Page 221

-25-

Chapter 10 small test programme which initializes the PIA and so that you can test each PIA line separately. 10.7

STEPPER-MOTOR DRIVE

Frequently, an interface application will require that the PC controls the motion of an object. A device that is often used to power or move a shaft in precise increments, directions and speeds is a stepper motor. Here we consider two approaches to this problem. The first uses the stepper motor, a device whose angle of rotation is known reliably from the pulses which have been sent to it. Once c a l i b r a t e d and initialized, no feedback of the rotor's position is necessary, unless the speed demanded is too high or the torque required is too great. Running a motor this way w i t h o u t feedback is called OPEN LOOP. The second m e t h o d uses f e e d b a c k , is a CLOSED LOOP approach, and is called a servo system. The servo system can respond more quickly and accurately than the open-loop stepper motor system and is relatively insensitive to hardware variations. However, it requires position sensors as well as more complicated drive electronics to ensure stability. Next we have to distinguish between two d i f f e r e n t ways of driving the motor. The first m e t h o d is to implement the stepping sequence by hardware. We have only to send o u t p u t strobes, and a signal for direction pulses for the coils of the motor are generated by the hardware. The hardware implementation has the advantage of relieving the CPU from dedicated timing loops; also it is safe even if the CPU crashes. The CPU only has to know when to send the next pulse. This is mostly done on an i n t e r r u p t driven basis . The second method to drive stepper motors is completely handled from the CPU by I/O Ports (PIA) and c u r r e n t drivers. The CPU has to provide, via software, the correct phases for appropriate lengths of time. A typical example for the system is shown in Fig. 10.12.

second method using an OPEN LOOP

Troubleshooting in such a system is very simple. You can only check if power is applied to the drivers and if pulses are coming out of the PIA and passed through the drivers. If there are no output pulses provided by the PIA, refer to S e c t i o n 10.6.

(235)

Page 222

Chapter

10

-26-

-O A

-O B

CPU . output < ports Ik2

>f -OC

Stepper motor

-O D lt<2 Open-collector driver array

I Common

Current -* - - o limited +24V supply

Fig.

10.12:

„

Open loop transistor driving circuit for 4-phase stepper motor

In the other case, a CLOSED LOOP system, things become more complicated. A simple CLOSED LOOP system is represented in Fig. 10.13.

/n/.«* fo

• Mo/or Coi<s fror*

Portion Encoder

Fig.

10.13:

Closed loop stepper motor driver with position encoder

There are two possible faults. The first is the driving c i r c u i t , as described before. The second is the position encoder

(236)

Page 223

-27-

Chapter 10 which indicates the momentary position of your driven system. It strongly depends on the encoder which kinds of signal are fed back to your controlling device. If you find out during troubleshooting that the driving circuit works c o r r e c t l y but the position is incorrect, you have to check the feedback loop. Depending on the position of the encoder in use, check if the o u t p u t signals are correct.

10.8

CONCLUSION

Dealing with interfaces, especially if they don't work, can be a tough job. N e v e r t h e l e s s , you have to do it; a few additional tips for troubleshooting are listed below.

1.

Never start manuals; a lot operation.

your of job before you have read the operating result from a wrong setup and problems

2.

Before you start troubleshooting on boards, study the circuit diagrams; if they confuse you, try to draw functional block diagrams for it makes your job easier.

3.

Write down everything you are doing; maybe the next day won't remember what you d i d .

4.

Follow the signals from the destination to the source.

5.

Make timing t ogether .

6.

If possible try to implement your own simple test software to perform step-by-step testing. It makes everything more transparent.

diagrams to learn how signals are you related

(237)

Page 224

Chapter 11 DEDICATED INSTRUMENTS

Page 225

-1-

Chapter 11

DEDICATED INSTRUMENTS

11

Previous chapters are devoted to the instruments that are used NIM modules and M C A . Two in nuclear research laboratories: in other applications are examples of the i n s t r u m e n t s used described below. SURVEY METER

11.1

11.1.1

Fields of A p p l i c a t i o n

Ionizing radiation dose-rate meters, or simply survey meters, are the most important measuring instruments in r a d i a t i o n safety. We have no sensory organ to g u i d e us on the i n t e n s i t y of ionizing radiations present in our environment due to n a t u r a l or a r t i f i c i a l sources. W i t h o u t proper measuring systems one m i g h t be exposed to h e a l t h d e t e r i o r a t i n g r a d i a t i o n levels.

