Page 11

RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES

The following are steps performed during valve proving tests. This section is for background information and does not define the exact behavioral requirements.

E. MV1 is commanded to be open, while MV2 remains closed, to pressurize the space. After four seconds, MV1 is commanded closed again.

A. The RM7890 must have an input on terminal 7 (to power the valves for testing). If the Valve Proving Test is conducted After, Both or Split, terminal 7 must be powered from the L1 source.

F. This is followed by a three second delay, during which the valve proving pressure switch (VPS) is ignored. G. Thereafter, the VPS is monitored for the duration of the valve proving test time and, if it turns off, a lockout occurs. (Because the gas pressure has decreased due to a leaky downstream valve [high pressure test].)

B. MV2 is commanded to be open while MV1 remains closed; to depressurize the space. After four seconds, MV2 is commanded closed again.

Pressure Switches for Valve Proving System

C. This is followed by a three second delay during which the valve proving pressure switch (VPS) is ignored. D. Thereafter, the VPS is monitored for the duration of the valve proving test time and, if it turns on, a lockout occurs. (Because the gas pressure has increased due to a leaky upstream valve [low pressure test].)

The Valve Proving System requires a pressure switch to be installed to monitor the pressure in the internal space between the two shutoff valves. Recommended pressure switches are the following Honeywell non-manual reset models:

Table 7. Honeywell Pressure Switch Selection for Valve Proving System. 1

Model Number

2

3

4

5

6

Operating Pressure Range

Maximum Differential (Additive)

Maximum Continuous Rated Pressure (psi)

Switch Action at Setpoint

Mounting Type

C6097A1004

0.4 to 5 in. wc

0.24 in. wc

2.9

C6097A1053

3 to 21 in. wc

0.48 in. wc

5.0

12 to 60 in. wc

2.4 in. wc

1.5 to 7 psi

0.3 psi

9.3

0.4 to 4 in. wc

0.24 in. wc

2.9

Breaks N.O. to C connection on pressure fall.

C6097A1061 C6097A1079

Flange 1/4 in. NPT

C6097A1137 C6097A1210

Flange

Pressure Switch Selection 1. 2. 3.

4.

Flange 1/4 in. NPT

C6097A1087 C6097A1129

1/4 in. NPT

Determine the maximum operating inlet pressure for the upstream valve; for example, 5.0 psi (140 in. wc). Divide the inlet pressure by two (2.5 psi [70 in. wc], for example). From column 2 in Table 7 find the operating range upper limit that is closest to but greater than the inlet pressure divided by two. In the example given, the possible selections from column 1 are the C6097A1129 and C6097A1137 with an operating range upper limit of 7 psi. (The C6097A1079 and C6097A1087 with an upper limit of 60 in. wc are close, but 60 in. wc is less than the 70 in. wc minimum, so the next higher range must be selected.) From column 6, select the preferred mounting type, 1/4 in. NPT or Flange. For example, if a flange mount is required, the pressure switch choice from column 1 would be the C6097A1137.

Pressure Switch Installation and Adjustment 1. 2. 3. 4.

Refer to the instructions for theC6097A Pressure Switch, form number 65-0237. Install the C6097A Pressure Switch according to the instructions. Adjust the setpoint to 50% of the maximum operating inlet pressure for the upstream valve. Complete the operation and checkout procedures in the instructions.

Setup of Valve Proving Function Prior to setup of the Valve Proving Function, follow the procedures in the appendix to complete the worksheet and obtain the Valve Proving Test Time. An S7800A1142 Keyboard Display Module (KDM) is required for this setup and the RM7890 must have the Valve Proving function. When the RM7890 is installed and powered, “STANDBY” will be shown on the first line of the display.

11

66-1150 - 02

Page 12

RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES

1.

Scroll down until the “Setup” is displayed in the second line. (Setup is only available when the control is in Standby or Lockout state.)

BACK -

8.

Use the up/down arrows to select from Never, Before, After, Both, or Split, then press ENTER.

