For the Honeywell RM7890
Page 1
RM7890A1056, RM7890B1048 7800 SERIES Relay Modules INSTALLATION INSTRUCTIONS
APPLICATION The Honeywell RM7890A1056 and RM7890B1048 Relay Modules are microprocessor based integrated burner controls for automatically fired, gas only (if Valve Proving feature is going to be used), single burner on/off applications. The RM7890A1056 and RM7890B1048 System consists of a relay module, subbase, and amplifier. Options include keyboard display module (KDM) and remote display mounting. Functions the RM7890 provides include automatic on/off burner sequencing, flame supervision, system status indication, system or self-diagnostics and troubleshooting. RM7890A1056 and RM7890B1046 Relay Modules offer the following additional features: • Preignition Interlock Input • Selectable Intermittent/Interrupted Pilot Function (full pilot flame and main flame establishing periods apply if interrupted pilot feature selected). • Run/Test Switch for interrupted pilot setup. • Blinkum fault annunciation on safety shutdown (power LED blinks a fault code. • Built-in features set up only using the S7800A1142 display. • Valve Proving System. The Valve Proving System feature provides a systematic way of testing the valve seat integrity to assure the valves are indeed in the closed state when the system is in Standby. At commissioning time, the Valve Proving System may be scheduled to occur at one of five different times: 1. 2. 3. 4. 5.
Never - Device default as received; valve proving does not occur. Before - Valve proving after standby and safe start check, prior to ignition trials. After - Valve proving occurs after the Run state before the device goes to Standby. Both - Valve proving occurs at both times Before and After noted above. Split - The downstream (high pressure) seat test is performed at the Before time and the upstream (low pressure) seat test is performed during the After time.
The following assumptions apply when using the RM7890A1056 or RM7890B1048 Valve Proving testing: MV2
MV1 VP SW. INLET
OUTLET
1 1 CAUTION: VALVE ENERGIZING TIMING IS BASED ON VALVE OPENING TIMES OF 13 SECONDS MAXIMUM. − FOR VALVES WITH TIMINGS GREATER THAN 13 SECONDS - A BYPASS SOLENOID (RATED AS A SAFETY SHUTOFF VALVE) VALVE (1/4”, 120 VAC) IS REQUIRED TO OBTAIN THE PROPER TEST PRESSURES. − THE BYPASS VALVE WILL BE WIRED IN PARALLEL TO THE VALVE IT IS BYPASSING (TERMINAL 9 FOR MV1 OR TERMINAL 17 FOR MV2). M22660B
Fig. 1. Valve Proving System - simplified diagram. MV1 - Wired to terminal 9. It is located at the most upstream position of the main gas valve train. VPS - Valve Proving Switch (Rated 1/2 of main valve inlet pressure. MV2 - Wired to terminal 17. It is the main valve located closest to the burner. The Proof of Closure Switch (or PII - Preignition Interlock) for terminal 20 can be installed on MV1, MV2, or both valves.
WARNING
Explosion Hazard. Can cause severe injury, death or property damage. Be sure to select adequate testing times when the Valve Proving feature is enabled. A shorter time can result in inadequate leak testing of the valves.
SIL3 Capable
66-1150-02
Page 2
RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES
This document provides installation and static checkout instructions. Other applicable publications are:
WARNING
Electrical Shock Hazard. Can cause personal injury, death or equipment damage. Disconnect the power supply before beginning installation.
65-0084: Q7800A,B 22-Terminal Wiring Subbase Product Data. 65-0288: S7800A1142 Keyboard Display Module Product Data. 65-0091: S7810A Data ControlBus Module™ Product Data. 65-0095: S7820 Remote Reset Module Product Data. 65-0097: 221729C Dust Cover Installation Instructions. 65-0109: R7824, R7847, R7848, R7849, R7851, R7861, R7886 Flame Amplifiers for the 7800 SERIES Product Data. 65-0131: 221818A,C Extension Cable Assembly Product Data. 65-0229: 7800 SERIES Relay Modules Checkout and Troubleshooting. 65-0249 S7810M ModBus Module.
