Page 51

2−4

Logic Connector Introduction and installation

Inverter Mountingand installation Inverter Mounting

After removing the front housing cover, take a moment to become familiar with the connectors, as shown below.

Serial communication port

Danger! Do not touch!

Logic and analog signal connections Relay output contacts

HIGH VOLTAGE: Hazard of electrical shock. Never touch the exposed PCB conductors while the unit is powered up. Also, the inverter must be powered OFF before you change any of the DIP switch settings.

Page 52

2−5

DIP Switch Introduction The inverter has internal DIP switches, located near the middle of the logic connectors as shown below. This section provides an introduction. Refer to later chapters that discuss the DIP switch operation in more detail.

SW7 SW8 ON OPE OFF

SW7 485

OPE

SW8 ON

OFF

The 485/OPE (RS485/Operator) DIP switch configures the inverter’s RJ45 serial port. You can use either the inverter’s integrated keypad or the OPE-SRmini connected via a cable to the serial port. In this case, SW7 should be set OPE (default setting). The port is configured for RS422 in this setting. Inverter control via a ModBus network communication requires the “485” setting. See “Connecting the Inverter to ModBus” on page B-3 for more details.

DIP switch SW8 controls the Emergency stop signal input. Turning this DIP switch ON will enable the inverter to receive a Emergency stop signal from the dedicated safe stop terminal (#3). The inverter will shut off its output by means of direct hardware control (bypassing the internal microprocessor normal program execution) when a signal is given to this terminal. Additionally, the intelligent input terminal assignment will be changed automatically when SW8 is ON. See “Safe Stop” on page 4-32 for more details.

InverterInverter Mounting Mountingand and installation installation

485

Page 53

and installation

Power Wiring Access – First, ensure no power source is connected to the inverter. If power has been connected, verify that the Power LED is OFF and then wait five minutes after power down to proceed. After removing the front housing cover, the two housing partitions that cover the power and motor wiring exits will be able to slide upward as shown to the right. The upper cover is for main power input wiring, and the lower one is for the motor output wiring.

Inverter Mounting and installation

Inverter Mountingand installation Inverter Mounting

2−6

Notice the four wire exit slots in the housing partition. This helps keep the power and motor wiring (to the left) separated from the signal-level logic or analog wiring (to the right). Remove the housing partitions and as shown as set them aside in a secure place while wiring. Be sure to replace them afterward. Never operate the inverter with the partition removed or the front housing cover removed.

Power input terminals

The power input mains connect to the terminals at the top of the inverter, and the motor 3-phase leads connect to the lower row of the terminals at the bottom of the inverter. The upper row of the bottom terminals connect to optional braking units or DC link choke. The following section in this chapter will describe system design and guide you through a step-by-step installation process. After the section on wiring, this chapter will show how to use the front panel keys to access functions and edit parameters. Motor connecting terminals and terminals for other options (DC link choke, Braking unit)

Page 54

2−7

Basic System Description A motor control system will obviously include a motor and inverter, as well as a circuit breaker or fuses for safety. If you are connecting a motor to the inverter on a test bench just to get started, that’s all you may need for now. But a system can also have a variety of additional components. Some can be for noise suppression, while others may enhance the inverter’s braking performance. The figure and table below show a system with all the optional components you might need in your finished application.

Name Breaker / disconnect

Breaker, MCCB or GFI

Input-side AC Reactor

Radio noise filter

EMI filter (for CE applications, see Appendix D)

L1

L2

L3 +1

Inverter + GND T1

T2

Radio noise filter (use in non-CE applications) DC link choke

T3 Radio noise filter

Output-side AC Reactor

Motor LCR filter

Function A molded-case circuit breaker (MCCB), ground fault interrupter (GFI), or a fused disconnect device. NOTE: The installer must refer to the NEC and local codes to ensure safety and compliance. This is useful in suppressing harmonics induced on the power supply lines and for improving the power factor. WARNING: Some applications must use an input-side AC Reactor to prevent inverter damage. See Warning on next page. Electrical noise interference may occur on nearby equipment such as a radio receiver. This magnetic choke filter helps reduce radiated noise (can also be used on output). Reduces the conducted noise on the power supply wiring between the inverter and the power distribution system. Connect to the inverter primary (input) side. EU version (with a suffix of -FEF have integrated EMC Filter, which is category C1 for 200V class and C2 for 400V class.) This capacitive filter reduces radiated noise from the main power wires in the inverter input side. Suppress harmonics generated by the inverter. However, it will not protect the input diode bridge rectifier. Electrical noise interference may occur on nearby equipment such as a radio receiver. This magnetic choke filter helps reduce radiated noise (can also be used on input). This reactor reduces the vibration in the motor caused by the inverter’s switching waveforms, by smoothing the waveform to approximate commercial power quality. It is also useful to reduce harmonics when wiring from the inverter to the motor is more than 10m in length. Sine wave shaping filter for output side.

Thermal switch

NOTE: Note that some components are required for regulatory agency compliance (see Chapter 5 and Appendix D).