NOTE: Use Never on initial startup so gas line purging and System Checkout can be performed. Then come back to set final operation configuration. Be sure to conduct final checkout of VPS System when this setup is complete.

STANDBY Setup

Edit:

NOTE: This screen sets up when to do the Valve Proving Test.

ENTER

+

M22662B

Fig. 5. STANDBY/Setup screen. 2.

=Save changes =Restart

Enter the Setup submenu by pressing the far right key on the display. Note that the second line now reads “BC Password”.

BACK Edit:

-

ENTER

+

M22665B

STANDBY ± BC Password: 00

SU

Fig. 9. Save Changes screen. 9.

BACK Edit:

-

Use the down arrow to save changes. After pressing the down arrow, “Getting Data” is displayed.

ENTER

+

M22663B

SETUP: ValveProve ±VP Time: 00:00

Fig. 6. Password screen. 3. 4. 5. 6.

Use the up/down arrows to enter the first number - 7. Use the far right key to shift over one space. Use the up/down arrows to enter the second number 8. Press ENTER (left/right arrow simultaneously).

SU

BACK Edit:

-

ENTER

+

M22666B

Fig. 10. Valve Prove time screen. This screen sets up how long the RM7890 will conduct the Valve Proving Test for a given time. VP Time: 00:30 is shown.

=Select =Restart

10.

Enter the appropriate Valve Proving test time from the worksheet in the appendix. Use the up arrow to increase time. Time increases:

BACK Edit:

-

ENTER

+

M22764B a. 0 to 60 seconds in 1-second intervals. b. 60 to 600 seconds in 10-second intervals. c. 10 to 60 minutes in 1-minute intervals.

Fig. 7. Select/Restart screen. 7.

To get to the next screen, press down arrow. “Getting Data” will be displayed, then the following screen.

SETUP: ValveProve ± VP When: BEFORE

NOTE: The minimum default test time is 10 seconds. Press ENTER when correct time is displayed.

SU =Save changes =Restart

BACK Edit:

-

+

ENTER

BACK M22664B

Edit:

-

+

ENTER

Fig. 8. SETUP: Valve Prove screen.

M22665B

Fig. 11. Save Changes screen. 66-1150 - 02

12

Page 13

RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES

11.

Use the down arrow to save changes. After pressing the down arrow, “Getting Data” is displayed. 12. Use down arrow to save changes. “Getting Data” is displayed.

15.

Press ENTER.

=Confirm correct =Incorrect

The following steps are to confirm your selections.

BACK Edit:

CONFIRM:ValvProve ±VP When: BEFORE ?

-

ENTER

+

SC

M22671B

Fig. 15. Confirm Correct screen. BACK Edit:

-

16. Use the down arrow to confirm correct. “Getting Data” will be displayed.

ENTER

+

M22670B

Fig. 12. Confirmation Acknowledgement screen. 13.

Press ENTER. The Valve Proving test location is shown.

SETUP DONE: Press Reset for 5 sec . . . BACK Edit:

=Confirm correct =Incorrect

-

Fig. 16. Setup Done screen. ENTER

+

17.

Go to the relay module and press and hold the RESET button for five seconds to program the Valve Proving setup into the relay module. The Release Reset screen will appear on the KDM.

M22671B

Fig. 13. Confirmation Correct screen. 14.

ENTER

+

M22676B

BACK Edit:

-

Use the down arrow to confirm correct.

NOTE: Using the up arrow during the confirmation will take you back to the beginning of the setup routine. “Getting Data” will be displayed, followed by the Selected Value Proving time.

SETUP DONE: ... release Reset BACK Edit:

-

+

ENTER M22765B

CONFIRM: ValveProve ±VP Time: 00:30 ?

SC

Fig. 17. Release Reset screen. Changing the Valve Proving features is still possible. With the relay module in Start Switch, scroll to the Setup line and enter the password to change the settings.

BACK Edit:

-

+

ENTER

Once the system is in operation, the settings of the Valve Proving can be viewed un Diagnostics, using your S7800 Keyboard Display Module (KDM).

M22672B

Fig. 14. Confirm screen.

