Page 1 of RM7890A1056, RM7890B1048 7800 SERIES Relay Modules Installation Instructions

Manual · Honeywell

RM7890A1056, RM7890B1048 7800 SERIES Relay Modules Installation Instructions

Manual28 pagesPDF 996 KB

Installation instructions for the Honeywell RM7890A1056 and RM7890B1048 7800 Series relay modules, burner controls with valve proving.

Download the PDF996 KB

Covers · 1 model

The models it covers

Summary

What is in it

Honeywell installation and checkout instructions for the RM7890A1056 and RM7890B1048 relay modules of the 7800 Series, microprocessor based burner controls for single burner on/off applications. They give specifications and approvals, location, subbase mounting and wiring rules, static checkout, setup of the Valve Proving System, sequence of operation, site-configurable jumpers, system checkout with flame signal, pilot turndown, ignition interference and hot refractory tests, safety shutdown tests, troubleshooting and valve proving test time calculations.

Its parts

  1. Application
  2. Specifications
  3. Installation
  4. Static Checkout
  5. Valve Proving System
  6. Principal Technical Features
  7. Operation
  8. Settings and Adjustments
  9. System Checkout
  10. Initial Lightoff Checks
  11. Pilot Turndown Test
  12. Ignition Interference Test
  13. Hot Refractory Tests
  14. Ignition Spark Response Test
  15. Safety Shutdown Tests

From the manual

Key facts from this manual

Each line names its page in the PDF.

Honeywell installation instructions (66-1150-02) for the RM7890A1056 and RM7890B1048 7800 SERIES relay modules, burner controls for single burner on/off applications with a valve proving system. It covers specifications, wiring, valve proving setup, configuration jumpers, the operating sequence, checkout tests and blink-code troubleshooting.

Read for this summary: pages 1 to 4, 14 to 15, 20 to 22 and 28 of 28.

Product type
Microprocessor based burner control for automatically fired single burner on/off use (gas only with valve proving); system is relay module, subbase and amplifier p. 1
Supply
120 Vac (+10/-15%), 50/60 Hz (±10%); 10W maximum dissipation p. 2
Connected load
2000 VA maximum total; fuse 15A maximum, type SC or equivalent, fast blow p. 2
Terminal ratings
Alarm (4) 120 Vac, 1A pilot duty; terminal 7 120 Vac, 8A run, 43A inrush; ignition (10) 120 Vac, 4.5A; flame sensor F(11) 60 to 220 Vac p. 4
Terminals
3 L1 supply, 6 burner controller and limits, 8 pilot valve/ignition, 9 main fuel valve 1, 16 valve proving switch, 17 MV2, 20 preignition interlock, 22 shutter (RM7890B) p. 4
Temperature
Operating -40°F to +140°F (-40°C to +60°C); storage -40°F to +150°F; 85% RH noncondensing; 0.5G vibration p. 2
Valve proving
Scheduled Never (default), Before, After, Both or Split; MV1 on terminal 9, MV2 on terminal 17 p. 1
Jumpers
JR1 PFEP 10 seconds (intact) or 4 seconds (clipped); JR2 relight (intact) or lockout; JR3 pilot valve intermittent (intact) or interrupted p. 15
Flame amplifier
Relight needs a 0.8 second FFRT amplifier; with a 3 second FFRT amplifier JR2 must be clipped p. 15
Flame amplifiers
7800 SERIES flame amplifiers R7824, R7847, R7848, R7849, R7851, R7861, R7886 p. 2
LEDs
POWER, PILOT, FLAME, MAIN and ALARM; the POWER LED blinks the fault code p. 14, 20
Display
S7800A1142 Keyboard Display Module (KDM), needed to set up the built-in features; remote mounting possible p. 1, 2
Subbase
Q7800A,B 22-terminal wiring subbase p. 2
Fault history
Six most recent lockouts kept in nonvolatile memory, with cycle, hour, fault code and burner status p. 21

What this manual walks you through

  • Mounting the wiring subbase p. 3
  • Wiring and routing leadwires p. 3
  • Wire sizes, grounding and terminal ratings p. 4
  • Choosing when valve proving runs p. 1
  • Clipping the site-configurable jumpers p. 15
  • Sequence of operation from initiate to run p. 14, 15
  • Checking the flame signal with a hot combustion chamber p. 20
  • Safety shutdown tests at the end of checkout p. 20
  • Reading blink fault codes and fixing the cause p. 20, 21, 22
  • Using diagnostic and history data on the KDM p. 21

