Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeContact

The text of a manual · part 4 of 14

Series One/Series Three Data Communications User's Manual: Chapter 3 Installation and Operation of the Data Communications Module for the Series Three PC

Pages 30 to 41 of 134, from Series One/Series Three Data Communications User's Manual

The original document is the PDF (14 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

Filed in the catalog under the GE Fanuc IC630MDL357A, Fanuc IC630MDL357A and GE IC630MDL357A

Page 30

GEK-90477

Installation

INSTALLATION and Operation of the DCM

3-1

This chapter describes the operation of the DCM’s user interfaces (LEDs, switches, ports) and the installation of the Data Communications Module (DCMI (IC630CCM300).

DESCRIPTION

AND OPERATION

The various indicator shown in Figure 3.1.

lights, connectors, and configuration

DIP switches mn 0 MO -0 a

:n (n

CPU

I

0 l

‘. :* . l. :* . l. :* .

3 .:* :* .3 :* . :a. :*

0 l

4

\

.couu ,

0+ l l

0 4 c

, q -a-

Figure

3.1 and

OF THE DCM’S USER INTERFACES for the DCM are

TPK.A.40007

*

*

CHAPTER 3 AND OPERATION OF THE DATA COMMUNICATIONS MODULE c1 FOR THE SERIES THREE PC

FRONT

AND REAR VIEW OF THE DCM

Page 31

GEK-90477

Installation and Operation

3-2 of the DCM

LED INDICATORS The three status LED’s on the front of the DCM convey the following infor”mation:

Status LED

State

Description

DATA

On

Data being transferred to/from the communication port.

Off

Data not being transferred to/from the communication port or data incorrect due to: 1

0

20 30 DIAG

PWR

Parity overrun or framing errors; Invalid header, data block, control character, or checksum; Time out on serial sink.

On

Power-up hardware diagnostics have passed.

Off

Power-up hardware diagnostics have failed.

On

5 V dc power to DCM is connected.

Off

5 V dc power to DCM is not connected.

NOTE Power to the DCM can come from the Series Three CPU or external supply depending on position of power select switch. When the power supply select switch is in the EXT position, power must be supplied through the external power supply connector on the front of the DCM. See Figure 3.1.

Page 32

GEK-90477

FRONT installation and Operation

3-3 of the DCM

PANEL CONNECTORS a-

Three connectors 1. 2. 3.

on the front of the DCM provide

Series Three CPU (CPU Connector); External serial device (Communications External power supply.

Each of these interfaces are described an interface to:

Connector);

and below.

Series Three CPU Connector The CPU connector (25pin male, D-type) ties the DCM to the Series Three CPU. All communication with the Series Three, as well as operating power (if the power supply The cable select switch is set to internal) is transmitted through this interface. (lC630CBL395A) is provided with each DCM for the link.

Communications

Connector

The communications devices. A detailed

External connector description

(25pin female, D-type) connects the DCM to external (pin by pin) of this connector is shown in Chapter 4.

Power Supply Connector

The external power supply connector allows the DCM to receive its operating power (5 V Users with Series Three power supply dc at 0.5 A) from an external supply. lC630PWR3OOA require an external power supply to operate a DCM. Other Series Three power supplies may or may not necessitate the use of an external power supply for proper operation of the DCM. This is dependent on the number and type of I/O modules in the CPU rack. Refer to Tables 3.2 and 3.3. A three conductor cable is provided with the DCM for external power supply connection. Its color code is as follows: WHITE: BLACK: GREEN:

+5V DC (+ 5%) at 0.5 amps Logic gr&nd of power supply Power system ground.

Page 33

GEK-90477

Installation

DCM CONFIGURATION and Operation of the DCM

3-4

SWITCHES

The ON/OFF line switch is located on the front of the DCM. switches are located on the back of the DCM as shown below.

The othk configuration

TPK.A.40226

. .