13

66-1150 - 02

Page 14

RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES

BEFORE

CONTROLLER

4 SEC.

3 SEC.

4 SEC.

TEST TIME

3 SEC.

IGNITION TRIALS

TEST TIME

L1-6 L1-7 MV2 (17) MV1 (9) VPS (16) PII (20)

PII (20)

VPS (16)

1

PII (20)

2

AFTER

CONTROLLER

RUN

4 SEC.

3 SEC.

4 SEC.

TEST TIME

3 SEC.

STANDBY

TEST TIME

L1-6 L1-7 MV2 (17)

MV1 (9) VPS (16) PII (20)

VPS (16)

1

2

PII (20)

SPLIT

CONTROLLER

STANDBY

4 SEC.

3 SEC.

4 SEC.

BURNER RUN TIME

TEST TIME

3 SEC.

TEST TIME

STANDBY

L1-6 L1-7 MV2 (17)

MV1 (9) VPS (16)

VPS (16)

2

1

LOCKOUT IF ON, M1 LEAKING (LOW PRESSURE TEST).

2

LOCKOUT IF OFF, MV2 LEAKING (HIGH PRESSURE TEST).

1

PII (20)

PII (20)

M22669E

Fig. 18. RM7890 Sequence for Valve Proving System.

PRINCIPAL TECHNICAL FEATURES 5.

The RM7890 provides all customary flame safeguard functions as well as significant advancements in safety, annunciation, and system diagnostics.

Safety Shutdown (Lockout) Occurs if: 1.

2.

3.

4.

INITIATE PERIOD a. AC line power errors occurred, see Operation. b. Configuration jumpers have been changed (after 200 hours). c. Four minute INITIATE period has been exceeded. STANDBY PERIOD a. Flame signal is present after 240 seconds. b. Ignition/pilot valve terminal is energized. c. Internal system fault occurred. d. Main valve terminal (1 or 2) is energized. e. Three second Flame Failure Response Time (FFRT) Amplifier is installed and configuration jumper is selected for relight (see Table 3). f. Pre-Ignition Interlock opens after 30 seconds. SAFE START CHECK a. Ignition/pilot valve terminal is energized. b. Internal system fault occurred. c. Main valve terminal (1 or 2) is energized. d. Pre-Ignition Interlock opens. PILOT FLAME ESTABLISHING PERIOD (PFEP)

66-1150 - 02 a. Ignition/pilot valve terminal is not energized. b. Internal system fault occurred. c. Main valve terminal (1 or 2) is energized. d. No flame present at end of PFEP. RUN PERIOD a. Ignition terminal is energized. b. Internal system fault occurred. c. Main valve terminal (1 or 2) is not energized. d. No flame present and configuration jumper is selected for lockout. e. Pilot valve terminal is not energized (Intermittent Operation). f. Pilot Valve terminal is energized (Interrupted Operation selected).

OPERATION Sequence of Operation The RM7890 has the operating sequences listed below; see Fig. 2. The RM7890 LED provide positive visual indication of the program sequence: POWER, PILOT, FLAME, MAIN and ALARM.

Initiate The RM7890 enters the INITIATE sequence when the relay module is powered. The RM7890 can also enter the INITIATE sequence if the relay module verifies voltage fluctuations of +10/-15% or frequency fluctuations of ±10% during any part of the operating sequence. The INITIATE sequence lasts for ten seconds unless the voltage or frequency tolerances are not

14

Page 15

RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES met. When the tolerances are not met, a hold condition is initiated and is displayed on the optional KDM for at least five seconds. When the tolerances are met, the INITIATE sequence restarts. If the condition is not corrected and the hold condition exists for four minutes, the RM7890 locks out. Causes for hold conditions in the INITIATE sequence: a. AC line dropout detection. b. AC line noise that can prevent a sufficient reading of the line voltage inputs. c. Brownouts caused by a low line voltage. NOTE: If a 3.0 second flame failure response amplifier is installed and configuration jumper JR2 is intact, the RM7890 locks out. JR2 must be clipped.