When Installing this Product... 1. 2. 3.
SPECIFICATIONS
4.
Electrical Ratings (See Table 3): Voltage and Frequency: RM7890: 120 Vac (+10/-15%), 50/60 Hz (±10%). Power Dissipation: 10W maximum. Maximum Total Connected Load: 2000 VA. Fusing Total Connected Load: 15A maximum, type SC or equivalent, fast blow. Environmental Ratings: Ambient Temperature: Operating: -40°F to +140°F (-40°C to +60°C). Storage: -40°F to +150°F (-40°C to +66°C). Humidity: 85% relative humidity continuous, noncondensing. Vibration: 0.5G environment. SIL 3 Capable: SIL 3 Capable in a properly designed Safety Instrumented System. See form number 65-0312 for Certificate Agreement. Approvals: RM7890A,B: Underwriters Laboratories Inc. Listed: File No. MP268, Guide No. MCCZ. Canadian Standards Association Certified: LR95329-3. Factory Mutual Approved: Report No. J.I.1V9A0.AF. Swiss Re (formerly Industrial Risk Insurers) : Acceptable. Federal Communications Commission: Part 15, Class B, Emissions.
INSTALLATION
WARNING
Fire or Explosion Hazard. Can cause property damage, serious injury, or death. To prevent possible hazardous burner operation, verify safety requirements each time a control is installed on a burner.
66-1150 - 02
2
Read these instructions carefully. Failure to follow them could damage the product or cause a hazardous condition. Check the ratings given in the instructions and marked on the product to make sure the product is suitable for the application. Installer must be a trained, experienced, flame safeguard service technician. After installation is complete, check out the product operation as provided in these instructions.
IMPORTANT 1. Wiring connections for the relay modules are unique; refer to Fig. 2 or the appropriate Specifications for individual subbase wiring. 2. Wiring must comply with all applicable codes, ordinances and regulations. 3. Wiring must comply with NEC Class 1 (Line Voltage) wiring. 4. Loads connected to the RM7890 must not exceed those listed on the RM7890 label or the Specifications; see Tables 3, 4, and 5. 5. Limits and interlocks must be rated to simultaneously carry and break current to the ignition transformer, pilot valve, and main fuel valve(s). 6. All external timers must be listed or componentrecognized by authorities who have proper jurisdiction. 7. For on-off gas-fired systems, some authorities who have jurisdiction prohibit the wiring of any limit or operating contacts in series between the flame safeguard control and the main fuel valve(s). 8. Two flame detectors can be connected in parallel with the exception of Infrared Flame Detectors (C7915) and solid state models C7927, C7952, and C7961. 9. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, can cause interference with radio communications. It has been tested and found to comply with the limits for a Class B computing device of Part 15 of FCC rules which are designed to provide reasonable protection against such interference when operated in a commercial environment. Operation of this equipment in a residential area can cause interference, in which case, the users, at their own expense, may be required to take whatever measures are required to correct this interference. 10.This digital apparatus does not exceed the Class B limits for radio noise for digital apparatus set out in the Radio Interference Regulations of the Canadian Department of Communications.
Page 3
RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES
Location
3.
Humidity Install the relay module where the relative humidity never reaches the saturation point. The relay module is designed to operate in a maximum 85% relative humidity continuous, noncondensing, moisture environment. Condensing moisture can cause a safety shutdown.
4.
5.
Vibration Do not install the relay module where it can be subjected to vibration in excess of 0.5G continuous maximum vibration.
Weather The relay module is not designed to be weather tight. When installed outdoors, protect the relay module in an approved weather-tight enclosure. 6.
Mounting Wiring Subbase See Fig. 2 for the internal block diagram of RM7890 Relay Module. 1.
2.
3. 4.