I

-ON L t

I

PWR EXT

I

IN1

LL

Figure

ON/OFF-LINE

3.2

LOCATION

OF THE DCM CONFIGURATION switch which communications is recessed on the front panel with the Series Three CPU.

Switch

The ON/OFF-line disables the serial

OFF LINE: Serial communication CPU is under control ON LINE:

SWITCHES between the DCM of the programmer.

Serial communication between programmer is not functional.

the DCM of the

DCM enables or the and CPU is disabled, and and is enabled, and the

CPU

Page 34

GEK-90477

Installation and Operation of the DCM

3-5

NOTE The terminal LED indicator on the face identifies the status of the serial link between Terminal Terminal

Interaction

LED ON: LED OFF:

between the DCM ON/OFF-LINE

DCWCPU DCM/CPU of the Series Three the DCM and CPU. interface interface enabled. disabled.

switch and the CPU Keyswitch

In order to establish or maintain the serial link between the DCM and the Series Three CPU, the CPU keyswitch must be in the Run 1 or Run position, and the DCM ON/OFF-LINE switch in the ON-LINE position. If the CPU keyswitch is ever taken out of the Run l/Run position when the serial link is enabled, the link will become disabled and the TERMINAL LED will turn off. To re-enable 1. 2.

communications:

Put the CPU keyswitch back in Run 1 or Run position, Cycle the ON/OFF-LINE switch on the DCM with the final LINE.

position

NOTE Once the link is established and the TERMINAL LED is on, the Series Three CPU can be put in either Stop/Program or Run mode* by a serial request from the master device on the link. See the application examples in Chapter 5.

being

ON

Page 35

GEK-90477

Installation and Operation of the DCM

3-6

CPU (Unit) ID DIP Switches The top group of eight DIP switches located on the back of the DCM (see Figure 3.2), determine the CPU ID of l-90. The switch configuration associated with each ID is shown in Figure 3.3. TPK.A.40223

\

EXAMPLE OF UNIT 10 SWITCH SETTlNGS. EXAUPLE SWlTCH IS SET Fm UNIT ADDRESS9.

L la0

1 I L r I I

Jcr> m

Iw

. /

Jo

NOT USE0

%E;

]b

)m

WO-

, 1

UNIT ID

2 3 4 5 6 07

DIP WITCH POSITION ~8 7 6.514 3'2.1, I 1,X X xx Xl x x xx 1 Ix ~X,X x

9 10

. I

1 , , , , , ,

, , , , , / , , , ) , , , , , , , , , , 1

20

21 22 23 24 25 26 lx x x x x x 1 .x xxx1 ~ xx I .X.X ,x. , I .x.x. x

I!

14

15 16 17 18 19

Ix1 x,

X

AX

Xx

51 52 53 54 55 56 57

1

58

27

1

1

XX

28

I

I

JX

29 30

I.1 XXX Ix 59 1 - 1 _X_X.X_Xi _ 60

X

Figure

31 32 33 34 35 36 37 38

39 40 _ XI x xl 41 xx 42 I 1 lx x. ,x 43 I x xix1 , 44 x xix x 45 . X.11.. . 46 x 47 X x X 48 .X. x x, 49 50

11 12 13 x x.

UNIT ID

3.3

= Switch x in the

DIP WITCH UUIT POSITION ID 81716 51413 211 1 X'XlX X!XI 61 Ix I 62 63 IX 64 i IX ,X Xf x '. XX 65 x x ~66 Xt, , Xt, T !X 67 .x xx 68 X XXX 69 ,x xl 70 x xi x 71 . ,x .x1 ,x 72 1 1 .. x ,xl Ix x, 73 T x XI 74 X Ix, x x x 75 . IX XXX 76 x x x x, 77 OX ,xx, 1 78 , 1 /x,x 1 .x1 79 Ix x Ix i 80 /XX 1Xx1 81 1 Ix x, x I 82 IX X X -Xi 83 lxx xx 84 1 I Ix x OX x,x 85 xxx 86 x x.x X 87 I x x,x, Ix 08 X XIX! X X 89 _ . .X.X1X1X. 1 L 90

