The text of a manual · part 13 of 33
Power Focus 3000: Control and Drive Unit for TENSOR-S Electric Nut Runners: User Interfaces, pages 113 to 122
Pages 113 to 122 of 315, from Power Focus 3000: Control and Drive Unit for TENSOR-S Electric Nut Runners
The original document is the PDF (7.3 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
Filed in the catalog under the Atlas Copco PF3007-C-HW and Atlas Copco PF3007-G-HW
Page 113
Parameter Set (Pset)
7.2 •
Creating a Pset using ToolsTalk
Right click on Pset in the PF Map and select Create New Pset. (Or select Create New Pset from the Edit menu.)
The Create New Pset window pops up. •
Name (optional) the Pset and click OK
The programming window appears. •
Select the following and click Store. - Control Strategy - Tightening Strategy - Rundown angle - Zoom step - PF 2000 compatible
113
Page 114
Parameter Set (Pset) •
Click on Torque or Angle in the menu tree and set the Torque and Angle parameters.
Hint! Display limits for each parameter by holding the cursor in respective parameter box.
•
Continue the programming by setting Speed and Ramp, Time and Batch Count parameters in the same manner.
•
Click Store to save the Pset.
114
Page 115
Parameter Set (Pset)
7.3
Auto Set
An easy way to program a Pset is to use the Auto Set function. Enter a Final target torque value, perform a few tightenings and a new Pset is created. Power Focus 3000 adapts the programming to the specific joint and sets all the parameters automatically. Auto Set does not change any parameters outside the used Pset. Auto Set can only be selected when a tool is connected. Clicking on Auto Set brings up a dialog box, prompting you to enter a tightening torque. Enter a value, press OK and perform a few tightenings. The first two tightenings will be completed at very low speed. Normally, three to ten tightenings are required in order for the Power Focus to calculate and set the required parameters appropriate to the specific joint characteristics. Torque control / angle monitoring is the used strategy for Auto Set when Tensor-S tools are used. In the case of DS –tools, DS control is the tightening strategy used. When Auto Set is active, a green light is will appear on the front panel of the Power Focus unit. When this signal is shut off, Auto Set is finished and the Power Focus unit is now programmed for that joint. The Auto Set procedure can be aborted by pressing cancel before the green light goes off. Note! When the Auto Set is complete the new settings are saved and previous ones are erased.
7.3.1
Auto Set using Power Focus 3000 Compact
•
Press the Auto Set button on the front panel.
•
Enter a torque value by pressing the plus or minus button until the desired value is reached and press Enter.
•
Perform a couple of tightenings. Power Focus 3000 will automatically calculate and set the parameters.
•
Pressing the Auto Set button again before the Auto Set is done will abort the function and restore the previous settings.
115
Page 116
Parameter Set (Pset)
7.3.2
Auto Set using Power Focus 3000 Graph
•
Press the PROG button on the front panel.
•
Select Pset.
•
Select Auto Set by navigating with the arrow buttons or by pressing the corresponding soft button.
•
Input a final target torque and press Enter.
•
Press OK
•
Perform a few tightenings and press OK when prompted.
•
Pressing Cancel button before the Auto Set procedure is complete will abort the function and restore the previous settings
116
Page 117
Parameter Set (Pset)
7.3.3
Auto Set using ToolsTalk
•
Right click on Pset in the PF Map to Create New Pset. (You can also use an existing Pset, the parameters of which will be erased and replaced by the Auto Set calculated parameters.)
•
Type New PsetID and New Pset Name .
The Pset window appears. •
Click on the Auto Set button in the Pset window.
•
Enter Final Target value and click OK.
•
Perform a few numbers of tightenings with the tool.
•
Click OK when prompted.
•
Pressing the Cancel button before the Auto Set procedure is completed will abort the function and restore the previous settings.