Mount the subbase in any position except horizontally with the bifurcated contacts pointing down. The standard vertical position is recommended. Any other position decreases the maximum ambient temperature rating. Select a location on a wall, burner or electrical panel. The Q7800 can be mounted directly in the control cabinet. Be sure to allow adequate clearance for servicing, installation, access or removal of the RM7890, expanded annunciator, KDM, flame amplifier, flame amplifier signal voltage probes, run/test switch, electrical signal voltage probes and electrical field connections. For surface mounting, use the back of the subbase as a template to mark the four screw locations. Drill the pilot holes. Securely mount the subbase using four no. 6 screws (not provided).
Wiring
NOTE: Use 13 Vdc power supply any time more than two KDM or Data ControlBus Modules™ are used or are placed more than 100 feet (31 meters) from the relay module. 7.
8. 9.
WARNING
Electrical Shock Hazard. Can cause personal injury or equipment damage. Disconnect the power supply before beginning installation.
1. 2.
For proper subbase wiring and sequence chart, refer to Fig. 3. For proper remote wiring of the KDM, refer to the Specifications for the KDM (65-0288), Data ControlBus Module™ (65-0091) or Extension Cable Assembly (650131).
3
Disconnect the power supply from the main disconnect before beginning installation to prevent electrical shock and equipment damage. More than one disconnect can be required. All wiring must comply with all applicable electrical codes, ordinances and regulations. Wiring, where required, must comply with NEC, Class 1 (Line Voltage) wiring. Use recommended wire routing of leadwires: a. Do not run high voltage ignition transformer wires in the same conduit with the flame detector, Data ControlBus Module™, or Remote Reset Module wiring. b. Do not route flame detector, Data ControlBus Module™, or Remote Reset Module leadwires in conduit with line voltage circuits. c. Enclose flame detector leadwires without armor cable in metal cable or conduit. d. Follow directions in flame detector, Data ControlBus Module™, or Remote Reset Module Instructions. For KDM: Because the KDM is powered from a low voltage, energy limited source, it can be mounted outside of a control panel if it is protected from mechanical damage.
10. 11.
Maximum wire lengths: a. RM7890 leadwires: The maximum leadwire length is 300 feet (91 meters) to terminal inputs (Control, Running/Lockout Interlock/Preignition Interlock). b. Flame Detector leadwires: The maximum flame sensor leadwire length is limited by the flame signal strength. c. Remote Reset leadwires: The maximum length of wire is 1000 feet (305 meters) to a Remote Reset pushbutton. d. Data ControlBus Module™: The maximum Data ControlBus Module™ cable length depends on the number of system modules connected, the noise conditions and the cable used. The maximum length of all Data ControlBus Module™ interconnecting wire is 4000 feet (1219 meters). For recommended wire size and type, see Table 1. The KDM, Data ControlBus Module™ (for remote mounting) must be wired in a daisy chain configuration, 1(a)-1(a), 2(b)-2(b), 3(c)-3(c). The order of interconnection of all the devices listed above is not important. Be aware that modules on the closest and farthest end of the daisy chain configuration string may require a 120 ohm (1/4 watt minimum) resistor termination across terminals 1 and 2 of the electrical connectors for connections over 100 feet (31 meters). For recommended grounding practices, see Table 2. Be sure loads do not exceed the terminal ratings. Refer to the label on the RM7890 or to the terminal ratings in Table 3.
66-1150 - 02
Page 4
RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES
. Table 1. Recommended Wire Sizes and Part Numbers. Application
Recommended Wire Size
Recommended Part Numbers
Line voltage terminals
14, 16, or 18 AWG copper conductor, 600 volt insulation wire.
TTW60C, THW75C, THHN90C.
Keyboard Display Module
22 AWG two-wire twisted pair with ground, or five-wire.
Belden 8723 shielded cable or equivalent.
Data ControlBus Module™
22 AWG two-wire twisted pair with ground, or five-wire.
Belden 8723 shielded cable or equivalent.
Remote Reset Module
22 AWG two-wire twisted pair, insulated for, low voltage.
13 Vdc full-wave rectified transformer power input.
18 AWG wire insulated for voltages and temperatures for given application.
TTW60C, THW75C, THHN90C.
