Manual · Honeywell
RM7890A1056, RM7890B1048 7800 SERIES Relay Modules Installation Instructions
Manual28 pagesPDF 996 KB
Installation instructions for the Honeywell RM7890A1056 and RM7890B1048 7800 Series relay modules, burner controls with valve proving.
Covers · 1 model
The models it covers
Summary
What is in it
Honeywell installation and checkout instructions for the RM7890A1056 and RM7890B1048 relay modules of the 7800 Series, microprocessor based burner controls for single burner on/off applications. They give specifications and approvals, location, subbase mounting and wiring rules, static checkout, setup of the Valve Proving System, sequence of operation, site-configurable jumpers, system checkout with flame signal, pilot turndown, ignition interference and hot refractory tests, safety shutdown tests, troubleshooting and valve proving test time calculations.
Its parts
- Application
- Specifications
- Installation
- Static Checkout
- Valve Proving System
- Principal Technical Features
- Operation
- Settings and Adjustments
- System Checkout
- Initial Lightoff Checks
- Pilot Turndown Test
- Ignition Interference Test
- Hot Refractory Tests
- Ignition Spark Response Test
- Safety Shutdown Tests
From the manual
Key facts from this manual
Each line names its page in the PDF.
Honeywell installation instructions (66-1150-02) for the RM7890A1056 and RM7890B1048 7800 SERIES relay modules, burner controls for single burner on/off applications with a valve proving system. It covers specifications, wiring, valve proving setup, configuration jumpers, the operating sequence, checkout tests and blink-code troubleshooting.
- Product type
- Microprocessor based burner control for automatically fired single burner on/off use (gas only with valve proving); system is relay module, subbase and amplifier p. 1
- Supply
- 120 Vac (+10/-15%), 50/60 Hz (±10%); 10W maximum dissipation p. 2
- Connected load
- 2000 VA maximum total; fuse 15A maximum, type SC or equivalent, fast blow p. 2
- Terminal ratings
- Alarm (4) 120 Vac, 1A pilot duty; terminal 7 120 Vac, 8A run, 43A inrush; ignition (10) 120 Vac, 4.5A; flame sensor F(11) 60 to 220 Vac p. 4
- Terminals
- 3 L1 supply, 6 burner controller and limits, 8 pilot valve/ignition, 9 main fuel valve 1, 16 valve proving switch, 17 MV2, 20 preignition interlock, 22 shutter (RM7890B) p. 4
- Temperature
- Operating -40°F to +140°F (-40°C to +60°C); storage -40°F to +150°F; 85% RH noncondensing; 0.5G vibration p. 2
- Valve proving
- Scheduled Never (default), Before, After, Both or Split; MV1 on terminal 9, MV2 on terminal 17 p. 1
- Jumpers
- JR1 PFEP 10 seconds (intact) or 4 seconds (clipped); JR2 relight (intact) or lockout; JR3 pilot valve intermittent (intact) or interrupted p. 15
- Flame amplifier
- Relight needs a 0.8 second FFRT amplifier; with a 3 second FFRT amplifier JR2 must be clipped p. 15
- Flame amplifiers
- 7800 SERIES flame amplifiers R7824, R7847, R7848, R7849, R7851, R7861, R7886 p. 2
- LEDs
- POWER, PILOT, FLAME, MAIN and ALARM; the POWER LED blinks the fault code p. 14, 20
- Display
- S7800A1142 Keyboard Display Module (KDM), needed to set up the built-in features; remote mounting possible p. 1, 2
- Subbase
- Q7800A,B 22-terminal wiring subbase p. 2
- Fault history
- Six most recent lockouts kept in nonvolatile memory, with cycle, hour, fault code and burner status p. 21
What this manual walks you through
- Mounting the wiring subbase p. 3
- Wiring and routing leadwires p. 3
- Wire sizes, grounding and terminal ratings p. 4
- Choosing when valve proving runs p. 1
- Clipping the site-configurable jumpers p. 15
- Sequence of operation from initiate to run p. 14, 15
- Checking the flame signal with a hot combustion chamber p. 20
- Safety shutdown tests at the end of checkout p. 20
- Reading blink fault codes and fixing the cause p. 20, 21, 22
- Using diagnostic and history data on the KDM p. 21
Good to know
- Valve timing assumes valve opening times of 13 seconds maximum; slower valves need a 1/4", 120 VAC bypass solenoid valve. p. 1
- Clipping a site-configurable jumper after 200 hours of operation causes a hard lockout, code 110. p. 15
- The relay module is not weather tight; outdoors it needs an approved weather-tight enclosure. p. 3
- Two flame detectors may be wired in parallel, except C7915 infrared detectors and solid state C7927, C7952 and C7961. p. 2
- A power-up reset does not clear a lockout; use the RESET pushbutton or a remote reset. p. 21
Questions this manual answers
How do I read the RM7890 blink fault code?
The POWER LED blinks fast for the tens and slow for the units: three fast and two slow blinks is fault code 32. Press RESET to clear it. p. 20, 21
Why does the RM7890 lock out with Fault 46?
A 3 second FFRT flame amplifier is fitted while jumper JR2 is still in place; JR2 must be clipped and removed. p. 15
What supply voltage does the RM7890 need?
120 Vac (+10/-15%), 50/60 Hz (±10%), with a total connected load of 2000 VA maximum. p. 2
How long can RM7890 wiring runs be?
Up to 300 feet to the terminal inputs, 1000 feet to a remote reset pushbutton and 4000 feet of Data ControlBus Module wire in total. p. 3
How many lockouts does the RM7890 remember?
The six most recent, each with the cycle, hour of operation, fault code, fault message and burner status. p. 21
Contents
Chapters and sections
Each line opens the PDF at its page.
- APPLICATION1
- Specifications2
- Installation2
- Static Checkout5
- Valve Proving System10
- PRINCIPAL TECHNICAL FEATURES14
- Operation14
- SETTINGS AND ADJUSTMENTS15
- System Checkout15
- Initial Lightoff Checks17
- Pilot Turndown Test (All Installations Using a Pilot)18
- Ignition Interference Test (All Flame Rods)18
- Hot Refractory Tests19
- Ignition Spark Response Test (All Ultraviolet Detectors)19
- Safety Shutdown Tests (All Installations)20