117
Page 118
Parameter Set (Pset)
7.4
Quick Programming
Quick programming is intended to help you to quickly configure a Pset and give you the opportunity to use the Power Focus 3000 after a fast and simple programming. After completing a Quick programming procedure, you can start to use the tool and tighten to the correct torque straight away. It might be necessary to fine-tune some parameters in order to ensure smooth operation of the tool. You only need to set the following parameters: -
Control Strategy Joint Angle Final Target
All other parameters are calculated and set automatically by Power Focus 3000. Perform settings as follows: Control Strategy Select Control Strategy. Press Enter and make a selection. The choices are: 1. Tq con/Ang mon 2. Tq con/ Ang con (AND) 3. Ang con/Tq mon 4. DS con Final target Set the desired Final Target torque value for the joint. Joint Angle The Joint Angle is the distance from when the screw (nut) head touches the surface, and the torque starts to build up, until it is tightened to the correct torque. It is possible to measure the Joint angle by using a torque wrench. For “hard” joints, it is suitable to set the value to 30 degrees. For “soft” joints we recommend to set the joint angle above 100 degrees. This gives a better tightening during the first stage and a distinct second stage. If you consider the second stage too long, adjust the angle until you are satisfied. Observe that it is important that the second stage exists, otherwise the tool may jerk at full torque. Note! When accepting the new settings by pressing OK, the previous Pset settings are erased.
118
Page 119
Parameter Set (Pset)
7.4.1
Quick Programming using Power Focus 3000 Graph
•
Press the PROG button on the front panel.
•
Select Pset and press the right arrow button to get to the next level in the menu tree.
•
Select Quick Programming by navigating with the arrow buttons or pressing the corresponding soft button.
•
Select Control strategy and enter Joint angle and Final target.
•
Press the OK button to confirm selections and press the RESULT button to get back to the main window.
119
Page 120
Parameter Set (Pset)
7.4.2
Quick Programming using ToolsTalk
•
Right click on Pset in the PF Map to Create New Pset.
•
Type New PsetID and New Pset Name.
•
The Pset window appears.
•
Click the Quick Programming button in the Pset window.
•
Select Control strategy, enter Joint Angle and Final target.
•
Click OK to confirm the settings.
120
Page 121
Multistage
8
Multistage
Click on the Multistage icon in ToolsTalk to view the Multistage window. Press the PROG button on a Power Focus 3000 Graph keyboard to enter the Multistage menu section. The Multistage feature allows you to dynamically link up to eight (8) parameters in several steps to perform a sequence of operations. A typical application scenario such as joint conditioning, where you may wish to run the fastener to a torque level of say 10Nm then back it of 360 degrees and then fasten to a final torque level of 20Nm, this operation would be regarded as 3 step multistage. All performed by the operator when in a hand held configuration by depressing the trigger in the normal mode till the end of the operation, or alternatively when used say in a fixed operation where the start signal is either latched or externally triggered.
Multistage: 1: Pset 1 10 Nm 2: Pset 2 Back off 180° 3: Pset 3 14 Nm
The results from a Multistage are handled as if it is a normal Pset. To do this, the results and the statistics are a combination of all results from the different Psets within the Multistage. You can pick one torque value and one angle etc. The default setting, is all results from the last Pset in the Multistage. Individual Pset min and max limits works in all stages and the tool will shut of when a max limit is exceeded as per normal operation. The result displayed will then be taken from the stage where the shut off occurred. 121
Page 122
Multistage
8.1
Creating a Multistage using Graph
Navigate the menus with the arrow buttons on the front panel and confirm selections with the Enter button. •
Press the PROG button.
•
Select Multistage and then press the right arrow button to open the next lower level in the menu tree.
•
Select Setup and than select Admin.
•
Select Create new multistage.
•
Select an identification number, press Enter and then go back one level by pressing the left arrow button.
•
Select MS Programming and then Options (see Option list below).
Parameter
Default value Name multistage ---
Description
Pset list
---
Batch count Batch size
Off 0
Lock at batch OK Stop between stages
No
Here you select the Psets that are going to be included in the Multistage. Here you activate Batch count. The Batch size specifies the number of Multistage tightenings in a batch. Here you decide if you want the tool to be disabled (locked) after reaching Multistage batch OK. When Stop between stages is set to yes, tightening has an idle time between two consecutive stages. The idle time is specified in Tool idle time.
Yes
Name the Multistage.
•
Select Pset list.
•
Press Add to see a list of available Psets.
•
Make a selection and press Enter
•
Repeat the procedure until all desired Psets are added to the Pset list
•
Press OK and then press Store to save the Multistage.
•
Press the RESULT button to get back to the main window.
122