Table 2. Recommended Grounding Practices. Ground Type
Recommended Practice
Earth ground (subbase and relay module).
1. Use to provide a connection between the subbase and the control panel of the equipment. Earth ground must be capable of conducting enough current to blow the 15A fuse (or breaker) in the event of an internal short circuit. 2. Use wide straps or brackets to provide minimum length, maximum surface area ground conductors. If a leadwire is required, use 14 AWG copper wire. 3. Make sure that mechanically tightened joints along the ground path are free of nonconductive coatings and protected against corrosion on mating surfaces.
Signal ground (Keyboard Display Module, Data ControlBus Module™.
Use the shield of the signal wire to ground the device to the signal ground terminals - 3(c) - of each device. Connect the shield at both ends of the daisy chain to earth ground. Table 3. Terminal Ratings.
Terminal Number
Description
Ratings (RM7890A,B)
G
Flame Sensor Ground, Earth G
Earth Grounda, L2(N)
Line Voltage Common, 3
Line Voltage Supply (L1)
120 Vac (+10%/-15%), 50 or 60 Hz (±10%).b
4
Alarm
120 Vac, 1A pilot duty.
5
Unused, 6
Burner Controller and Limits
120 Vac, 1 mA.
7
Jumper
120 Vac, 8A run, 43A inrush.
8
Pilot Valve/Ignition.
120 Vac.c
9
Main Fuel Valve 1.
120 Vac.c
10
Ignition
120 Vac, 4.5A ignition.c
F(11)
Flame Sensor
60 to 220 Vac, current limited.
12 to 15
Unused., 16
Valve Proving Switch
120V, 1 mA.
17
MV2 (for Valve Proving)
120 Vac.c
18
Unused, 19
Unused, 20
Preignition Interlock
120V, 1 mA
21
Unused, 22
Shutter
120 Vac, 0.5A (RM7890B).
66-1150 - 02
4
Page 5
RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES a
The RM7890 must have an earth ground providing a connection between the subbase and the control panel or the equipment. The earth ground wire must be capable of conducting the current to blow the 15A, type SC, fast blow, fuse (or breaker) in event of an internal short circuit. The RM7890 needs a low impedance ground connection to the equipment frame which, in turn, needs a low impedance connection to earth ground. For a ground path to be low impedance at RF frequencies, the connection must be made with minimum length conductors having maximum surface areas. Wide straps or brackets rather than leadwires are preferred. Be careful to verify that mechanically tightened joints along the ground path, such as pipe or conduit threads or surfaces held together with fasteners, are free of nonconductive coatings and are protected against mating surface corrosion. b 2000 VA maximum connected load to the RM7890 Assembly. c See Tables 4 and 5 for device load combinations. Table 4. Combinations for Terminals 8, 9,17 and 10. Pilot Fuel 8
Main 9 (MV1)
Main 17 (MV2)
Ignition 10
C
F
F
No Load
B
F
F
No Load
F
F
F
A
F
No Load
No Load
A
D
F
F
A
D
D
D
A
D
No Load
No Load
A
Table 5. Composition of Each Combination. A 4.5A ignition
B
C
D
50 VA Pilot Duty plus 4.5A ignition.
180 VA ignition plus motor valves with: 660 VA inrush, 360 VA open, 250 VA hold.
Final Wiring Check 1.
2. 3. 4.
Check the power supply circuit. The voltage and frequency tolerance must match those of the RM7890. A separate power supply circuit can be required for the RM7890. Add the required disconnect means and overload protection. Check all wiring circuits and complete the Static Checkout in Table 7 before installing the RM7890 on the subbase. Install the relay module. Restore the panel power.
STATIC CHECKOUT After checking all wiring, perform this checkout before installing the RM7890 on the subbase. These tests verify the Q7800 Wiring Subbase is wired correctly, and the external controllers, limits, interlocks, actuators, valves, transformers, motors and other devices are operating properly.
2A Pilot Duty.
