The text of a manual · part 3 of 5
Power Focus Quick Guide, pages 21 to 30
Pages 21 to 30 of 48
The original document is the PDF (1.8 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
Filed in the catalog under the Atlas Copco PF3007-C-HW and Atlas Copco PF3007-G-HW
Page 21
RE-ALARM & I/O EXPANDER SETUP The RE-alarm gives status information to users using lights and/or audible signals. It is connected to the Power Focus on the I/O-bus.
RE-A larm
Detailed setup: please refer to the Selector as it is very similar. It is possible to configure the information you want to see.
Config. of the 4 alarms
The I/O Expander enables the connection of several inputs and relays when more than those built-in are required. There are 8 inputs and 8 relays with the same functionality as the four built-in I/Os. Each input and relay can be configured individually. I/O Expander
Detailed setup: please refer to the Selector as it is very similar.
21
Page 22
OTHER I/O SETUP Other inputs and outputs to the Power Focus are set-up in this branch, most notably are the Tool start select source, Job select source and Pset select source.
Tool start select source can be: – Tool trigger – Digital Inputs – Fieldbus – Sync Start Job select source can be: – Off – Digital Inputs – Ethernet Serial – Identifier – Fieldbus – PF Keyboard
Pset select source: – Off – Selector – Digital Inputs – Ethernet Serial – Identifier – Fieldbus – PF Keyboard
The ”Other I/O Setup” can often be the problem source for trouble shooting if the Power Focus behaves incorrectly.
22
Page 23
COMMUNICATION / PROTOCOL Power Focus communicates by both Ethernet and Serial communication links and can tie in with ToolsTalk and database applications such as ToolsNet, etc. I P addresses and baud rates etc are set-up in this window. Remote com The IP address configuration of the Power Focus is set-up in this branch. This is a prerequisite if you want to communicate with the Power Focus via Ethernet or set up a cell (see cell programming). ToolsNet set-up The ToolsNet communication is turned on and configured in this branch. Make sure that the Power Focus is set-up in accordance with IP address and port number of the ToolsNet server.
Multicast set-up Multicasting of tightening results is turned-on and configured in this branch. The multicasting must be turned on in order for the Factory Overview Software to work.
23
Page 24
IDENTIFIER SETUP
With Power Focus it is possible to use a barcode (typically the VIN Number) to select Jobs or Psets. 1) Start by connecting ToolsTalk and the Identifier (Barcode reader) to the Power Focus. 2) In ToolsTalk click on Identifier in the PF Map. Set Identifier input source and click on Set Significant No.
2)
24
Page 25
IDENTIFIER SETUP 3) Select the positions where the significant information is located in the barcode. 1 – 10 numbers can be selected (it is not necessary to set them in a row). 3)
4) Click on Set Identifier Setup. Enter a string in the Add Identifier string field and click Add. 5) Once all strings are entered, associate them with a Pset, Multistage or Job by double clicking in the corresponding cell in the matrix.
4)
5)
25
Page 26
MULTISTAGE PROGRAMMING IN TOOLSTALK The Multistage feature allows you to dynamically link up to eight (8) parameters in several steps to perform a sequence of operations. It is used for joints with high relaxation.
1) Create the different Psets separately. 2) Right click on Multistage in the PF Map and select Create New Multistage , choose ID, Name and click OK. 3) Click Add to open a window where you can select Psets to be included in the Multistage. 4) Edit the Multistage Properties and Store your programming.
26
Page 27
JOB PROGRAMMING This is a typical application for a Job: an object with bolts that require different torque values and number of tightenings: 1. Four bolts that require torque X. 2. Three bolts that require torque Y. 3. One bolt that requires torque Z. You do the programming like this: 1) Right click on Job in the PF Map and select Create New. 2) The Job window appears where you will find a list of all the available Psets and Multistages.
3) Select the desired Psets and Multistages and add them to the Edit Job list by clicking either Manual select or Auto select. 4) Set the batch size. 5) Select and set Job options parameters. Note! Forced job must be selected if Auto Select is used.
27
Page 28
CELL SETUP PROGRAMMING The Cell and Net concept is part of the Silver and the Gold software versions. A Cell consists of one Cell Master and a maximum of 19 Cell Members. Here is an example with 3 Cell members. Cell Members
Cell Master
Cell Member
Sw it c h 1) Connect the different Cell members with an Ethernet cable via a switch. 2) Configure Password and Name for Cell master: – Set Channel ID to a unique number within the cell [1-20]. – Set Cell ID to a unique number within the network. Click Store to save the settings.
28
Page 29
CELL SETUP PROGRAMMING 3) Complete Config-Communication for the Cell master: – IP address, Subnet mask and Default router. – Define a Cell Master by setting Cellmaster IP address equal to the IP address of the same controller. – Click Store to save the settings. – Restart the Power Focus!
4) Repeat a similar programming for cell members but change the channel ID and set Cell Master IP address in the appropriate field. Now you are ready among others to program a Cell Job where several Power Focus units are involved. Cell Jobs run in the same way as ordinary jobs with a Job reference as the main controller.
29
Page 30
SYNCHRONISATION PROGRAMMING With the Gold RBU version, you have the possibility to create a Sync Group and synchronise 2 to 10 spindles to perform the same task simultaneously. This is an example with 4 synchronized Power Focus units.
Hardware setup 1) Connect all Sync Members and the Sync Reference via the I/Obus. Do not forget to terminate the I/O bus with terminators. 4 3 2
Sync Master Back pannel
+
+ + I/O Bus Terminators
2) Configure the 4-pin remote start connector on remote start for the sync members and according to the selected start signal input on the Sync Reference.
30