Standby

SETTINGS AND ADJUSTMENTS Selectable Site-Configurable Jumpers The RM7890 has two site-configurable jumper options, see Fig. 4 and Table 7. If necessary, clip the site-configurable jumpers with side cutters and remove the resistors from the relay module. SERVICE NOTE Clipping and removing a site-configurable jumper enhances the level of safety. If using three-second amplifier, site-configurable jumper JR2 must be clipped and removed. If not removed, an F46 Lockout occurs.

The RM7890 is ready to start an operating sequence when the operating control input (terminal 6) recognizes a call for heat. The burner switch, limits, operating limit control and all microcomputer monitored circuits must be in the correct state for the RM7890 to continue into the Safe Start Check. The RM7890 must also have an input on terminal 7.

SELECTABLE CONFIGURATION JUMPERS

Normal Start-Up Safe Start Check The RM7890 verifies that a flame or flame simulating condition does not exist and proceeds into the Ignition Trial. If a flame or flame simulating condition is present, the RM7890 remains in the STANDBY period. Valve Proving occurs here if Before, Both, or Split sequence is selected.

Ignition Trials a. Pilot Flame Establishing Period (PFEP): (1) The pilot valve and ignition transformer, terminals 8 and 10, are energized. The RM7890 has an intermittent pilot valve, terminal 8. (Interrupted if JR3 is removed). (2) Flame must be proven by the end of the four- or ten-second PFEP or a safety shutdown occurs. (3) Once flame is proven: (a)Intermittent - the ignition, terminal 10, is de-energized and the main valves, terminal 9 and 17, are energized. (b)Interrupted - at the end of the timed PFEP, terminal 10 is de-energized and the main Valve 1 (terminal 9) and main valve 2 (terminal 17) are energized. After a 10-second Main Flame Establishing time, the Pilot Valve (terminal 8) is de-energized.

M22777A

Fig. 19. Selectable site-configurable jumpers. Table 8. Site-Configurable Jumper Options. Jumper Number

Description

Intact

Clippedb

JR1

Pilot Flame Establishing Period (PFEP)

10 seconds 4 seconds

JR2

Flame Failure Action

Relighta

JR3

Pilot Valve (T8)

Intermittent Interrupted

Lockout a

Run The RM7890 is now in RUN and remains in RUN until the controller input, terminal 6, opens, indicating that the demand is satisfied or a limit has opened. The Pre-Ignition Interlock must close five seconds after terminal 6 opens. (It is ignored during Valve-On time in the Valve Proving Sequence if After, Split, or Both option is chosen for Valve Proving tests.) Pre-Ignition Interlock input is required five seconds after the valve output is de-energized.

The Relight feature (JR2 intact) requires a 0.8 second FFRT Flame Amplifier. The RM7890 locks out and indicates a Fault 46 if a 3 second FFRT is used and jumper JR2 is not clipped and removed. bClipping and removing a site-configurable jumper after 200 hours of operation results in a hard lockout, code 110.

SYSTEM CHECKOUT IMPORTANT Perform Static Checkout Procedures before starting these procedures.

15

66-1150 - 02

Page 16

RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES

3.

WARNING

Explosion Hazard. Can cause severe injury, death or property damage. 1. Do not allow fuel to accumulate in the combustion chamber for longer than a few seconds without igniting to prevent danger of forming an explosive mixture. 2. Close manual fuel shutoff valve(s) if flame is not burning at the end of the specified time.

IMPORTANT 1. If the system fails to perform properly, note the fault code, fault message, equipment status, and sequence time on the display. Then refer to the Troubleshooting section. 2. Repeat all required Checkout tests after all adjustments are made. All tests must be satisfied with the flame detector(s) in their final positions.

WARNING

1. 2.

Limit trial for pilot to ten seconds. Limit the attempt to light main burner to two seconds after fuel reaches the burner nozzle. Do not exceed manufacturer nominal lightoff time.

