Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeContact
Page 1 of Series 90 PLC Serial Communications User's Manual, Chapter 2: The Communications Coprocessor Modules

Spec sheet · GE Fanuc

Series 90 PLC Serial Communications User's Manual, Chapter 2: The Communications Coprocessor Modules

Spec sheet15 pagesPDF 211 KB

Manual chapter on the GE Fanuc Series 90 Communications Coprocessor Modules (IC693CMM311 and IC697CMM711): hardware, installation and setup.

What this file really is

The old site listed this file as a spec sheet for the GE Fanuc IC693CPU311X. Filed as a specsheet for the IC693CPU311X, this is the chapter on the CMM311 and CMM711 Communications Coprocessor Modules from the Series 90 PLC Serial Communications User's Manual.

Download the PDF211 KB

Filed with · 1 model

Also filed with these models on the old site

Summary

What is in it

Chapter 2 of the GE Fanuc Series 90 PLC Serial Communications User's Manual, covering the Communications Coprocessor Modules: the CMM311 for the Series 90-30 PLC and the CMM711 for the Series 90-70 PLC. It describes the LED indicators, restart pushbutton, serial port pin assignments, the IC693CBL305 Wye cable, installing the module in the rack, troubleshooting, and configuring the CCM, RTU and SNP protocol modes and their communication parameters.

Its parts

  1. Section 1: Description of CMM Hardware and Operation
  2. Section 2: Installing and Configuring the CMM

From the sheet · read page by page

Key facts from this sheet

Each line names its page in the PDF.

This is Chapter 2 of the GE Fanuc Series 90 PLC Serial Communications User's Manual (GFK-0582D). It covers the CMM311 and CMM711 Communications Coprocessor Modules, not the CPU311 the site files it under. It explains the LEDs, serial port wiring, installation, troubleshooting and protocol settings of these modules.

What it is
Communications coprocessor module that adds two serial ports to a Series 90 PLC p. 1
Modules covered
IC693CMM311 for Series 90-30; IC697CMM711 for Series 90-70 p. 7
Required CPU
Series 90-30: CPU331 or higher p. 7
CMM311 serial ports
Two ports on one connector; port 1 RS-232 only, port 2 RS-232 or RS-485 p. 5
CMM711 serial ports
Two connectors, each port RS-232 or RS-485 p. 4
RS-422 devices
Connect in RS-485 mode p. 5
Wye cable
IC693CBL305, 1 foot, supplied with each Series 90-30 CMM; splits the connector into PORT 1 and PORT 2 p. 5
Protocols
CCM, RTU, SNP and SNP-X, set per port in nine configuration modes p. 10, 11
Factory default
CCM protocol on both ports p. 11
Modules per system
Up to 4 in a Series 90-30 main rack; up to 28 in a Series 90-70 system p. 1
Series 90-30 slot
CPU baseplate only, any slot except slot 1 p. 10
LEDs
MODULE OK, plus US1 and US2 port activity on the CMM311 (PORT1 and PORT2 on the CMM711) p. 3
Programming cables
IC690CBL702 (9-pin AT) or IC690CBL705 (25-pin PS-2), for running the software through the CMM in SNP mode p. 9
Software
Logicmaster 90 or windows-based programming software p. 7

What this sheet walks you through

  • Reading the MODULE OK and port LEDs p. 3
  • Wiring the serial port pins of each module p. 4, 5
  • Connecting the IC693CBL305 Wye cable p. 5, 6
  • Placing the module in a rack or baseplate p. 8, 10
  • Installing the module step by step p. 9
  • Troubleshooting a MODULE OK LED that is not on p. 9
  • Choosing a protocol for each port p. 10, 11
  • Setting CCM, RTU and SNP communication parameters p. 12, 13, 14
  • SNP timer values for each timeout setting p. 15

Good to know

  • When the MODULE OK LED is off, the Restart/Reset button does nothing; power to the whole PLC must be cycled. p. 4
  • Hardware flow control is not supported on an RS-485 interface. p. 13
  • Without the Wye cable, connecting an RS-232 device to port 2 needs a special cable. p. 5
  • After changing the SNP ID, the module must be reset with its Restart button or by cycling rack power. p. 11
  • Set the PLC CPU to STOP and power down the system before installing the module. p. 9

Questions this sheet answers

Which Series 90-30 CPU does the CMM311 need?

The manual states the Series 90-30 CPU must be a CPU331 or higher. p. 7

What cable comes with the IC693CMM311?

The IC693CBL305 Wye cable, 1 foot long, which splits the single connector into PORT 1 and PORT 2. p. 5

What protocol does the CMM use out of the box?

CCM protocol on both ports. p. 11

What does it mean when the CMM MODULE OK LED is off?

The module is not working because of a hardware malfunction, a failed diagnostic, or a missing PLC; corrective action is needed. p. 3

How many CMM modules fit in a Series 90-30 PLC?

Up to 4, in the main rack (baseplate). p. 1

The whole text · 2 parts

Read the sheet here as text

Its text as extracted from the PDF, unedited, in parts; each page opens the PDF at that page.

  1. Pages 1 to 81-8
  2. Pages 9 to 159-15

The file

Revision and size

Part no.GFK-0582D
RevisionNovember 2000
PublisherGE Fanuc
Pages15
PDF211 KB
TextText from the PDF itself.
GFK-0582D

The first pages · 4 of 15

Look before you download

Each page opens the PDF at that page.

Page 1
Page 1of 15
Page 2
Page 2of 15
Page 3
Page 3of 15
Page 4
Page 4of 15

More documents · 1

For the same models