Page 231

Chapter 11

-711.1.4.4

Recommended test instruments

It is a statistically proven fact that 35% of the faults in survey meters could be located with visual inspection, smelling and touching. Please try to rely on your senses before you start using sophisticated instruments. The first item needed in survey meter repairs is the radioactive test source. This should be m a t c h e d to the nature of the survey meter. For example, if you have to repair a neutron dose-rate m e t e r , you must have access to a neutron source during some phase of your work, but please remember that all nuclear detector signals can also be simulated by electrical or electronic means. It is important that users of radioactive sources should be trained on proper handling and storage of these. The simple rules are the following: 1.

If the source is not in use, it should be in its Try to reduce exposure to yourself and to others.

container.

2.

Never touch the source with your hands. the less than 37 kBq activity source.

3.

If you use a radioactive source, do not eating in that room.

4.

You should strictly follow local Radiation Safety rules; wear the film badge or other personal dose-meter, etc.

This even applies for allow smoking or

The next instrument that you will need is a m u l t i m e t e r , preferably with a minimum 20 kohm/volt input resistance with proper connecting cables.

If you have an adjustable low voltage power s u p p l y , it could be advantageous to use this instead of b a t t e r i e s , but this is not essential . It is a good practice to measure the current uptake , so you should have an ammeter, preferably a fused one. To check the operation of the DC/DC converters or the pulses from the Geiger-Muel1er tubes, scintillation d e t e c t o r s , an oscilloscope will be necessary with a minimum 3 MHz b a n d w i d t h and 50 mV/division sensitivity. A standard probe with a minimum 1 MOhm input resistance is enough for most of the tests; however, 1:10 range extender might ease the work.

With the exception of the ionization chamber system, electrical pulses carry the information. You can simulate these with pulses from a generator, having the means to adjust the rate, width and amplitude. So you must have a pulse generator with maximum + /- 10 volts of adjustable amplitude, from 5 microsec to 10 msec w i d t h , and a r e p e t i t i o n rate of between 10 Hz and 10 kHz.

(247)

Page 232

Chapter 11

-8-

For the calibration of the counting-rate meters one should have a sealer with a reasonably accurate time base. The mains frequency in most countries is not suitable for this purpose. In repair of ionization chamber systems, a 10 kOhm multi-turn p o t e n t i o m e t e r with micro-dial can be a useful repair aid to simulate the d e t e c t o r , as shown in Fig. 11.6.

MULTI-TURN POTENTIOMETER USED IN TESTING

Fig. 11.6:

The technique of electronically simulating a radiation detector

In testing DC/DC converter transformer shorts, the ohm meter could give information only on very crude faults. A more sens it ive approach is when the ohm meter is connected into the collector circuit of a transistor (minimum beta - 45) in series with the primary of the transformer under testing. The secondary should be in the base circuit to form a "blocking oscillator", as shown in Fig. 11.7. Note the correct coil connection directions symbolized with the dots. TRANSFORMER UNDER TEST

>. 45

Fig. 11.7:

11.1.4.5 jQ.1 OHM-METER

A simple tester for DC/DC converters

Identification of the key points, signal simulation

DC voltage measurements, or pulse shape observations in the key points, aid the repair efficiency, the quick diagnosis of the fault. (248)

Page 233

-9-

Chapter 11

If the battery of the survey meter is bad, no functions could be expected from it. So the first key test point is the battery output. In most systems there is a possibility to do this checking with the built-in b a t t e r y tester. If the DC/DC converter is f a u l t y , the d e t e c t o r will not operate properly. The second key test point is collector of the transistor d r i v i n g the step-up transformers primary coil. The third key test point is the DC o u t p u t converter. Special care should be taken with m e a s u r e m e n t , because the internal resistance of rather high.

of the DC/DC this voltage this point is

The fourth key point should give information on whether the detector is functioning or not. The best point to check for this is the o u t p u t of the first active component. In the case of the ionization c h a m b e r , a DC level change should be present at this point if a radioactive source - 15 to 150 kBq a c t i v i t y - is moved slowly to the detector and away from it. The pulse rate should change as a function of the source to detector distance in other systems.