Survey m e t e r s are used in radioactive-ore p r o s p e c t i n g as well. If the instrument is not functioning according to s p e c i f i c a t i o n , the ore may not be located, and the n a t u r a l resource would remain hidden.

It is important to realize that if the survey meter is not functioning p r o p e r l y , we might be harmed by r a d i a t i o n or loose ore fields. The p r o b l e m is that sometimes the f a u l t develops very slowly, w i t h o u t dramatic signs. The repair staff and the user should know how to check the p e r f o r m a n c e of the survey m e t e r to overcome the hazards to h e a l t h and p r o p e r t y . 11.1.2

C o n t r o l s , Turning On and Quick Functional Checks

On most survey meters a single multi-function rotary switch is used to : - turn on and turn off the instrument, battery checking is the first p o s i t i o n after the s w i t c h e d - o f f state; - c o n t r o l the measuring range selection. Some designs have ZERO-SETTING and CALIBRATION controls as well.

xl xlO xlO2 xlO 3

Q3

TEST

ON

PROBE

C/S

Fig.

1 1 . 1 : Front panel of a t y p i c a l r a d i a t i o n m o n i t o r

(241)

Page 226

Chapter 11

-2-

In ore p r o s p e c t i n g , the use of energy-selective measuring channels is r a t h e r common. The front panel of a t y p i c a l survey meter with a s c i n t i l l a t i o n d e t e c t o r is shown in Fig. 11.2.

ISOTOPE SELECTOR

ENERGY

WINDOW no o MANUAL

CRM

RANGE o

MODE SWITCH

O

Fig.

11.2:

PRESET

ON

TEST OFF

Front panel of a t y p i c a l survey-meter

Controls for the energy and the i n t e n s i t y range s e t t i n g are common with the single channel analyzers. The r a d i a t i o n intensity can be read from either a moving-coil meter or a d i g i t a l display. The first step of the quick f u n c t i o n a l test is the same for both design v a r i a n t s : the instrument should be t u r n e d into the b a t t e r y checking position, The indication should be: BATTERY OK, or similar. If this is not so, one should use the STOCK FAULT LIST given in section 11.5. If the BATTERY OK c o n d i t i o n was i n d i c a t e d , the second step can be started by following the calibration i n s t r u c t i o n s of the manual: adjusting the controls to the a p p r o p r i a t e ranges after the i n s t r u m e n t was zeroed. Then the c a l i b r a t i n g r a d i o a c t i v e source of the unit should be put before the d e t e c t o r at a given distance. The readings should match with those given in the calibration c e r t i f i c a t e of the unit. If this is not so, one should use the STOCK FAULT LIST in section 11.5. W h a t should you do if you have data on e x p e c t e d readings?

no c a l i b r a t i o n i n s t r u c t i o n s or

If the instrument arrived without any such data i n s t r u c t i o n s , you should inform the s u p p l i e r and ask replacement under the warranty.

and for

If the ins t r u m e n t has a l r e a d y been w i t h you for a long t i m e , you mus t set up your own testing fac ility . For this you need a s m a l l ac t i v i t y , Cs-137 or Sr-90 r a d i o a c t i v e source. You mus t have i n f o r m a t i o n on the present a c t i v i t y or the source , wh ich shou Id p r e f e r a b l y be b e t w e e n 15-150kBq, or according to the Radia tion Safety R e g u l a t i o n s of your area, If you know t h e a c t i v i ty of the source and its d i s t a n c e to t h e d e t e c t o r , the dose- rate can be calculated with acceptable accuracy for such types of quick tests.

(242)

Page 227

Chapter 11

-33.

The dose-rate readings should match the calculated values with less than +/- 50% difference.

4.

This checking, however, is a very rough functional one, indicating only that the instrument is o p e r a t i n g , so could not substitute the calibration of the instrument in your National Metrological I n s t i t u t e or e q u i v a l e n t .

5.