F 65 VA Pilot Duty plus motor valves with: 3850 VA inrush, 700 VA Open, 250 VA hold.
WARNING
Explosion Hazard. Can cause serious injury, death or equipment damage. 1. Close all manual fuel shutoff valve(s) before starting these tests. 2. Use extreme care while testing the system. Line voltage is present on most terminal connections when power is on. 3. Open the master switch before installing or removing a jumper on the subbase. 4. Before continuing to the next test, be sure to remove test jumper(s) used in the previous test. 5. Replace all limits and interlocks that are not operating properly. Do not bypass limits and interlocks.
CAUTION
Equipment Damage Hazard. Can cause equipment damage or equipment failure. Do not perform a dielectric test with the RM7890 installed. Internal surge protectors break down and conduct a current, causing the RM7890 to fail the dielectric test or possibly destroy the internal lightning and high current protection.
5
66-1150 - 02
Page 6
RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES
Equipment Recommended 1. 2.
7.
Voltmeter (1M ohm/volt minimum sensitivity) set on the 0 to 300 Vac scale. Two jumper wires, No. 14 wire, insulated, 12 in. (304.8 mm) long with insulated alligator clips at both ends. An ammeter can replace the jumper so the load ratings of the ignition transformer or valves (terminals 8, 9, 10, or 17) can be compared to their respective ratings.
8. 9. 10. 11.
General Instructions 1. 2. 3. 4. 5. 6.
Perform all applicable tests listed in the Static Checkout, Table 6, in the order listed. Make sure all manual fuel shutoff valves are closed. For each test, open the master switch and install the jumper wires between the subbase wiring terminals listed in the Test Jumpers column. Close the master switch before observing the operation. Read the voltage between the subbase wiring terminals listed in the Voltmeter column. If there is no voltage or the operation is abnormal, check the circuits and external devices as described in the last column.
Check all wiring for proper connections, tight terminal screws, and appropriate wire and wiring techniques. Replace all damaged or incorrectly sized wires. Replace faulty controllers, limits, interlocks, actuators, valves, transformers, motors and other devices, as required. Make sure normal operation is obtained for each required test before continuing the checkout. After completing each test, be sure to remove the test jumper(s).
WARNING
Explosion Hazard. Can cause serious injury or death. Be sure all manual fuel shutoff valves are closed.
IMPORTANT Low fuel pressure limits, if used, could be open. Bypass them with jumpers for the remaining static tests (if required).
Table 6. Static Checkout. Test No.
Test Jumpers
Voltmeter
Normal Operation
If Operation is Abnormal, Check the Items Listed Below
1, 4-L2
Line Voltage.
1. Master switch. 2. Power connected to the master switch. 3. Overload protection (fuse, circuit breaker, etc.) has not opened the power line.
2, 6-L2
Line Voltage.
1. Limits. 2. Burner control.
3, 20-L2
Line Voltage
Preignition Interlock.
4
4-10, Ignition spark (if ignition transformer is connected to terminal 10).
5
4-8, 1. Ignition spark (if ignition transformer is connected to terminal 8). 2. Automatic pilot valve opens (if connected to terminal 8).
6
3-4, Alarm (if used) turns on.
66-1150 - 02
1. Watch for spark or listen for buzz. a. Ignition electrodes are clean b. Ignition transformer is okay.
1. Watch for spark or listen for buzz: a. Ignition electrodes are clean. b. Ignition transformer is okay. 2. Listen for click or feel head of valve for activation: a. Actuator, if used. NOTE: Refer to wiring diagram of b. Pilot valve. system being tested.
6
1. Alarm.
Page 7
RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES
Table 6. Static Checkout. (Continued) Test No.
Test Jumpers
Voltmeter
If Operation is Abnormal, Check the Items Listed Below
Normal Operation
7
4-9, Automatic fuel valve(s) opens. If Same as test number 4. If using direct spark using direct spark ignition, check ignition, check the first stage fuel valve(s) instead the first stage fuel valve(s) instead of the pilot valve. of the pilot valve.
