The text of a manual · part 6 of 7

type A0J2 (CPU) User's Manual, pages 39 to 43

Pages 39 to 43 of 46: 6. TEST OPERAITON AND ADJUSTMENTS; 7. MAINTENANCE AND INSPECTION

The original document is the PDF (1.6 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the Mitsubishi A0J2CPU

Page 39 read from a scan by OCR; it may hold reading errors

6. TEST RUN AND ADJUSTMENTS MELSEC-AA

6. TEST OPERATION AND ADJUSTMENTS

This chapter explains the procedures to be performed before, during, and after the test operation.

6.1 Check Points Before Start of Test Opetation

This section explains the points to be checked prior to the test operation of AQJ2CPU programmable controller.

Item Check Point Description

(1) Check whether the connector for battery lead wires, Loading of battery which has been disconnected before shipment, is securely 1 (Inside the inserted in the pin connector on the printed circuit board. memory cassette) (2) Check that the voltage of battery has not dropped. (Nominal value: 3.6V)

(1) Check that the AQJ2CPU unit, I/O unit, and extension

Connection of | base connectors are properly connected with the cabie

2 vo we connectors. Are they locked securely? (2) Check that the cable connector positions are proper. vO unit or (1) Make sure that the setting has been performed. 3 extension base

: (2) Check if the same number has been set. stage setting

(1) Check the cables connected to each terminal of the ter-

Connection of minal block. 4 power and (2)Check the terminal screws of terminal block for the 1/0 cables power supply unit and terminal! block for !/O unit.

(3) Check the cable size.

Table 6.1 Check Points

6-1

IB (NA) 66058-A

Page 40 read from a scan by OCR; it may hold reading errors

6. TEST RUN AND ADJUSTMENTS /MELSEC-A

6.2 Test Operation and Adjusting Procedure

This section shows the flow chart from after the completion of installation to the test operation of AOJ2CPU programmable controller.

(stat +) T_

Power-on |

. Check the input line voltage.

. Check the line voltage for I/O equipment.

. Move RUN key switch on CPU unit to the “STOP” position.

. Turn on the power.

. Check the “POWER” LED on power supply . unit turns on.

Programming |

Write the sequence program created using AGGPP to the CPU or.create a program with A7PU.

!

Checking of external output wiring | oe WN

Check the external output wiring using the forced output function in the “TEST” mode of programming unit,

Checking of external input equipment wiring |

Check the input equipment wiring in the ‘““MONI- TOR” mode of programming unit.

Test operation |

1. Move the RUN key switch on the CPU unit to the RUN position. 2. Check that “RUN” LED is lit.

t

Check sequence operation.

t

Make corrections if the sequence program has errors,

1. Write the program to cassette tape, ROM, or floppy disk. 2. Print the ladder diagram and list using the printer. < Completed +)

Sequence check

Program correction |

Program protection |

IB (NA) 66058-A

Page 41 read from a scan by OCR; it may hold reading errors

7. MAINTENANCE AND INSPECTION

MELSEC-A

7. MAINTENANCE AND INSPECTION

7.1 Daily Inspection

This chapter describes items for daily and periodic maintenance and inspection in order to maintain the AQJ2CPU programmable controller in the normal and best conditions.

Table 7.1 shows the inspection items which are to be checked daily.

Number Check Item Check Point Judgement Corrective Action Base unit Check for loose | The base unit 1 mounting mounting screws | should be secure- | Retighten screws. conditions and cover. ly mounted. The hook should Mounting ‘Check if the unit | be securely en- 2 conditions of is disengaged or | gaged and the | Securely engage 1/0 unit, etc the hook is se- | unit should be | the hook. os curely engaged. positively mount- ed. Check for loose | Screws should | Retighten termi-terminal screws. not be joose. nal screws. . . Proper clearance Connecting Check distances . 3 conditions between solder- should be pro vic: Correct. less terminals, derless terminals. Check connec- | Connectors Retighten con- tors of extension | should not be | nector mounting cable. loose, screws. “POWER"| Check that the | (r+ indicates an LED LED is on. error.) On Check that the i : “RUN” . : (Off or flashing LED LED is on during indicates an er- . ror.) On when input Main ; is on. Off when | Refer to Trouble . input is off, shooting Section cator LED and off is not as men- | Programming lamps . tioned above, | Manual. indicates an er- ror.) Qn when output is on. Off when output is off. Output peck ina the (Display, which LED and off is not as men- : . tioned above, indicates an er- ror.) Table 7.1 Daily Inspection 7-1

IB (NA) 66058-A

Page 42 read from a scan by OCR; it may hold reading errors

7. MAINTENANCE AND INSPECTION

MELSEC-AA

7.2 Periodic Inspection

This section explains the inspection items which are to be checked every six months to one year. If the equipment have been moved or modified or wiring has been changed, also make the inspection.

Number Check Item Check Method Judgement Corrective Action Ambient tempera- Oto 55°C ture . When PC is used Amb- Measure a ith inside a panel, ent Ambient the temperature 1 environ-| humidity aoe ete 10 to 90%RH in the panel is ment sive gas ambient temper- gas. There should be | ature. Ambience no corrosive gas- es. Measure voltage 85 to 132V AC Change supply 2 Line voltage check | across 100/200V -|--- - ------- power. Change monitor mode of A7PU or A6GPP.

maintenance

AC terminal. 170 to 264V AC | transformer tap. . Retighten screws. Looseness be ° hounted ee For CPU, 1/0, ‘| Move the unit. . and power sup- play curely and posi- ply units check reel t: tively. all connections. 3 . : condi- tions | Ingress of There should be dust or : : jer Remove and : Visual check. eign material, in foreign sae clean. material the vicinity of the P.c. Loose terminal Retighten. screws Con- necting| ,,. Proper clearance 4 condi- Distances should be pro- tions solderless Visual check. vided between | Correct. terminals solderiess ter- minals, Loose Connectors Retighten con- connector Visual check. should not be | nector mounting loose. screws. if battery capac- Ensure that ity reduction 1S . . . not indicated, 5 Battery M9006 is off in Preventive change the battery when speci- fied service life is exceeded.

Table 7.2 Periodic Inspection

7-2

IB (NA} 66058-B

Page 43 read from a scan by OCR; it may hold reading errors

_ 7. MAINTENANCE AND INSPECTION

MELSEC-AA

7.3 Battery Replacement

When the voltage of the backup battery for programs and power failure compensation function drops below the predetermined level, M9006 turns on. The contents of the programs and the latched data are not lost immediately after this special relay turns on (i.e. the contents are kept within 168 hours.). The contents may be lost if you overlook the turning on of the special relay. Therefore, it is recommended to change the battery as soon as possible as the preventive maintenance.

7.4 Battery Replacing Procedure

Replace the battery according to the following procedure when the battery life has expired. The memory is backed up for some time by the capacitor after removing the battery. Change the battery within five minutes. The contents of the memory may be lost if the five minutes period is exceeded. Therefore, replace the battery as soon as possible. (Battery Replacement )

Turn off PC power.

Open the AQJ2CPU cover.

Take out the old battery from the battery holder (after removing the cord from the cord holder).

Within 5 minutes

Place the new battery into the holder in proper direction and connect the lead connector to the connector. (Press the cord with the cord holder.)

Close the AOJ2CPU cover.

Turn on PC power.

L

Monitor M9006 to check ON/OFF. OFF

ON

L

Battery is defective.

' | ; C Completed »)

IB (NA) 66058-C