The f i f t h key test point should give information on the o u t p u t signal of the display driver, and the sixth should be the presence of the display itself.

There is a possibility to introduce simulated signals or voltage levels to each key test point with proper care and this way one can test the functions of the circuit after that point. For example, instead of the batteries, one can give power from a regulated power supply. The same applies for the DC/DC converters case: if there is no detector voltage, from outside one should give the necessary voltage after the original supply was disconnected from the detector. From a pulse generator, detector signals can be simulated to drive further circuit sections. 11.1.4.6

Identification of key points if circuit diagram is not available

It is easy to find the battery connectors, this is the first key point for testing. For the second key point, one should search near the transformer. The third test point could be located by searching for a filter capacitor with a few hundred volts rating. The fourth test point should be near the signal entry; one should search for active components outputs. One may save much time during future repairs if all identified points are documented, even if only a rough sketch. It is important to save such documents and to make a note in the instruments log-book that such drawing already exists.

(249)

Page 234

Chapter 11

-10-

11.1.4.7

Expected normal voltages, currents and pulse shapes at key points

On the first test point, the voltage should correspond to the number of cells in the unit. If the batteries are new and their short circuit current is over 1 amper, there should be not more than 10% drop if the instrument is switched on. Higher current u p t a k e is o f t e n the sign of non-functioning DC/DC converter.

At the second test point, a periodical signal should present; the a m p l i t u d e depends on the type of the converter. The third test point is the DC o u t p u t of the converter.

be In most instruments, voltage muliplier circuits are used. If there is no DC o u t p u t on the last stage of the multiplier, it is worthwhile to test the o t h e r stages, because often only the last diode fails.

Typical DC/DC converter o u t p u t voltages are the following: - ionization chambers

200 -

- Geiger-Mueller tubes

350 - 1200 volts

- s c i n t i l l a t i o n detectors

600 - 1000 volts

- semiconductor detectors

60 -

When the internal resistance of

600 volts

400 volts the converters is

100 kOhm - 1 MOhm range, the readings on a low internal in the impedance v o l t m e t e r will be correspondingly lower, so care should be taken in their evaluation.

On the fourth test p o i n t , a DC level change is expected if the intensity of the r a d i a t i o n changes. In all other systems pulses should be present on this output if the d e t e c t o r and the first stage operates in response to the radiation. The signals from a Geiger-Mueller tube are many microseconds long, while the s c i n t i l l a t o r signals are only some microseconds in width. volts.

The

If meter, a amplitudes range from a few tens of millivolts to the fifth test point is the output of a

DC level change response should be the counting when rate the r a d i o a c t i v e source to detector distance is changed. The deflection of the moving-coil meter should change in the same way. If a d i g i t a l display is used in the survey meter, the checking should follow the instructions given in the sealer section of this manual .

11.1.4.8

Diagnostic tests in the M.I.P. 10 polyradiamet re

The M.I.P. 10 is a p o r t a b l e , battery- or mains-operated survey m e t e r , e q u i p p e d with various types of nuclear radiation d e t e c t o r s . It can be used as a dose-rate monitor, if calibrated.

(250)

Page 235

-11(i)

Chapter 11

Controls and display

The picture of the front panel is shown in Fig. 11.8. A main switch, battery test, loud speaker on-off, and four counting rate-raeter range selector push b u t t o n s , form the controls of the instrument. The moving coil type display has two scales: one for the b a t t e r y c o n d i t i o n indication and the other for the CRM readout.

Fig. 11.8: Front panel of a t y p i c a l survey meter (ii)

Connections

The d e t e c t o r socket is on the front panel; line voltage, recorder and sealer o u t p u t s are on the rear side with the mains f use .