7a, 16-L2
Line Voltage
7b
4-17, Automatic Fuel Valve 2 opens.
FINAL
Conduct after test 7. Valve Proving Switch should close to pressure trapped between Valves 1 and 2.
CAUTION
Equipment Damage Hazard. Can cause serious equipment damage. After completing these tests, open the master switch, remove all test jumpers from the subbase terminals, and remove any bypass jumpers from the low fuel pressure limits to prevent equipment damage. L1 L2 (HOT)
2
3 CONFIGURATION JUMPERS
1
TEST JACK
FLAME SIGNAL
L2
F MICROCOMPUTER
RESET PUSHBUTTON
PLUG-IN FLAME TEST AMPLIFIER
RELAY 2K DRIVE CIRCUIT 3K
RELAY STATUS FEEDBACK AND LINE VOLTAGE INPUTS
4K SAFETY RELAY CIRCUIT
STATUS LEDs LIMITS
1K POWER SUPPLY
CONTROLLER
1K1
2K2 5K1
6 3
3K1
DDL
4K1
7
7K
OPTIONAL KEYBOARD DISPLAY MODULE RS485
DDL COMMUNICATIONS
1
2
3
CONTROL POWER 10
IGNITION
8
PILOT
9
MAIN VALVE 1
4
ALARM
17
MAIN VALVE 2
2K2
LIMIT INPUT
G 22
INDICATES FEEDBACK SENSING TO RELAY STATUS FEEDBACK AND LINE VOLT INPUTS
REMOTE RESET
VALVE PROVING SWITCH
FIELD WIRING INTERNAL WIRING 16
PRE-IGNITION INTERLOCK 20
1
NUMBERS IN CIRCLES ARE RELAY MODULE TERMINAL NUMBERS.
2
PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION AS REQUIRED; 120 VAC, 50/60 HZ POWER SUPPLY.
3
TERMINAL 7 MUST BE POWERED. IF VALVE PROVING OPTION IS “NEVER” OR “BEFORE”, A JUMPER MAY BE INSTALLED BETWEEN SUBBASE TERMINALS 6 AND 7 . M23030A
Fig. 2. Internal block diagram of the RM7890.
7
66-1150 - 02
Page 8
RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES
Mounting RM7890 Relay Module 1.
2.
3.
Mount the RM7890 vertically on the Q7800 Subbase, or mount horizontally with the knife blade terminals pointing down. When mounted on the Q7800A, the RM7890 must be in an electrical enclosure. When mounting in an electrical enclosure, provide adequate clearance for servicing, installation and removal of the RM7890, KDM, flame amplifier, flame amplifier signal voltage probes, electrical signal voltage probes, and electrical connections. a. Allow an additional two inches (51 mm) below the RM7890 for flame amplifier mounting. b. Allow an optional three-inch (76 mm) minimum to both sides of the RM7890 for electrical signal voltage probes. Make sure no subbase wiring is projecting beyond the terminal blocks. Tuck in wiring against the back of the subbase so it does not interfere with the knife blade terminals or bifurcated contacts.
66-1150 - 02
8
IMPORTANT Install the RM7890 with a plug-in motion rather than a hinge action. 4.
Mount the RM7890 by aligning the four L-shaped corner guides and knife blade terminals with the bifurcated contacts on the wiring subbase and securely tightening the two screws without deforming the plastic.
Mounting Other System Components (Fig. 4) Refer to the applicable specifications for mounting other system components.
