The text of a manual · part 1 of 5
Electronic Metering Pumps Instruction Manual, pages 1 to 9
Pages 1 to 9 of 44
The original document is the PDF (2.2 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
Filed in the catalog under the LMI AA751
Page 1
___ Instruction Manual
Electronic Metering Pumps
Carefully read and understand all precautions before installing or servicing any metering pump. CAUTION CAUTION
!
!
For file reference, please record the following data: Model No: Serial No: Installation Date: Installation Location: When ordering replacement parts for your LMI Metering Pump or Accessory, please include complete Model Number and Serial Number of your unit.
201 Ivyland Road Ivyland, PA 18974 TEL: (215) 293-0401 FAX: (215) 293-0445 www.lmipumps.com
Replaces same of Rev. Q 7/09 1 1615.R 7/2010
Page 2
2
Page 3
Contents 1.0 Introduction.......................................................................................... 4 1.1 Spare Parts............................................................................... 4 2.0 Unpacking Check List ......................................................................... 6 3.0 Pre-Installation Instructions................................................................. 8 4.0 Installation......................................................................................... 10 4.1 Pump Location and Installation.............................................. 10 4.2 Pump Mounting...................................................................... 10 4.3 Tubing Connections. .............................................................. 15 4.4 Multi-Function Valves............................................................. 16 4.5 4-Function Valve Installation. ................................................. 18 4.6 AutoPrime Liquid End. ........................................................... 19 4.7 Foot Valve/Suction Tubing Installation.................................... 20 4.8 Injection Check Valve and Discharge Tubing Installation....... 21 5.0 Liquid End Parts List . ....................................................................... 22 6.0 Start-Up and Adjustment................................................................... 23 6.1 Output Adjustment Controls................................................... 23 6.2 Start-Up/Priming for Pump Supplied with Multi-Function Valve............................................................... 24 6.3 Start-Up/Priming without Multi-Function Valve....................... 25 6.4 Output Adjustment................................................................. 26 6.5 Total Pump Output ................................................................ 26 7.0 Methods of External Triggering or Pacing
B7, C7 and P7 Pumps.................................................................. 28, 29 8.0 Calibration. ........................................................................................ 30 8.1 Pressure Control.................................................................... 31 8.2 Calibration Procedure - On-Site Volumetric Calibration in External Mode................................ 32 9.0 Spare Parts Replacement/Routine Maintenance. ............................. 32 9.1 Depressurizing the Discharge Line (For Pumps Equipped with a 3-FV or a 4-FV Only). .............. 32 9.2 Liquifram™ (Diaphragm) Replacement................................... 33 9.3 Cartridge Valves, Seal Rings/Valve Balls and Injection Check Valve Spring Replacement.......................................... 36 10.0 Checking Pump for Proper Zero Position (Stroke Knob).................... 37 10.1 Type I: Push-on Knob............................................................. 37 11.0 Troubleshooting................................................................................. 40 12.0 EPU Resistance Chart. .......................................................Back Cover
3
Page 4
1.0
Introduction LMI is the world’s most versatile manufacturer of economical and efficient metering pumps. This manual addresses the installation, maintenance and troubleshooting procedures for manually and externally controlled pumps. LMI has a worldwide network of stocking representatives and authorized repair centers to give you prompt and efficient service. Please review this manual carefully. Pay particular attention to warnings and precautions. Always follow good safety procedures, including the use of proper clothing, eye and face protection. This manual is for Series AA, B, C, E, J5, and P pumps.
1.1
Spare Parts LMI recommends replacing the elastomeric components of the pump on an annual basis. RPM Pro Pacs™ and spare part kits are available from your local LMI Master Stocking Distributor.
4
Page 5
Example: Your pump consists of two main components: 1. The Drive Assembly; and 2. The Liquid Handling Assembly.
P151 Drive
392SI
-
Liquid Handling Assembly
+
5
Page 6
2.0
Unpacking Check List Your carton will contain many or all of the following items. Please notify the carrier immediately if there are any signs of damage to the pump or its parts. Please refer to the enclosed Instruction Supplement for an illustration and electrical diagram of your complete pump.
Metering Pump Foot Valve
Ceramic Foot Valve Weight
Tubing
Depending on the model, your carton may contain 0, 1, 2 or 3 rolls of tubing. Your carton may contain a roll of vinyl tubing: DO NOT USE ON PRESSURIZED LINES. The vinyl tubing is for connection to the SUCTION SIDE OF THE PUMP HEAD OR THE 3 OR 4 FUNCTION VALVE RETURN LINE ONLY.
6
Tubing Connection Hardware
Page 7
Instruction Supplement
LMI
MILTONROY
Injection Check Valve
Instruction Supplement
Optional Milliamp Input Cable
Optional 4-Function Valve (pictured) or Optional 3-Function Valve
7
Page 8
3.0
Pre-Installation Instructions The following precautions should be taken when working with LMI metering pumps. Please read this section carefully prior to installation.
Precautions
!
CAUTION
!
CAUTION
!
CAUTION
8
Protective Clothing ALWAYS wear protective clothing, face shield, safety glasses and gloves when working on or near your metering pump. Additional precautions should be taken depending on the solution being pumped. Refer to MSDS precautions from your solution supplier.
Water Pre-Prime All LMI pumps are pre-primed with water when shipped from the factory. If your solution is not compatible with water, disassemble the Pump Head Assembly. Thoroughly dry the pump head, valves, seal rings, balls and Liquifram™ (diaphragm). Reassemble head assembly tightening screws in a crisscross pattern. Refill the pump head with the solution to be pumped before priming the pump. (This will aid in priming.)
Solution Compatibility Determine if the materials of construction included in the liquid handling portion of your pump are adequate for the solution (chemical) to be pumped. LMI pumps are tested by NSF for use on muriatic acid (up to 37% hydrochloric acid), and sodium hypochlorite (up to 12.5% solution). Always refer to the solution supplier and the LMI Chemical Resistance Chart for compatibility of your specific LMI metering pump. Contact your local LMI distributor for further information.
Page 9
!
CAUTION
!
CAUTION
Tubing Connections Inlet and outlet tubing or pipe sizes must not be reduced. Make certain that all tubing is SECURELY ATTACHED to fittings prior to start-up (see Section 4.3, Tubing Connections). ALWAYS use LMI supplied tubing with your pump, as the tubing is specifically designed for use with the pump fittings. It is recommended that all tubing be shielded to prevent possible injury in case of rupture or accidental damage. If tubing is exposed to sunlight, black UV resistant tubing should be installed. Check tubing frequently for cracks and replace as necessary.
Fittings And Machine Threads All fittings should be hand-tightened. An additional 1/8 - 1/4 turn after the fitting contacts the seal ring may be necessary to provide a leak-proof seal. Excessive overtightening or use of a pipe wrench can cause damage to the fittings, seals, or pump head. All LMI pumps have straight screw machine threads on the head and fittings and are sealed by the seal rings or O-rings. DO NOT use Teflon® tape or pipe dope to seal threads. Teflon® Tape may only be used on the 1/2" NPT thread side of the Injection Check Valve as well as stainless steel liquid end connections.
!
CAUTION
!
CAUTION
Plumbing Always adhere to your local plumbing codes and requirements. Be sure installation does not constitute a cross connection. Check local plumbing codes for guidelines. LMI is not responsible for improper installations.
Back Pressure/Anti-Syphon Valve If you are pumping downhill or into low or no system pressure, a back pressure/anti-syphon device such as LMI’s Four Function Valve should be installed to prevent overpumping or syphoning. Contact your LMI distributor for furthur information.
9