, SWITCH POSITION 18 7 615]413!2!1 xlxlx_xl Ix 1 xixlx xlxi , 1 I [l X x!x!x,xix]x 1 Xl IX X. xlI 1 1 , X .~ Xix 1 X XI ! , X XI x, Xl ~XIX ( X x1x1x X~ Xi 1 [ ~ _. .x xl I Ix X X~ ix1 ( X x ix/x x, ixlxl I . r x11 x Xl ;x xl x xix; ( XT rx xlxix (, xl x I xi .x . x. ,xl x x, 1 x Ix xx+ X iX X .x lx x X< OX Ix xx. x Ix X,XiX ,, , X .XX f .X' x x, x., i .X X./x] I(, ( DIP

OU position

DIP-SWITCH

SETTINGS

FOR CPU ID SELECTION i

Page 36

GEK-90477

Installation

Communication and Operation

Port Configuration of the DCM

3-7

DIP Switches

The bottom group of eight DIP switches on the back of the DCM selects the mode of operation for the communication port (refer to Figure 3.2 for location of switches). The various settings for the communication set up parameters are shown in Table 3.1. To execute the loop-back test the ON/OFF-LINE switch must in the Off-Line mode.

Table 3.1

COMMUNICATIONS

PORT CONFIGURATION

DATA RATE SELECTION (BPS)

DIP-SWITCH

1200 9600 19.2 k

DIP-SWITCH NUMBER 1 2 OFF OFF ON OFF OFF ON ON ON

PARITY SELECTION

DIP-SWITCH NUMBER

*300

SETTINGS

3

Parity ENABLED (Odd parity generated and checked). *Parity DISABLED (No parity is generated or checked).

ON OFF l

LOOP-BACK TEST (Special Connector Required) Enabled *Disabled

DIP-SWITCH NUMBER 4 ON OFF

TURN-AROUND DELAY

DIP-SWITCH NUMBER 5 OFF ON

* 0 ms delay 10 ms delay

KEYING SIGNAL Enabled *Disabled

*Factory set default posit ion.

DIP-SWITCH NUMBER 6 ON OFF

.

Page 37

GEK-90477

Installation and Operation of the DCM

3-8

POWER SUPPLY SELECT SWITCH There is a power internal (CPU) or switch orientation in this chapter for supply select switch on the back of the module for fhe selection of external power for the DCM. An adjacent label indicates correct for each selection. See the section, External Power Supply Connector, information on the installation of an external power supply.

USING THE DCM WITH CPU RACK

POWER

Users with Series Three power supply IC630PWR300A require an external 5 V dc power supply to operate the DCM. If power supply IC630PWR300A is used with the DCM, inconsistent CPU or communications operation will result.

NOTE Even if a high-capacity power supply is being used in the CPU rack, inconsistent CPU or communications operation may be observed depending on the number and unit load of I/O modules installed in the rack. Refer to Tables 3.2 and 3.3 for units of load supplied by the different racks and used by I/O modules and other system devices.

Table 3.2

CATALOG NUMBER

IC63OPWR30OA IC63OPWR31OA IC63OPWR314A IC630PWR320A IC63OPWR324A

* 1 unit = 10 mA.

SERIES THREE

UNITS*

DESCRIPTION

P.S.

115/230 115/230

Vat Vat

Hi Cap. Hi Cap. Hi Cap.

P.S. P.S. P.S.

24 Vdc Remote Remote

I/O I/O

P.S.

(SUPPLIED)

i

POWER SUPPLIED IN UNITS OF LOAD

Hi Cap.