Electrical Shock Hazard. Can cause severe injury, death or property damage. 1. Use extreme care when testing system. Line voltage is present on most terminal connections when power is on. 2. Open the master switch before removing or installing the 7800 SERIES Relay Module or Keyboard Display Module connector. Make sure all manual fuel shutoff valve(s) are closed before starting initial lightoff check and Pilot Turndown tests. Do not put the system into service until you have satisfactorily completed all applicable tests in this section and any others recommended by the original equipment manufacturer.

Equipment Recommended 1. 2.

S7800 Keyboard Display Module Volt-ohmmeter (1 Megohm/volt minimum sensitivity) with: a. 0-300 Vac capability. b. 0-6000 ohm capability. c. 0-10 Vdc capability.

Checkout Summary Table 8 provides an overview of checkout steps performed for each applicable system. See the Installation instructions for location of component parts and/or Q7800 specifications for terminal locations.

Table 9. Checkout Steps and Applicable 7800 Series Systems. Checkout Step

Infrared Flame Detectors

Piloted Systems

Ultraviolet Flame Detectors

Flame Rod Systems

Preliminary Inspection

X

X

X

X

Flame Signal Measurement

X

X

X

X

Initial Lightoff Check for X Proved Pilot PIlot Turndown Test

X

Ignition Interference Test

X

Hot Refractory Saturation Test Hot Refractory Hold-in Test

X X

X

X

X

Ignition Spark Pickup

X

Response to Other Ultraviolet Sources

X

Flame Signal with Hot Combustion Chamber

X

X

X

X

Safety Shutdown Tests

X

X

X

X

Preliminary Inspection

1.

Perform the following inspections to avoid common problems. Make certain that:

2. 3.

66-1150 - 02

16

Wiring connections are correct and all terminal screws are tight. Flame detector(s) is (are) clean, installed and positioned properly. Consult the applicable instructions. Combination of amplifier and flame detector(s) is correctly used. See the amplifier specifications.

Page 17

RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES

4. 5. 6. 7. 8. 9. 10. 11.

Burner is completely installed and ready to fire; consult equipment manufacturer instructions. Fuel lines are purged of air. Combustion chamber and flues are clear of fuel and fuel vapor. Power is connected to the system disconnect switch (master switch). Lockout is reset (reset button) only if the Relay Module is powered. Run/Test Switch (if present) is in the RUN position. System is in STANDBY condition. STANDBY message is displayed in the S7800 Keyboard Display Module. All limits and interlocks are reset.

Flame Signal Measurement See instructions provided with the amplifier.

7.

INITIAL LIGHTOFF CHECKS Proved Pilot Systems

8.

Perform this check on all installations that use a pilot. It should immediately follow the preliminary inspection.

9.

Low fuel pressure limits, if used, could be open. If so, bypass them with jumpers during this check. 1. 2.

3.

4.

5. 6.

Open the master switch. Make sure the manual main fuel shutoff valve(s) is(are) closed. Open the manual pilot shutoff valve. If the pilot takeoff is downstream from the manual main fuel valve(s), slightly open the main valve to supply pilot gas flow. Make sure the main fuel is shut off just upstream from the burner inlet, or disconnect power from the automatic main fuel valve(s). Close the master switch and start the system with a call for heat by raising the setpoint of the operating controller; see the relay module sequence. The 7800 SERIES Relay Module should start the INITIATE sequence. Let the sequence advance to PILOT IGN (status is displayed on the Keyboard Display Module, if used). PILOT LED turns on, ignition spark should occur and the pilot should light. If the pilot ignites, the FLAME LED is energized. Go to step 7. If the pilot flame is not established in ten seconds (four seconds if configuration jumper JR1 is clipped), safety shutdown occurs. Let the sequence complete its cycle. Push the reset pushbutton, and let the system recycle once. If the pilot still does not ignite, make the following ignition/pilot adjustments: a. Open the master switch and remove the 7800 SERIES Relay Module from the subbase. b. On the subbase, jumper L1 to the ignition terminal; refer to the appropriate wiring diagram to determine the proper terminal. Disconnect the leadwire to the pilot valve if it is connected to the same terminal. c. Close the master switch to energize only the ignition transformer. d. If the ignition spark is not strong and continuous, open the master switch and adjust the ignition electrode spark gap setting to the manufacturer recommendation. \ e. Make sure the ignition electrodes are clean. f. Close the master switch and observe the spark. 17

10.