Page 9
RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES
Q7800
L1 (HOT) 1
L2 MASTER SWITCH
LINE VOLTAGE ALARM
3
G
12
L2
13
3 (L1)
14
4
15
5
16
VALVE PROVING SWITCH
6
17
MAIN FUEL VALVE 2
2
BURNER CONTROLLER/LIMITS
7
18
INTERMITTENT PILOT/IGNITION
8
19
MAIN FUEL VALVE 1
9
20
IGNITION
10
21
FLAME DETECTOR
F
PRE-IGNITION INTERLOCK
4
22
5
5 00 4/10 PFEP MFEP 4 OR 10 SEC
00 LED DISPLAY
INITIATE POWER
STANDBY POWER
SAFESTART POWER
POWER PILOT FLAME MAIN ALARM IGNITION
BURNER START
20 RUN
POWER PILOT FLAME MAIN ALARM 10
POWER PILOT FLAME MAIN ALARM
FLAME SIGNAL
MAIN VALVE LIMITS AND BURNER CONTROL CLOSED SAFE START CHECK PREIGNITION INTERLOCK (PII)
1
2
POWER
6
INTERMITTENT PILOT OPERATING CONTROLLER AND LIMITS
STANDBY
8 9 3 TO 6
FLAME PROVING
SSC
20
PII
120V, 50/60 HZ POWER SUPPLY. PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION AS REQUIRED. TERMINAL 7 MUST BE POWERED. IF VALVE PROVING OPTION IS “NEVER” OR “BEFORE”, A JUMPER BETWEEN SUBBASE TERMINALS 6 AND 7 MAY BE INSTALLED. IF SPLIT, BOTH OR AFTER OPTION IS USED, TERMINAL 7 SHOULD GET POWER FROM L1, CHECK LOCAL CODES REGARDING PLACEMENT OF LIMITS IN SERIES WITH THIS CONNECTION.
3
DO NOT CONNECT ANY WIRES TO UNUSED TERMINALS.
4
TERMINAL 22 IS ONLY ON THE RM7890B.
5
SEE FLAME DETECTOR SPECIFICATION FOR CORRECT WIRING.
6
TERMINAL 8 TURNS OFF IF JR3 IS CLIPPED. M23031B
Fig. 3. Wiring subbase and operating sequence chart for RM7890. 5.
Mount the RM7890 by aligning the four L-shaped corner guides and knife blade terminals with the bifurcated contacts on the wiring subbase and securely tightening the two screws without deforming the plastic.
Mounting Other System Components (Fig. 4)
9
66-1150 - 02
Refer to the applicable specifications for mounting other system components.
Page 10
RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES
WIRING SUBBASE
HONEYWELL RELAY MODULE
CONFIGURATION JUMPERS
SEQUENCE STATUS LED PANEL POWER
RESET BUTTON
PILOT
MAIN FLAME ALARM
CAPTIVE MOUNTING SCREW
RESET
DUST COVER
BURNER CONTRO
L
FLAME AMPLIFIER
M11588A
Fig. 4. RM7890 Relay Module exploded view.
VALVE PROVING SYSTEM
After - Valve Proving occurs after the Run state before the internal Safety Relay dropout state.
The Valve Proving System feature provides a systematic way of testing the valve seat integrity to assure the valves are in the closed state whenever the sequence of operation required them to be closed. It is designed to detect a leak greater than 0.1% of the burner input capacity. For example, a 10 million Btu/hr natural gas fueled burner would have a fuel capacity of approximately 1000 ft3/hr. A leak rate greater than 0.1% of 1000 ft3/hr or 1 ft3/hr in either valve will be detected with the Valve Proving System. Smaller leaks will not be detected.
Both - Valve proving occurs at both times Before and After noted above.
At commissioning time, the Valve Proving System may be scheduled to occur at one of five different times: Never, Before, After, Both, and Split.
Split - The downstream (high pressure) seat test is performed at the Before time and the upstream (low pressure) seat test is performed during the After time. The Valve Proving items programmed: 1. 2.
Enable Valve proving and when to perform it. Define the time duration of the test is calculated using Appendix A.
Valve Proving Function
Never - Device Fault as received: in this case Valve Proving does not occur.
Valve proving consists of monitoring the pressure in the space between two shutoff valves, MV1 (upstream) and MV2 (downstream). The valve proving function, identified by letters A through G, operates as follows:
Before - Valve Proving occurs after Standby and Safe Start Check, but before Run.
The tolerance on all valve proving timing values is ±10%. 66-1150 - 02