(iii)

Battery operation

Eight 1.5 volt batteries can be loaded into the b a t t e r y compartment. In an optional variant, a rechargeable Ni-Cd supply is available w i t h a drip charging feature. The wiring diagrams of the two variants are shown in Fig. 11.9. The first key test point is the battery v o l t a g e between pin 1 and 11. This can be tested with the built-in TEST p u s h - b u t t o n . If new batteries were put into the instrument and the TEST gives no indication to the moving-coil m e t e r , the Sie switch has to be tested for continuity. Sometimes corroded b a t t e r y compartment contacts create problems; they must be cleaned or replaced as needed. By regular bi-monthly b a t t e r y c o m p a r t m e n t check-ups, such failures could be eliminated. In case of the Ni-Cd battery option, one might expect to find an indication on the display if the batteries are already charged, After a long unused period they might be discharged. If the DS1 LED lights up after the mains is connected, it proves that the cord, connector, fuse and the transformer are fune t ioning.

(251)

Page 236

n s» y

6) ~O rt n l-l IM«

IM

«•

II

T»r H, mvtf

OfTUM iUUHUUTCUlS C>-M it CHUtCCUI

NJ l

Fig.

11.9:

W i r i n g d i a g r a m of a survey meter

Page 237

-13-

Chapter 11

If the fuse is blown o u t , one should suspect f i r s t the Ni-Cd batteries for short c i r c u i t and the CR201 r e c t i f i e r . The test should be repeated w i t h the 14-pin socket d e t a c h e d if they prove to be good, because t h e n the short circuit is f u r t h e r away from the battery. It is good to know that the Ni-Cd accumulators have a limited life, which might be reduced by n e g l e c t i n g the periodical chargings. A Ni-Cd cell s t i l l working after four years is of an exceptional, non-standard quality. (iv)

The first DC/DC converter

The v o l t a g e from the b a t t e r i e s or from the a c c u m u l a t o r changes d u r i n g use. To overcome t h i s , a regulated power supply feeds the c i r c u i t s w i t h +/- 12 volts. A self-star t ing power oscillator (Q101, Q102) drives the T101 transformer. If the e m i t t e r current of these t r a n s i s t o r s exceeds a c e r t a i n l i m i t , the Q105 transistor pulls to ground the base of the series control power t r a n s i s t o r (Q1U3). The central tap of the t r a n s f o r m e r is c o n n e c t e d to the e m i t t e r of Q103 while its c o l l e c t o r is on the p o s i t i v e pole of the b a t t e r y . The base p o t e n t i a l of t h i s emi11 er -föl1 owe r is driven by Q104. The base of Q104 is connected to the r e c t i f i e d o u t p u t signal of the transformer t h r o u g h the R 1 3 1 p o t e n t i o m e t e r and the r e f e r e n c e d i o d e CR103 to form an a d j u s t a b l e , feedback-controlled, regulated voltage circuit. If the o u t p u t voltage is not +/- 12 v o l t s , the f a u l t it should be d e t e r m i n e d and e l i m i n a t e d .

