switzerland.
Publication 1747-UM011G-EN-P - June 2008
Page 135
Maintaining Your Control System
IMPORTANT
135
Regulations for transportation of lithium batteries are periodically revised. Refer to http://www.dot.gov for the latest shipping information.
Disposal ATTENTION
Do not incinerate or dispose of lithium batteries in general trash collection. Explosion or violent rupture is possible. Batteries should be collected for disposal in a manner to prevent against short circuiting, compacting, or destruction of case integrity and hermetic seal.
For disposal, batteries must be packaged and shipped in accordance with transportation regulations, to a proper disposal site. The U.S. Department of Transportation authorizes shipment of “Lithium batteries for disposal” by motor vehicle only in regulation 173.1015 of CFR 49 (effective January 5, 1983). For additional information contact: U.S. Department of Transportation Research and Special Programs Administration 400 Seventh Street, S.W. Washington, D.C. 20590 Although the Environmental Protection Agency at this time has no regulations specific to lithium batteries, the material contained may be considered toxic, reactive, or corrosive. The person disposing of the material is responsible for any hazard created in doing so. State and local regulations may exist regarding the disposal of these materials. For a lithium battery product safety data sheet, contact the manufacturer. Sanyo Energy Corporation 600 Supreme Drive Bensenville, Il 60106 USA or
Tadarand U.S. Battery Division 2 Seaview Blvd. Port Washington, NY 11050 USA
Publication 1747-UM011G-EN-P - June 2008
Page 136
136
Maintaining Your Control System
Install and Replace the Battery of the SLC 5/01 or SLC 5/02 Processor
Back-up power for RAM is provided by a replaceable battery. The lithium battery provides back-up for approximately five years for the 1747-L511 processor and two years for the 1747-L514 and 1747-L524 processor. A red BATTERY LOW status indicator alerts you when the battery voltage has fallen below a threshold level. Once the BATTERY LOW status indicator goes on, do not remove processor power or your program may be lost. Replace the battery as soon as possible. You can replace the battery while the processor is powered. Follow this procedure to install or replace the battery. 1. Open the door of the processor. 2. If you are installing a battery in a new processor (battery never installed before), remove the jumper from the battery connector socket. Store the jumper in safe place for possible future use without the battery. If you are replacing an old battery, unplug the existing battery connector and remove from the retainer clips. The figure below shows where to install the battery in a SLC 5/01 or SLC 5/02 processor. 3. Insert a new or replacement battery in the holder making sure it is held in by the retainer clips. 4. Plug the battery connector into the socket.
White Lead Red Lead Battery Connector
5. Close the processor door. Publication 1747-UM011G-EN-P - June 2008
Battery
+
Retainer Clips
Page 137
Maintaining Your Control System
Replace Your SLC 5/03, SLC 5/04, or SLC 5/05 Battery
137
Your SLC 5/03, SLC 5/04, or SLC 5/05 processor provides back-up power for RAM through a replaceable lithium battery. This battery provides back-up for approximately 2 years. A BATT status indicator on the front of the processor alerts you when the battery voltage has fallen below a threshold level. To replace the lithium battery, follow these steps. Do not remove the processor from the SLC 500 chassis until all power is removed from the SLC 500 power supply.
ATTENTION
1. Remove power from the SLC 500 power supply. 2. Remove the processor from the chassis by pressing the retainer clips at both the top and bottom of the module and slide it out. ATTENTION
Do not expose the processor to surfaces or other areas that may typically hold an electrostatic charge. Electrostatic charges can alter or destroy memory.
3. Unplug the battery connector. The figure below shows the battery connector location.
Battery
Red
White
Battery Connector
Publication 1747-UM011G-EN-P - June 2008
Page 138
138
Maintaining Your Control System
IMPORTANT
The SLC 5/03, SLC 5/04, and SLC 5/05 processors have a capacitor that provides at least 30 minutes of battery back-up while the battery is disconnected. Data in RAM is not lost if the battery is replaced within 30 minutes.
4. Remove the battery from the retaining clips. 5. Insert a new battery into the battery retaining clips. 6. Plug the battery connector into the socket as shown in the figure on page 137. 7. Insert the module back into the SLC 500 chassis. 8. Restore power to the SLC 500 power supply.
Replacing Retainer Clips on an I/O Module
If it becomes necessary to replace the retainer clip (also called self-locking tab), order catalog number 1746-R15 (4 per package). Retainer Clip
Holding Tabs
Publication 1747-UM011G-EN-P - June 2008
Page 139
Maintaining Your Control System
139
Remove Damaged Retainer Clips If necessary, pry off the broken retainer clip from the bottom with a screwdriver. Do not twist it off. You can damage the module. Retainer Clip
Install New Retainer Clips Insert one of the pins of the retainer clip into the hole in the I/O module and then snap the other end in place.
Replace a Fuse on the Power Supply
Follow this procedure to replace a fuse on the power supply (only for the 1746-P1, 1746-P2, and 1746-P3 power supply). 1. Remove power from the SLC 500 power supply. 2. Open the door on the power supply and use a fuse puller to remove the fuse. ATTENTION
Use only replacement fuses of the type and rating specified for the unit. Improper fuse selection can result in equipment damage.
Publication 1747-UM011G-EN-P - June 2008
Page 140
140
Maintaining Your Control System
3. Install a replacement fuse. See the figure below for fuse placement. POWER
Fuse 3-Pin Jumper
ATTENTION
Publication 1747-UM011G-EN-P - June 2008
The exposed pins on the 3-pin jumper is electrically live. Contact with the pin may cause injury to personnel.