Good to know

  • Valve timing assumes valve opening times of 13 seconds maximum; slower valves need a 1/4", 120 VAC bypass solenoid valve. p. 1
  • Clipping a site-configurable jumper after 200 hours of operation causes a hard lockout, code 110. p. 15
  • The relay module is not weather tight; outdoors it needs an approved weather-tight enclosure. p. 3
  • Two flame detectors may be wired in parallel, except C7915 infrared detectors and solid state C7927, C7952 and C7961. p. 2
  • A power-up reset does not clear a lockout; use the RESET pushbutton or a remote reset. p. 21

Questions this manual answers

How do I read the RM7890 blink fault code?

The POWER LED blinks fast for the tens and slow for the units: three fast and two slow blinks is fault code 32. Press RESET to clear it. p. 20, 21

Why does the RM7890 lock out with Fault 46?

A 3 second FFRT flame amplifier is fitted while jumper JR2 is still in place; JR2 must be clipped and removed. p. 15

What supply voltage does the RM7890 need?

120 Vac (+10/-15%), 50/60 Hz (±10%), with a total connected load of 2000 VA maximum. p. 2

How long can RM7890 wiring runs be?

Up to 300 feet to the terminal inputs, 1000 feet to a remote reset pushbutton and 4000 feet of Data ControlBus Module wire in total. p. 3

How many lockouts does the RM7890 remember?

The six most recent, each with the cycle, hour of operation, fault code, fault message and burner status. p. 21

Contents

Chapters and sections

Each line opens the PDF at its page.

  1. APPLICATION1
  2. Specifications2
  3. Installation2
    1. When Installing this Product...2
    2. Location3
    3. Mounting Wiring Subbase3
    4. Wiring3
    5. Final Wiring Check5
  4. Static Checkout5
    1. Equipment Recommended6
    2. General Instructions6
    3. Mounting RM7890 Relay Module8
    4. Mounting Other System Components (Fig. 4)8
    5. Mounting Other System Components (Fig. 4)9
  5. Valve Proving System10
    1. Valve Proving Function10
    2. Setup of Valve Proving Function11
  6. PRINCIPAL TECHNICAL FEATURES14
    1. Safety Shutdown (Lockout) Occurs if:14
  7. Operation14
    1. Sequence of Operation14
  8. SETTINGS AND ADJUSTMENTS15
    1. Selectable Site-Configurable Jumpers15
  9. System Checkout15
    1. Equipment Recommended16
    2. Checkout Summary16
    3. Preliminary Inspection16
    4. Flame Signal Measurement17
  10. Initial Lightoff Checks17
    1. Proved Pilot Systems17
  11. Pilot Turndown Test (All Installations Using a Pilot)18
  12. Ignition Interference Test (All Flame Rods)18
    1. To Eliminate Ignition Interference18
  13. Hot Refractory Tests19
    1. Hot Refractory Saturation Test (All Infrared Detectors)19
    2. Hot Refractory Hold-in Test (Rectifying Photocell, Infrared Detectors, Ultraviolet Detectors)19
  14. Ignition Spark Response Test (All Ultraviolet Detectors)19
    1. Response to Other Ultraviolet Sources19
    2. Flame Signal With Hot Combustion Chamber (All Installations)20
  15. Safety Shutdown Tests (All Installations)20
7 more lines, from page 20 on
  1. Troubleshooting20
    1. Diagnostic Information Index21
    2. Historical Information Index21
  2. Appendix A24
    1. Valve Proving Test24
    2. Calculation of Valve Train Volume24
    3. Calculation of Valve Proving Test Time24

From the PDF’s own bookmarks.

The whole text · 3 parts

Read the manual here as text

Its text as extracted from the PDF, unedited, in parts; each page opens the PDF at that page.

  1. Pages 1 to 101-10
  2. Pages 11 to 1911-19
  3. Pages 20 to 2820-28

The file

Revision and size

Revision66-1150-02
PublisherHoneywell
Pages28
PDF996 KB
TextText from the PDF itself; page 27 is a scan, read by OCR, which may hold reading errors.

The first pages · 3 of 28

Look before you download

Each page opens the PDF at that page.

Page 1
Page 1of 28
Page 2
Page 2of 28
Page 3
Page 3of 28