11. 12.

13.

14.

15. 16. 17. 18.

19.

g. After a continuous spark is obtained, open the master switch and add a jumper on the subbase from terminal L1 power to the pilot terminal 8. Reconnect the leadwire from the pilot valve if it was disconnected in step b. h. Close the master switch to energize both the ignition transformer and the pilot valve. i. If the pilot does not ignite and if the ignition spark is still continuous, adjust the pressure regulator until a pilot is established. j. When the pilot ignites properly and stays ignited, open the master switch and remove the jumper(s) from the terminals of the subbase. k. Check for adequate bleeding of the fuel line. l. Reinstall the 7800 SERIES Relay Module on the subbase, close the master switch and return to step 4. When the pilot ignites, measure the flame signal. If the pilot flame signal is unsteady or approaching the 1.25 Vdc minimum value, adjust the pilot flame size or detector sighting to provide a maximum and steady flame signal. Recycle the system to recheck lightoff and pilot flame signal. When the MAIN LED turns on, make sure the automatic main fuel valve is open; then smoothly open the manual main fuel shutoff valve(s) and watch for main burner flame ignition. When the main burner flame is established, go to step 16. If the main burner flame is not established within five seconds or the normal lightoff time as specified by the equipment manufacturer, close the manual main fuel shutoff valve(s). Recycle the system to recheck the lightoff and pilot flame signal. Smoothly open the manual fuel shutoff valve(s) and try lightoff again. (The first re-attempt may have been required to purge the lines and bring sufficient fuel to the burner.) If the main burner flame is not established within five seconds or the normal lightoff time specified by the equipment manufacturer, close the manual main fuel shutoff valve(s). Check all burner adjustments. If the main burner flame is not established after two attempts: a. Check for improper pilot flame size. b. Check for excess combustion air at low fire. c. Check for adequate low fire fuel flow. d. Check for proper gas supply pressure. e. Check for proper valve operation. f. Check for proper pilot flame positioning. Repeat steps 8 and 9 to establish the main burner flame; then go to step 16. With the sequence in RUN, make burner adjustments for flame stability and Btu input rating. Shut down the system by opening the burner switch or by; lowering the setpoint of the operating controller. Restart the system by closing the burner switch and/or raising the setpoint of the operating controller. Observe that the pilot is established during PILOT IGN and the main burner flame is established during MAIN IGN within the normal lightoff time. Measure the flame signal. Continue to check for the proper signal through the RUN period. Check the signal at both High and Low Firing Rate positions and while modulating, if applicable.

66-1150 - 02

Page 18

RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES

20.

21. 22.

Run the burner through another sequence, observing the flame signal for: a. Pilot flame alone. b. Pilot and main flame together. c. Main flame alone (unless monitoring an intermittent pilot). Also, observe the time it takes to light the main flame. Ignition of main flame should be smooth. Make sure all readings are in the required ranges before proceeding. Return the system to normal operation.

NOTE: If there is no flame for 15 seconds, with the RUN/TEST Switch in the TEST position, the relay module locks out. 8. 9.

10.

NOTE: After completing these tests, open the master switch and remove all test jumpers from the subbase terminals, limits/controls or switches.

PILOT TURNDOWN TEST (ALL INSTALLATIONS USING A PILOT)

NOTE: This step requires two people, one to open the manual valve(s) and one to watch for ignition. 11.

Perform this test on all installations that use a pilot. The purpose of this test is to verify that the main burner can be lit by the smallest pilot flame that can hold in the flame amplifier and energize the FLAME LED. Clean the flame detector(s) to make sure that it detects the smallest acceptable pilot flame.

14.

NOTE: Low fuel pressure limits, if used, could be open. If so, bypass them with jumpers during this test.

4. 5.

6.

12. 13.

If using AMPLI-CHECK™ or self-checking amplifier and 1M ohm/volt meter, the flame signal fluctuates every time the amplifier does a self-check or a shutter check.