If your instrument was recently c a l i b r a t e d in the N a t i o n a l M e t r o l o g i c a l I n s t i t u t e , it is a good p r a c t i c e to take readings in standardized geometry w i t h your own reference source, and to use this data in future quick functional tests. If you can cover more intensity ranges, the better. Your "work investment" will pay off in reduced t r o u b l e s h o o t i n g time.

11.1.3

Operating Principles of Systems with Various Detectors

All survey meters have an ionizing r a d i a t i o n d e t e c t o r and c i r c u i t s to convert the d e t e c t o r - s i g n a l - c a r r i e d i n f o r m a t i o n into dose-rate information and a display unit. The survey m e t e r s are b a t t e r y - o p e r a t e d , p o r t a b l e units. With a few e x c e p t i o n s , they contain DC/DC converters for the d e t e c t o r s u p p l y , as well as for the low vol tage.

DETECTOR

SIGNAL PROCESSING

DISPLAY

HIGH VOLTAGE REGULATED SUPPLY

LOW VOLTAGE REGULATED SUPPLY

BATTERY

Fig. 11.3:

11.1.3.1

Block diagram of a survey meter

Dose-rate meter with ionization chamber d e t e c t o r (Fig. 11.4)

In this system a DC/DC converter supplies a few h u n d r e d volts for the ionization chamber. In most cases, the low v o l t a g e electrode of the chamber is connected to a d i f f e r e n t i a l a m p l i f i e r with FET inputs. The phase-inverted output of this amplifier is fed back to the common point of the chamber and the input of the amplifier through a very high ohm value, specially designed and manufactured resistor. Such a circuit configuration can convert very l i t t l e current into voltage. The differential amplifier improves the temperature s t a b i l i t y characteristics of the system. By changing the value of the feedback resistor, the current-tovoltage conversion rate changes as well; the smaller the resistor value, the smaller will be the voltage o u t p u t of the amplifier for the same current. Sometimes the o u t p u t of the a m p l i f i e r drives the

(243)

Page 228

Chapter 11

-4- moving-coil meter d i r e c t l y ; in some other designs an a d d i t i o n a l bridge circuit serves the same purpose. Linear and logarithmic scale v e r s i o n s are a v a i l a b l e to d i s p l a y the dose-rate. The ZEROSETTING control p o t e n t i o m e t e r acts on the non-inverting input of the d i f f e r e n t i a l a m p l i f i e r . In some designs a low pass f i l t e r smooths the m o v e m e n t of the moving coil m e t e r , and other circuits p r o t e c t it from o v e r l o a d i n g . Gn. RESISTOR

Fig. 11.4:

11.1.3.2

Diagram of a survey meter with ionization chamber

Survey m e t e r w i t h Geiger-Mueller tube (Fig.

11.5)

A DC/ÜC c o n v e r t e r s u p p l i e s the Geiger-Mueller tube with its operating v o l t a g e . On the load resistor of the tube, voltage pulses are developed for each ionizing i n t e r a c t i o n if the a p p r o p r i a t e "dead-time" has elapsed since the p r e v i o u s d e t e c t i o n , l e n g t h , and The pulses need to be s t a n d a r d i z e d in a m p l i t u d e and m o n o s t a b l e c i r c u i t s are used for this purpose. In some designs, the pulse l e n g t h d e t e r m i n i n g components (R or C) are m o d i f i e d on d i f f e r e n t dose-rate ranges, so the signals after integration can directly drive the moving-coil meter resulting in a linear d o s e - r a t e scale. In some systems after the i n t e g r a t i n g a m p l i f i e r , a l o g a r i t h m i c a m p l i f i e r is e m p l o y e d to give a three - four decade d i s p l a y span. In order to improve the shock resistance of the system in new designs, they often use d i g i t a l counters with timers instead of the moving-coil meter. INTEGRATOR

GM-TUBE PULSE NORMALIZATION

DETECTOR BIAS SUPPLY

Fig.

(244)

11.5:

LOW VOLTAGE SUPPLY

Main components of a G.-M.