causing

Let us suppose t h a t the s y m p t o m is no v o l t a g e on the +/12 v o l t s rail. F i r s t the d e t e c t o r should be d e t a c h e d from the c e n t r a l unit. If the v o l t a g e appears, then the p r o b l e m is in the removed section. If the v o l t a g e does not a p p e a r , a quick way to l o c a t e the fault could be done by separating the central tap of the t r a n s f o r m e r from the e m i t t e r of Q103, and w i t h an o h m - m e t e r check for s h o r t e d co1lee t or-emi11er c o n d i t i o n in Q101 and Q102. If t h e r e is no short c i r c u i t one should apply 4 to 8 v o l t s through a fused ammeter for a s h o r t time. If the o s c i l l a t o r s t a r t s o p e r a t i o n and the c u r r e n t is less than 50 mA, a volt m e t e r should be a t t a c h e d to the collector of Q104. This point should be near to b a t t e r y v o l t a g e if the R 1 3 1 p o t e n t i o m e t e r is grounding its base and it should start c o n d u c t i n g if the p o t e n t i o m e t e r is put into the other end p o s i t i o n . If no change could be o b s e r v e d , all components should be c h e c k e d one by one and the bad ones must be r e p l a c e d . It might h a p p e n t h a t the o s c i l l a t o r will, not start because e i t h e r CR104 or CR105 has a short c i r c u i t ; this could be checked by d i s c o n n e c t i n g t h e m from the circuit. Another reason could be a short c i r c u i t in the transformer. This can be checked for with the previously described "blocking oscillator" t e s t .

(253)

Page 238

C h a p t e r 11 Q103

-14can be replaced with two transistors in

Darlington connection.

(v)

The Geiger-Mue11er probe

The circuit diagram is illustrated in F i g . 11.10. The d e t e c t o r v o l t a g e is d e v e l o p e d in the DC/DC converter on the left. A blocking oscillator composed of Q105 and Q106 generates the d e t e c t o r v o l t a g e , which is d o u b l e d w i t h the use of CR105 and CR106 and the c a p a c i t o r C103. The high v o l t a g e is f i l t e r e d by C104 and C105. A f r a c t i o n of the h i g h - v o l t a g e is fed back to the Q 1 0 1 , Q102 composed d i f f e r e n t i a l a m p l i f i e r . There are two non-common circuit elements: the CR101 and the CR103; they are current sources composed of two transistors in D a r l i n g t o n connection. A f t e r Q103, emitter follower o u t p u t of the long-tailed pair is further a m p l i f i e d by Q104.

If there is no detector v o l t a g e , f i r s t the blocking o s c i l l a t o r should be t e s t e d for operation. If the base of Q102 is driven from outside with a variable voltage from a helical p o t e n t i o m e t e r s w i p e r , the operation of the a m p l i f i e r stages could be easily checked.

The secondary winding of such transformers is rather vulnerable if it is exposed to humid c l i m a t e . They often develop short c i r c u i t s within the secondary. Local repair is possible if p r o p e r interlayer i n s u l a t i o n could be secured combined w i t h v a c u u m imprégna t ion. If R 1 1 0 , the 22 MOhm value feedback resistor, fails to c o n d u c t , a d a n g e r o u s s i t u a t i o n m i g h t develop. The missing feedback voltage forces the c i r c u i t to increase the o u t p u t , so a higher than normal voltage will soon be established on C105 and the Geiger-iMueller tube will "behave" accordingly. The reverse leakage current of the CR106 can be 30-100 mA only, so a dangerous charge m i g h t remain on the C105 capacitor for a long time after the instrument was switched o f f ; the 0.01 J energy kick can hurt. Care should be taken to check the presence and good condition of the feedback resistor before starting the repairs. The Geiger-MueHer tube is in the center; on its right side a pulse shaping c i r c u i t can be found. If the Geiger-Mueller tube is t r i g g e r e d , a positive pulse will appear on R204, limited to b a t t e r y voltage amplitude by CR201 clamping diode. The pulse is d i f f e r e n t i a t e d by C201-R204 before it enters Z201, a monostable m u l t i v i b r a t o r , generating e q u a l a m p l i t u d e and length pulses. A f t e r f u r t h e r a m p l i f i c a t i o n in Q202, the signal leaves the sonde through e m i t t e r follower Q201.

The connecting cable is rather critical in portable instruments. It should be checked thoroughly for continuity and wear. It is b e t t e r to replace the worn cable before a fault develops.

(254)

Page 239 read from a scan by OCR; it may hold reading errors

(255)

Fig.

ll

10

Circuit diagram of a G.-M.

probe

Carte Convertisseur

Carte Régulation

4301 a {R201 C202 |G 70pF

CROs af.