Standard

OF LOAD

115/230Vac 24 Vdc

+5v

+12v

250 300 300 300 300

100 200 200 200 200 b

Page 38

GEK-90477

Installation and Operation

Table 3.3 SERIES THREE

ZATALOG NUMBER

DESCRIPTION (CIRCUITS)

3-9 of the DCM

UNITS*

OF LOAD (USED)

POWER USED IN UNITS OF LOAD +12 v +5 V

IC630CPU301A IC630MDL301A IC630MDL302A IC630MDL303A IC630MDL304A IC630MDL306A IC630MDL310A IC630MDL311A IC630MDL316B IC630MDL324A IC630MDL325A IC630MDL326A IC630MDL327A IC630MDL351A IC630MDL352A IC63OMDL353A IC63OMDL354A IC630MDL356A IC630MDL357A IC630MDL366A IC630MDL367A IC630MDL368A IC630MDL375B IC630MDL376B IC630MDL380A IC630CCM300A IC63OCCM3lOA IC630CCM311A IC630PER320A IC630PER321A IC630PER330A IC63OPER331A

CPU/Programmer Unit Inp 24 V dc sink (16) Inp 24 V dc sink (32) Inp 5-12 V dc sink (32) I/O 24 V dc sink (16/16) Inp 24 V dc sink w LEDs (32) Hi Speed Counter (1) Inp 24 V ac/dc src (16) Analog Inp 1-5, l-10 V dc (2) I/O Simulator (16) Inp 115 V ac (16) Inp 115 V ac isolated (8) Inp 230 V ac (16) Out 24 V dc sink (8) Out 24 V dc sink (16) Out 24 V dc sink (32) Out 5-12 V dc sink (32) Out 24 V dc sink w LEDs (32) Out 24 V dc src (16) Analog Out l-5 V dc, 4-20 mA (2) Analog Out -10 to +lO V dc (2) Analog Out O-10 V dc, 4-20 mA (2) Out 115 V ac (16) Out 115 V ac isolated (8) Out Relay 5-265 ac/dc (16) Data Comms Module I/O Link Local I/O Link Remote I/O Link Local F'brOpt P-P I/O Link Remote Fbr Opt P-P I/O Link Local F'brOpt M-P I/O Link Remote F%r Opt M-P

* 1 unit

Calculations

= 10 mA.

are based on the worst case--all

150 11 5 5 9 8 20 9 30 11 17 6 9 2 4 10 16 10 2 33 33 33 4 4 4 50 80 80 80 80 80 80 inputs

-

10 18 39 30 39 64 l

-

- and outputs on

Page 39

GEK-90477

Installation

INSTALLING

THE DCM

To install 1. 2. 3. 4.

and Operation of the DCM

3-10 the DCM: Set the internal/external power switch to the desired position. Position the unit address (ID) and port configuration DIP switches to the desired position (see Figure 3.3 and Table 3.1). Mount the DCM in the Series Three rack or outside the rack within about 5 feet of the CPU. With the Series Three power off, connect the DCM to the CPU using cable IC630CBL395A as shown in Figure 3.4.

If, before powering up, the DCM ON-LINE/OFF-LINE switch is placed in the ON-LINE position and the Series Three CPU switch is in the RUN position, after power up the PWR and DIAG indicators on the DCM should light in that order. In addition, the RUN and For more information on power-up TERMINAL indicators on the CPU should light. conditions affecting the CPU and communications status see Table 3.4. TPK.A.40458

Figure

3.4

CONNECTING

THE DCM TO THE CPU

Page 40

GEK-90477

Installation

POWER CYCLE and Operation

CONDITIONS

3-11 of the DCM

AFFECTING

SYSTEM OPERATION

When the power is cycled, the resulting CPU and communications status position of the DCM ON-LINE/OFF-LINE switch as shown in Table 3.4.

Table 3.4 a depends upon the

POWER CYCLE CONDITIONS AFFECTING SYSTEM OPERATION (The user program is assumed to be in CMOS RAM).

DCM

CPU KEY-SWITCH

RESULTING CPU AND C.OMMUNICATIONS STATUS ON POWER CYCLE

On-Line

Run

CPU in Run mode with TERMINAL mode indicator ON.

Off-Line

Run

CPU in Run mode with TERMINAL mode indicator OFF. \

Page 41

This page is a scan with no text; see it in the PDF.