1. 2. 3.

Repeat step 7 to verify the pilot gas pressure reading at the exact point the FLAME LED goes out. Increase the pilot pressure immediately until the FLAME LED comes on, and then turn it down slowly to obtain a pressure reading just above the dropout point or until the flame signal increases to 1.25 Vdc. Set the Run/Test Switch in the RUN position (if used) and let the sequence proceed. When the MAIN LED turns on, make sure the automatic main fuel valve(s) opens; then smoothly open the manual main fuel shutoff valve(s) (or any other manually-opened safety shutoff valve(s), if used) and watch for main burner ignition. If the main burner flame is established, go to step 18.

Open the master switch. Close the manual main fuel shutoff valve(s). Connect a manometer (or pressure gauge) to measure pilot gas pressure during the turndown test. Open the manual pilot shutoff valve(s). Close the master switch and start the system with a call for heat. Raise the setpoint of the operating controller. The 7800 SERIES sequence should start, and PREPURGE, if applicable, should begin. After the PILOT LED turns on interrupted pilot applications, set the Run/Test Switch to the TEST position to stop the sequence. The FLAME LED comes on when the pilot ignites.

15.

16. 17. 18.

If the main burner flame is not established within five seconds, or within the normal lightoff time specified by the equipment manufacturer, close the manual main fuel shutoff valve(s) and open the master switch. If the lightoff is rough, the pilot flame size is too small. Close the master switch to recycle the burner and stop the sequence in the PILOT period by using the Run/Test Switch. Increase the pilot flame size by increasing its fuel flow until a smooth main flame is accomplished. Reposition the flame scanner sight tube or use orifices until the pilot flame signal voltage is in the range of 1.25 to 1.50 Vdc. When the main burner lights reliable with the pilot at turndown, disconnect the manometer (or pressure gauge) and turn up the pilot gas flow to that recommended by the equipment manufacturer. If used, remove the bypass jumpers from the subbase terminals, limits/controls, or switches. Run the system through another cycle to check for normal operation. Return the system to normal operation.

IGNITION INTERFERENCE TEST (ALL FLAME RODS)

NOTE: If the sequence does not stop, reset the system and make sure you set the Run/Test Switch to TEST within the first eight seconds of the PILOT IGN sequence.

Ignition interference can subtract from (decrease) or add to (increase) the flame signal. If it decreases the flame signal enough, it causes a safety shutdown. If it increases the flame signal, it could cause the FLAME LED to come on when the true flame signal is below the minimum acceptable value.

IMPORTANT You have 0.8 second or three seconds, depending on the PFEP selected, to position the Run/Test Switch to the TEST position to stop the sequence after the start of the PILOT IGN period.

Start the burner and measure the flame signal with both ignition and pilot (or main burner) on, and then with only the pilot (or main burner) on. Any significant difference (greater than 0.5 Vdc) indicates ignition interference.

7.

Turn down the pilot pressure very slowly, reading the manometer (or pressure gauge) as it drops. Stop instantly when the FLAME LED goes out. Note the pressure. The pilot is at the minimum turndown position. Immediately turn up the pilot pressure until the FLAME LED comes on again or the flame signal increases to 1.25 Vdc.

66-1150 - 02

18

To Eliminate Ignition Interference 1. 2. 3.

Make sure there is enough ground area. Be sure the ignition electrode and the flame rod are on opposite sides of the ground area. Check for correct spacing on the ignition electrode:

Page 19

RM7890A1056, RM7890B1048 7800 SERIES RELAY MODULES

4. 5. 6.

a. 6000V systems - 1/16 to 3/32 in. (1.6 to 2.4 mm). b. 10,000V systems - 1/8 in. (3.2 mm). Make sure the leadwires from the flame rod and ignition electrode are not too close together. Replace any deteriorated leadwires. If the problem cannot be eliminated, consider changing the system to an ultraviolet flame detection system.

5.