2NS447

Prayer ome Cw ODA > bh K)

awe 381 120k e

CJ oe ~ co wl} a] me}

B2XLECSVI cn, uF

LH sun 2201 7 R202 C201 COSOKIAE R206

' ¢ KA vipk 2,79 BR | wet rma §

C93 1 ont “T°

CRS

+5

Jt f i Tan -_ R209 ; o wong sean |2zma | ZF 02X7903V6 tag rie

EN

Valable & partir du numéro 18

FICHE

Vue exterieure

-15-

Chapter ll

Page 240

C h a p t e r 11

-16-

The Geiger-Mue11er tube signals should never be checked on the t u b e itself because the c a p a c i t i v e load of the test probe increases the peak c u r r e n t and reduces the e x p e c t e d l i f e span of the tube. A suitable point is on C201. If the tube is not functioning, the sonde can be t e s t e d f u r t h e r w i t h a pulse g e n e r a t o r from C201.

(v i)

The s c i n t i l l a t i o n d e t e c t o r p r o b e

The circuit diagram of this probe is illustrated in Fig. 1 1 . 1 1 . The h i g h v o l t a g e DC/DC c o n v e r t e r is on the u p p e r half of the d r a w i n g . An audio frequency oscillator c o m p o s e d of three NOR c i r c u i t s drives the base of Q102. The step-up t r a n s f o r m e r Tl is in the c o l l e c t o r c i r c u i t of Q102, w h i c h is fed by the e m i t t e r follower Q101. On the secondary side of the step-up transformer a ten-stage voltage m u l t i p l i e r operates d e l i v e r i n g a p p r o x i m a t e l y + 1000 v o l t s , if 10 v o l t s are present on the base of the Q101 e m i t t e r follower. The feedback loop is closed t h r o u g h the 100 MOhm value R201 resistor d r i v i n g the inverting input of the Z201 o p e r a t i o n a l a m p l i f i e r , which is c o n n e c t e d to the base of the Q101 e m i t t e r foilower .

Dangerously high v o l t a g e can develop in the circuit if the 100 MOhm R201 resistor is broken. It is easy to test the circuit by b r e a k i n g the B - B c o n n e c t i n g line and i n t r o d u c i n g a v a r i a b l e DC voltage to R108. This way the o s c i l l a t o r and the power-stage and the v o l t a g e m u l t i p l i e r can be t e s t e d s e p a r a t e l y .

The o p e r a t i o n a l a m p l i f i e r can be tested if the feedback loop is opened at A - A and a v a r i a b l e DC v o l t a g e is injected to the j u n c t i o n of R202 and R206 t h r o u g h a 100 kOhm resistor. If the voltage input is c h a n g e d , the o u t p u t should s u d d e n l y change in the r e v e r s e d i r e c t i o n when the o p e r a t i o n a l a m p l i f i e r is good.

The output signal from the p h o t o - m u l t i p l i e r is fed through junction G to the a m p l i f i e r section consisting of a b u f f e r 1C (Z203), a level d i s c r i m i n a t o r 1C (Z202), and the o u t p u t amplifier composed of Q201 at TP1 on the e m i t t e r of Q204 . By the a d j u s t m e n t of the potentiometer

R215, the t r i g g e r i n g level could be set.

Testing of the s c i n t i l l a t i o n d e t e c t o r is done w i t h a small 15 - 150 kBq a c t i v i t y r a d i o a c t i v e source, p r e f e r a b l y a Cs-137 one. If the d e t e c t o r o p e r a t e s , a few m i c r o s e c o n d s long, a few hundred m i l l i v o l t and p o s i t i v e a m p l i t u d e signals should be observable on TP1 while the source is a few c e n t i m e t e r s from the d e t e c t o r and the d e t e c t o r v o l t a g e , e t c . is on.

(256)