BATTERY counter

Page 229

-511.1.3.3

Chapter 11

Survey meter with scintillation d e t e c t o r s

A DC/DC converter supplies the phot omul tipl1er with the necessary voltage. The current o u t p u t of the phot omul tipl1er is a function of the i n t e r a c t i n g p a r t i c l e energy. In very wide energy range, the c u r r e n t pulses ar e integrated and converted to voltage signals to d r i v e the m o v i n g - c o i l meters. Such systems are often combined with l o g a r i t h m i c a m p l i f i e r s to cover many magnitudes in dose-rates . In ore p r o s p e c t i n g , clinical and another popular version consists of a analyzer with either a counting rate sometimes with a d i g i t a l r a t e m e t e r .

11.1.3.4 industrial a p p l i c a t i o n s , complete single channel meter or a sealer/timer,

Survey meter with semiconductor detectors

A DC/DC converter supplies the d e t e c t o r voltage. The signals, a f t e r linear a m p l i f i c a t i o n , are passed to various pulse-shaping and modifying circuits. In most versions multi-range counting rate-meters develop the driving signal for the moving-coil type display m e t e r . In some advanced neutron dose-rate meters, the energy d e p e n d e n t Quality Factor weighing is done with a microprocessor and an ana log-1o-dig i ta 1 converter system.

11.1.4 11.1.4.1

Diagnostic Procedures Health safety hazards

In all survey m e t e r s DC/DC converters are used to supply the detector voltage. The charge on the filtering capacitors might not be lethal in passing through the person touching it, but u n i n t e n t i o n a l muscle c o n t r a c t i o n s m i g h t cause serious damage.

The diodes in high voltage power supplies are of good q u a l i t y ; the reverse currents are rather low, and due to this, even after tens of m i n u t e s , enough charge might remain to give a painful "kick". All instruments arriving for repair should be carefully checked for the "bleeder resistors" presence, having the role of a u t o m a t i c a l l y discharging the high voltage capacitors. Survey m e t e r s are often used in areas where they might be exposed to radiological contaminations. It is very important to check all units entering the workshop for this, and all repair work should be done only on radiologically safe instruments.

11.1.4.2

High value components safety

It is very important to inform the repair staff on the proper handling and testing of the v a l u a b l e , hard-to-replace components.

(245)

Page 230

Chapter 11

-6-

The most often destroyed meters are the following:

components during repair of survey

- FETs, due to electrical discharge;

- phot omul tipliers, due to exposure to daylight is on . 11.1.4.3 when HV

Preparation of the survey meter for diagnostic procedures

The instrument should be checked for nuclear safety, and then for electrical safety; it should enter the repair workshop only if both conditions were properly tested and d o c u m e n t e d . One can save q u i t e a lot of problems in the case of a lethal a c c i d e n t if it can be proved that such precautions were taken. The instrument should be properly cleaned before the repair work starts because if d i r t can move from one place to another during the repair of an ionization chamber system, such i n s t a b i l i t i e s m i g h t develop which are rather hard to trace later.

Under t r o p i c a l conditions, it is a good general practice to "dry out" the units before s t a r t i n g the repairs. This can be done very e f f i c i e n t l y by a t t a c h i n g a de-humidifier to a box, wardrobe, etc. with closely f i t t i n g doors. A f t e r 48 hours, most of the h u m i d i t y would be removed from the instruments. If you have to open the i n s t r u m e n t , you are kindly r e q u e s t e d to make note of the following suggestions: 1.

Remove b a t t e r i e s from the instrument before starting.

2.

Try to locate the minimum number of screws, etc. gain access to the inside of the instrument.

3.

Mark the screw, e t c . l o c a t i o n s sequence as you remove them.

4.

Put all removed screws in a box or tray in the same sequence as the marked areas. Never leave screws just on the table.

5.

If you have to remove many screws proper markings, make sketches.

with necessary to a washable marker pen in and there is no space to do

It is a justified question, "Why should one put so much energy into such a s i m p l e , routine activity?". It could happen that you will be able to continue this very repair only months from now; it could be that you will remember all screw positions, their lengths in d i f f e r e n t locations, e t c . , but what happens if you don't?

It could happen that somebody else m i g h t finish the job because you were p r o m o t e d or something. You will find it worthwhile in the long run to follow the given suggestions.

(246)