Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeContact

The text of a manual · part 8 of 12

Model ES100 Process Controller ESTOOLS Software Programming Manual and Application Road Map, pages 71 to 80

Pages 71 to 80 of 114

The original document is the PDF (2.0 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

Filed in the catalog under the Omron ES100X-AAWH01FE

Page 71 read from a scan by OCR; it may hold reading errors

Setting Manipulated Variable for Process Completion Section 3-3

3-3-2 When Continued Control Output is Desired

If appropriate for your process, you can configure the ES100 to maintain a heating or cooling output after the process has completed. The procedures are the same for dead band and overlap band control processing.

Note: If you wish to maintain a fixed set point at operation stop, refer to Fixed Set Point in your ES100 operations manual (HO69 and HO70).

1. From the Setting menu <Offline>select the button. The Analog operation assignment menu appears.

2. From the Analog operation assignment menu, select F1:Details | (Figure 26). This will bring you to a selection of three options.

Fo Analog operation assignment KO F1:Details| | || F3: Image || F4:Edit ||Fo:option]| F1a:Help || esc:Exit | 1 2 3 4 5 6 mas m1 AAT = omn

Assign dest

Set Analog Operation Details = N14 Oper i

N14 Arg 1 Isc. (straight-line approximation)

Ni4 Arg 2 FNC (broken - line approximation)

[N45 Oper AP1 to APS2Z Canalog operation parameters)

[N15 arg 1

NiS arg 2 a]

Figure 26

3. Select AP1 to AP32 (Analog Operation Parameters). Using the arrow keys, scroll down to Anlog oper param 31 | ang select it (Figure 27).

Fo f fmalog operation parameters ‘O

| || || || | |ro:option|| F1a:Help || Esc:Exit }

Set by number key.

laniog oper param 27 > 6.666 lanlog oper param 28 » 6.466 laniog oper param 29 » 6.666 lanlog oper param 36 » 6.660 laniog oper param 31 » 6.588 BY laniog oper param 32 > 6.666 || ¥ Figure 27

If you want to maintain some cooling action after the process is complete, set AP 31 from 0.000 to 0.500. At zero the cooling action will be 100%, at 50% the cooling action will be off. The action declines in a linear fashion from 0 to

50%.

66

Downloaded from www.Manualslib.com manuals search engine

Page 72 read from a scan by OCR; it may hold reading errors

Autotuning

Section 3-4

3-4 Autotuning

If you want to maintain some heating action after the process is complete, set AP 31 from 0.500 to 1.000. The action increases in a linear fashion from 50% to 100%. Depending on the size of your overlap band, you may have both heating and cooling action on at the same time (Figure 28).

A A 100% Overlap Band

A02 A011

Cooling ' Heating

Output | ' Output

> MV 0% 50% 100% Figure 28

By following these procedures, you have completed the basic programming requirements of the ES100 for a Heat/Cool Control Method. To tune your control loop, please refer to Autotuning.

Autotuning can be used with all Heat/Cool Control strategies. The autotune feature uses a method of tuning similar to a limit cycle, which is described in Section 1, Cascade Control. When autotuning is activated it will be indicated by a blinking yellow LED on the front panel of the ES100.

1. From the ES/TOOLS menu, select the Check Control icon. 2. Select from the Check control menu (Figure 29).

Fe f Check control KM F1:Run q F2:Paran | [ra:status | Fa :Connand] [F9:0ption | | ESC: Exit | 68/26/94 758.48 Monitor rend Setting J/SP PU 74.63 mv 100.08 Exec A.T. | PY 2 Second Clear + draw Change SP ] - 6:82:08 6:46:08 4:16:08 Figure 29

67

Downloaded from www.Manualslib.com manuals search engine

Page 73 read from a scan by OCR; it may hold reading errors

Autotuning Section 3-4

3. Select from the new vertical menu on the left side of the screen

(Figure 30)., _ - - - - - - - - - ., Check control Unit No.88 lal [ Fi:run || F2:Param |[F3:status | F4:Conmanal |F9:opt ion] | |[esc:exit | ees

16:86:55 Monitor : Py 58.48 Hola | Py 2 Second Draw mode (Clear + draw -5e 2:62:08 0:86:08 0:10:00 Figure 30

4. Select to return to the Check control menu.

5. From the vertical menu on the left side of the screen, select [Exec AT. |

6. Anew pop-up window will appear (Figure 31). Enter the number of the PID bank you wish to Autotune.

Et Check control Unit No.a@ KM | Fi:Run || F2:Param | |F3:status | F4:Conmandl [Fo :option| | || ESC : Exit | Clear data mecca 188

Move point Monitor tr rend Setting SP

PY 78 Trend mode ad 48) [PID set vo. > 2 Exec A.T. [Esc :Cance! }| ENT :OK | Interva 2 Second

Draw mode

Clear + draw

Change SP

OEEEEEREEE

6:62:68 4:66:68 6:16:08

Figure 31

7. Select [ENT: OK }. The controller will now autotune. Do Not interrupt or stop this process. The controller will have completed autotuning when the yellow ‘AT’ light stops blinking on the front panel of the ES100.