HOT REFRACTORY TESTS Hot Refractory Saturation Test (All Infrared Detectors) Start the burner and monitor the flame signal during the warm-up period. A decrease in signal strength as the refractory heats up indicates hot refractory saturation. If saturation is extreme, the flame signal drops below 1.25 Vdc and the system shuts down as though a flame failure occurred. If hot refractory saturation occurs, the condition must be corrected. Add an orifice plate in front of the cell to restrict the viewing area, lengthen the sight pipe, or decrease the pipe size (diameter). Continue adjustments until hot refractory saturation is eliminated.

2.

Infrared (lead sulfide) detectors can respond to infrared rays emitted by a hot refractory, even when the refractory has visibly ceased to glow. Infrared radiation from a hot refractory is steady, but radiation from a flame has a flickering characteristic. The infrared detection system responds only to flickering infrared radiation; it can reject a steady signal from hot refractory. The refractory steady signal can be made to fluctuate if it is reflected, bent or blocked by smoke or fuel mist within the combustion chamber. Be careful when applying an infrared system to verify its response to flame only. The ultraviolet detector can respond to hot refractory above 2300°F (1371°C).

3. 4.

IGNITION SPARK RESPONSE TEST (ALL ULTRAVIOLET DETECTORS) 1.

This condition can delay response to flame failure and also can prevent a system restart if hot refractory is detected.

2.

If the detector is sensing hot refractory, correct the condition by one or more of the following procedures: a. Add an orifice plate in front of the cell to restrict the viewing area of the detector. b. Resight the detector at a cooler, more distant part of the combustion chamber. Make sure the detector properly sights the flame. c. Try lengthening the sight pipe or decreasing the pipe size (diameter). For details, refer to the detector Instructions and the equipment Operating Manual. Continue adjustments until hot refractory hold-in is eliminated.

Test to make certain that the ignition spark is not actuating the FLAME LED:

Hot Refractory Hold-in Test (Rectifying Photocell, Infrared Detectors, Ultraviolet Detectors)

1.

NOTE: Some burners continue to purge oil lines between the valves and nozzles even though the fuel valves are closed. Terminating the firing cycle (instead of opening the master switch) allows purging the combustion chamber. This reduces a buildup of fuel vapors in the combustion chamber caused by oil line purging.

Operate the burner until the refractory reaches its maximum temperature (Infrared Only). If the installation has a multi-fuel burner, burn the heavier fuel that is most likely to reflect, bend or obscure the hot refractory steady infrared radiation. When the maximum refractory temperature is reached, close all manual fuel shutoff valves, or open the electrical circuits of all automatic fuel valves. Visually observe when the burner flame or FLAME LED goes out. If this takes more than three seconds, the infrared detector is sensing hot refractory. Immediately terminate the firing cycle. Lower the setpoint to the operating controller, or set the Fuel Selector Switch to OFF. Do not open the master switch.

19

3.

Close the pilot and main burner manual fuel shutoff valve(s). Start the burner and use the Run/Test Switch (if available) to stop the sequence in the PILOT IGN period. Ignition spark should occur, but the flame signal should not be more than 0.5 Vdc. If the flame signal is higher than 0.5 Vdc and the FLAME LED does come on, consult the equipment operating manual and resight the detector farther out from the spark, or away from possible refection. It may be necessary to construct a barrier to block the ignition spark from the detector view. Continue adjustments until the flame signal due to ignition spark is less than 0.5 Vdc.

NOTE: The Honeywell Q624A and Q652A,B Solid State Spark Generators prevent detection of ignition spark when properly applied with C7027, C7035,C7044 or C7061 Ultraviolet Flame Detectors. The Q624A and Q652B are only for use with gas pilots; the Q652A is only for oil applications.

Response to Other Ultraviolet Sources Some sources of artificial light (such as incandescent or fluorescent bulbs, mercury sodium vapor lamps and daylight) produce small amounts of ultraviolet radiation. Under certain conditions, an ultraviolet detector responds to these sources as if sensing a flame. To check for proper detector operation, check the Flame Failure Response Time (FFRT) and conduct Safety Shutdown Tests under all operating conditions.

66-1150 - 02