InverterInverter Mounting Mountingand and installation installation

From power supply

Page 55

WARNING: In the cases below involving a general-purpose inverter, a large peak current can flow on the power supply side, sometimes destroying the converter module: 1. The unbalance factor of the power supply is 3% or higher. 2. The power supply capacity is at least 10 times greater than the inverter capacity (or the power supply capacity is 500kVA or more). 3. Abrupt power supply changes are expected, due to conditions such as: a. Several inverters are interconnected with a short bus. b. A thyristor converter and an inverter are interconnected with a short bus. c. An installed phase advance capacitor opens and closes. and installation

Inverter Mountingand installation Inverter Mounting

2−8

Where these conditions exist or when the connected equipment must be highly reliable, you MUST install an input-side AC reactor of 3% (at a voltage drop at rated current) with respect to the supply voltage on the power supply side. Also, where the effects of an indirect lightning strike are possible, install a lightning conductor.

Step-by-Step Basic Installation This section will guide you through the following basic steps of installation: Step 1 2 3 4 5 6 7 8 9 10

Activity Choose a mounting location in compliance with the Warnings and Cautions. See NOTE below. Check the mounting location for adequate ventilation Cover the inverter’s ventilation openings to prevent debris from entering. Check the inverter dimensions for footprint and mounting hole locations. Study the Cautions, Warnings, wire and fuse sizes, and terminal torque specifications before wiring the inverter. Connect wiring for the inverter power input. Wire the inverter output to the motor. Uncover the inverter’s ventilation openings applied in Step 3. Perform the Powerup Test. (This step includes several sub steps.) Make observations and check your installation.

Page 2-9 2-10 2-10 2-11 2-16 2-17 2-21 2-22 2-22 2-33

NOTE: If the installation is in an EU country, study the EMC installation guidelines in Appendix D.

Page 56

2−9

Choosing a Mounting Location 1

Step 1: Study the following caution messages associated with mounting the inverter. This is the time when mistakes are most likely to occur that will result in expensive rework, equipment damage, or personal injury.

CAUTION: Be sure not to place any flammable materials near the inverter. Otherwise, there is the danger of fire. CAUTION: Be sure not to let the foreign matter enter vent openings in the inverter housing, such as wire clippings, spatter from welding, metal shavings, dust, etc. Otherwise, there is the danger of fire. CAUTION: Be sure to install the inverter in a place that can bear the weight according to the specifications in the text (Chapter 1, Specifications Tables). Otherwise, it may fall and cause injury to personnel. CAUTION: Be sure to install the unit on a perpendicular wall that is not subject to vibration. Otherwise, it may fall and cause injury to personnel. CAUTION: Be sure not to install or operate an inverter that is damaged or has missing parts. Otherwise, it may cause injury to personnel. CAUTION: Be sure to install the inverter in a well-ventilated room that does not have direct exposure to sunlight, a tendency for high temperature, high humidity or dew condensation, high levels of dust, corrosive gas, explosive gas, inflammable gas, grinding-fluid mist, salt damage, etc. Otherwise, there is the danger of fire.

InverterInverter Mounting Mountingand and installation installation

CAUTION: Be sure to install the unit on flame-resistant material such as steel plate. Otherwise, there is the danger of fire.

Page 57

2−10

Ensure Adequate Ventilation and installation

Inverter Mountingand installation Inverter Mounting

2

Step 2: To summarize the caution messages – you will need to find a solid, nonflammable, vertical surface that is in a relatively clean and dry environment. In order to ensure enough room for air circulation around the inverter to aid in cooling, maintain the specified clearance and the inverter specified in the diagram.

Clear area

10 cm (3.94”) minimum

Air flow

X200 inverter 5 cm (1.97”) minimum

5 cm (1.97”) minimum

10 cm (3.94”) minimum

CAUTION: Be sure to maintain the specified clearance area around the inverter and to provide adequate ventilation. Otherwise, the inverter may overheat and cause equipment damage or fire.

Keep Debris Out of Inverter Vents 3

Step 3: Before proceeding to the wiring section, it’s a good time to temporarily covers the inverter’s ventilation openings. Paper and masking tape are all that is needed. This will prevent harmful debris such as wire clippings and metal shavings from entering the inverter during installation. Please observe this checklist while mounting the inverter: 1. The ambient temperature must be in the range of to 40qC.

Ventilation holes (top)

Ventilation holes (both sides)

2. Keep any other heat-producing equipment as far away from the inverter as possible. 3. When installing the inverter in an enclosure, maintain the clearance around the inverter and verify that its ambient is within specification when the enclosure door is closed. 4. Do not remove the front housing at any time during operation.

Page 58

2−11

Check Inverter Dimensions Step 4: Locate the applicable drawing on the following pages for your inverter. Dimensions are given in millimeters (inches) format. X200-002SFEF, -004SFEF, -002NFU, -004NFU

D

InverterInverter Mounting Mountingand and installation installation

D1

4

D [mm] 93 107

D1 [mm] 13 27

Applied model -002NFU, -002SFEF -004NFU, -004SFEF

NOTE: Some inverter housing require two mounting screws, while other requires four. Be sure to use lock washers or other means to ensure screws do not loosen due to vibration. CAUTION: Power terminal assignment is different compared to old models such as L100, L200 series, etc,. Pay attention when wiring the power cable

Page 59

2−12

Dimensional drawings, continued… and installation

Inverter Mountingand installation Inverter Mounting

X200-005SFEF,007SFEF, -007NFU

CAUTION: Power terminal assignment is different compared to old models such as L100, L200 series, etc,. Pay attention when wiring the power cable

Page 60

2−13

Dimensional drawings, continued…

Inverter Mountingand installation

Inverter Mounting and installation

X200-011SFEF~022SFEF, -015NFU~022NFU, -037LFU

CAUTION: Power terminal assignment is different compared to old models such as L100, L200 series, etc,. Pay attention when wiring the power cable