The text of a manual · part 2 of 5
Power Focus Quick Guide, pages 11 to 20
Pages 11 to 20 of 48
The original document is the PDF (1.8 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
Filed in the catalog under the Atlas Copco PF3007-C-HW and Atlas Copco PF3007-G-HW
Page 11
CONNECTING TOOLSTALK VIA ETHERNET 1) Set an IP address and Subnet mask to the Power Focus you wish to connect to. With the PF Compact, connect serially ToolsTalk to the controller and go under Config – Communication:
– Set the IP address of the connected Power Focus to a unique number within the network. – Set the Subnet mask according to network partitioning. – Store and Restart the Power Focus. With the PF Graph, you can also use ToolsTalk serially or the Keypad in Prog – Config – Remote Communication.
11
Page 12
CONNECTING TOOLSTALK VIA ETHERNET 2) Set IP address and Subnet mask to your own PC under Start / Settings / Local Area Network connection/ Internet Protocol (TCP/IP) Properties.
2)
Then in ToolsTalk under Options/Settings/Communications/ Ethernet set-up, you can: 3) Select the type of connected Power Focus (Netmaster, Cellmaster or Controller). 4) Set the Port number and Controller IP address of the PF you wish to connect to.
4)
3)
5) You are now ready to connect to the selected PF with a double click in the PF Map or on the connect button.
12
Page 13
PSET PROGRAMMING IN PF COMPACT The PF compact keypad allows an Autoset Programming. The PF will recognise joint stiffness and adjust the tool for maximum performance for that particular joint: 1) Press the AUTOSET button once and ASEt/Ft appears on the display. 2) Choose final torque target by pressing +/buttons.
/
3) Press the ENTER button once to activate the Autoset function. 4) The Graph LED, lights up. 5) Make 5-8 tightenings until the Graph LED lights goes down. Optimum performance has been found and the system is ready for production. Changing Final Target value 1) Press the Function button once and F1/Ft alternates in the display 2) Press Enter to select the new Final Target value. Change the value by pressing the +/– keys /
/
3) Press Enter to save and exit Setting Batch count 1) Press the Function button five times and F5/batS alternates in the display, indicating that a Pset is selected. Otherwise F5/---- is displayed. 2) Press Enter to access the Batch Size value. Change the Batch Size value by pressing the +/- keys. 3) Press Enter to save and exit.
13
/
Page 14
QUICK REFERENCE GUIDE This Pset example is a help when programming with the PF Graph or ToolsTalk. Torque Control / Angle Monitoring Two Stage Tightening Torque
P123 Final angle P122 Final angle min
P124 Final angle max
P114 Final tq max
P113 Final Target
Acceptance window
P112 Final tq min
P120 Start final angle P115 Cycle complete
P110 Cycle start
Angle Time P142 Soft start time P141 End time P132 Step 2 speed P130 Soft start speed
P136 Step 2 ramp
P135 Step 1 ramp
P131 Step 1 speed
Tool speed
P1xx Programming Open new Pset P13x Speed/Ramp P130 Soft start speed P131 Step 1 speed P132 Step 2 speed P135 Step 1 ramp P136 Step 2 ramp P10x Control Strategy P100 Tq con/Ang mon P101 Two stage
P14x Time P141 End time P142 Soft start time P144 Cycle abort timer P11x Torque P110 Cycle start P111 First target P112 Final tq min P113 Final target P114 Final tq max P115 Cycle complete
14
P15x Batch P150 Batch count P151 Batch size P12x Angle P120 Start final angle P121 Measure angle to - Peak tq - Angle peak - Cycle complete P122 Final angle min P124 Final angle max
Page 15
PSET PROGRAMMING IN PF GRAPH Navigate through the menus with the arrow buttons on the front panel and confirm selections with the Enter button.
1) Press the PROG button and the programming window will appear. Then, Select Pset – Programming – Control. 2) Select Control Strategy You can choose between: – Torque Control – Torque Control / Angle Monitoring is defaut prog. – Torque Control / Angle Control (Tq con / Ang con [AND]/[OR]) – Angle Control / Torque Monitoring – Reverse Angle – Rotate spindle forward/reverse – Click wrench 3) Select Tightening strategies You can choose between: – One stage – Two stage – Quick Step – Ergoramp
Two Stage is default prog. The tool operates at high speed during the first stage and at lower speed during the second stage. The tool stops for about 50 ms between stages to reduce joint relaxation.
15
Page 16
PSET PROGRAMMING IN PF GRAPH 4) Go back one level and select To rque. Set the Torque parameters and Store. Go back one level and select Angle. Set the Angle parameters and Store. 5) Continue the programming by setting in the same manner: Speed and Ramp Step 1 Speed is the speed used during the rundown. When First Target is reached, the tool slows down to Step 2 Speed to tighten the second stage. To finish the tightening the tool goes into Zoom Step Speed for operator comfort and minimization of overshoot. Time Soft Start time facilitates screw engagement by turning at a very low speed during the soft start time. Batch count Enables you to control the number of tightenings. You can also lock the tool at Batch OK. 6) Press Store to save the Pset.
16
Page 17
PSET PROGRAMMING IN TOOLSTALK
1) Right click on Pset in PF Map and select create new Pset.
2) The Create New Pset window pops up. Name (optional) the Pset and click OK.
3) The programming window appears. Select the following and click store. – Control Strategy – Tightening Strategy – Rundown angle – Zoom step – PF 2000 compatible Please refer to the Graph programming for explanation of the different parameters.
17
Page 18
PSET PROGRAMMING IN TOOLSTALK 4) Click on Torque or Angle in the menu tree and set the Torque and Angle parameters. Hint! Display limits for each parameter by holding the cursor in respective parameter box. 5) Continue the programming by setting Speed and Ramp, Time and Batch Count parameters in the same manner. 6) Click Store to save the Pset. QUICK PROGRAMMING You only need to set the following parameters: – Control Strategy – Joint Angle – Final Target All other parameters are calculated and set automatically by Power Focus.
18
Page 19
CONFIGURATION The configuration set-up contains the configuration parameters which are unique for each Power Focus unit. It contains four subgroups:
1
2 3 4
1. The System set-up contains basic Power Focus features such as name, language and the appearance of the Power Focus Graph display. 2. I/O Setup – Apart from the internal I/O ports it is also possible to connect up to 15 external I/O devices to the Power Focus I/O bus. 3. Communication – Ethernet and Serial communication links, ToolsTalk and database applications such as ToolsNet, etc. IP addresses and baud rates etc are set-up in this window. 4. P ro t o c o l s – This window contains the settings for each communication protocol.
19
Page 20
SOCKET SELECTOR SETUP The selector is an accessory that can guide the operator through a JOB sequence with LEDs. When a socket is lifted, the corresponding Pset will be selected. The selector is available in 4 and 8 positions.
Selector 4 positions
1) Hardware Setup: Connect the selector via I/O bus to the Power Focus. Make sure that the I/O bus is terminated. 2) Software Setup: Go in ToolsTalk under Configuration and I/O Setup and select Selector Pset under appropriate I/O. The device number on the hexagonal switch in the back of the socket tray should have the same number as the device number where the tray is set up in ToolsTalk.
3) Click on Set and drag the Psets that you have created before in the desired positions of the socket tray.
4) Store. Then go back to Other I/Os and set the Pset select Source to Selector.
20