3-4-1 Fuzzy Logic Fine Tuning Start controlling your process with the ES100 by placing it in the RUN mode. 1. From the ES/TOOLS menu, select the Check control icon.

2. From the Check control menu, select [F1:Run } 3. From the vertical menu on the left side of the screen, select

68

Downloaded from www.Manualslib.com manuals search engine

Page 74 read from a scan by OCR; it may hold reading errors

Autotuning Section 3-4

If the performance of the controller is not satisfactory after autotuning, you may improve the performance of the ES100 by using the Fuzzy Logic Fine Tune. Follow these steps to get to the Fine Tune portion of the ES/TOOLS program.

1. From the ES/TOOLS Menu select the Check control icon.

2. Select from the menu on the left side of the screen (Figure 32).

EA Check control Ik

Fi:Run || F2:Paran | |F3:status | Fa :Commanal [F9:opt ion | | || ESC : Exit |

68/29/94 750.8 16:68:33

Clear data

Move point Monitor rend Setting 9/SP 168.68

Py 75.84 Trend mode MU 8.88 Exec A.T. - - - - - - - - - - pu Interval 2 Second

Draw mode

Clear + draw

Change SP

CEEEEE REE

6:62:68 6:66:60 6:16:66

Figure 32

A Pop-Up window will appear to confirm the PID set that you are using.

Enter the appropriate PID set number and select (ENT: OK] a new pop-up window will appear Figure 33.

Clear + draw Change SP

Check control ia | Fi:Run | | F2:Paran ||Fa:status | F4:Commanal [F9:0ption || || ESC : Exit ] a ah f é - T va Clear data ic te. F.T. required level setting Overshoot Moni rend Setting ISP Py me Exec A.T. | Rspons lunting 2 Se Draw ||ESC:Cance1| | ENT:0x |

6:62:66 6:66:66 6:16:68

Figure 33

69

Downloaded from www.Manualslib.com manuals search engine

Page 75 read from a scan by OCR; it may hold reading errors

Autotuning

Section 3-4

You

70

Downloaded from www.Manualslib.com manuals search engine

There are five different levels of response that you can initiate using Fuzzy Logic Fine Tuning. Each triangle represents one level of strength. The more triangles you select the greater the reaction will be from the Fine Tuning effect of Fuzzy Logic. You can select one parameter (as is shown) or a maximum of two parameters, such as Response/Hunting, or Overshoot/Hunting. Use the keyboard cursor controls to move the red inner circle around the inside of the outer circle. The arrowheads will automatically fill in based on the position of the red circle.

Select ENT OK | after you have selected the level of corrective action you require.

ES/TOOLS will prompt you to execute fine tuning, select LENT:OK | Re. peat Fuzzy Logic Fine Tuning as necessary to achieve optimum performance.

have now completed tuning your ES100 for Heat/Cool Control.

Page 76 read from a scan by OCR; it may hold reading errors

Applications Section 3-5

3-5 Applications

3-5-1 Culture Chamber ES100 used: ES100X-AAWHFE

Distributed Control System

Bank selection Event

ES100X Al2 Humidity A01 A02 Cold water Temperature Hot water [ | Alt

Culture chamber

Process Requirements

1. Temperature and humidity must be very consistant and at the precise levels.

2. Separate outputs for heating and cooling.

Heat/cool should be performed by one controller, not two.

4. Needs to have control information about more than one type of product for quick changeover (while minimizing thr requirement for frequent autotuning that can cause product damage).

Model Selection

1. The ES100 controlled more steadily and accurately with Fuzzy Logic, insuring a high return.

2. Heat/cool is accomplished with ES100 with separate outputs.

3. With the eight banks of PID in the ES100X series setpoints, PID setting could be stored making changeover easier while eliminating the need to autotune each time.

o

71

Downloaded from www.Manualslib.com manuals search engine

Page 77 read from a scan by OCR; it may hold reading errors

Applications Section 3-5

3-5-2 Shampoo Manufacturing Machine ES100 used: ES100P-AAHFE

Digital /O ~- - - - , Recorder ansfer output - 5-5 ee > Material An ro! Water ! ! ! O Ao2' . AOt <<] ! Sy Steam a ae any Cooling water Xx Temp. program Application

1. The controller must have the ability to store several different pattern profiles.

2. Mixing speed will be different in almost every step. 3. Achart recorder will be used to provide a temperature history. 4. Must provide heat/cool capability

Model Selection

1. The ES100P series provides up to 99 different program profiles.

2. It is possible to use a combination of internal timers and outputs to provide different mixing speeds.

3. The transfer output was connected directly to the chart recorder. 4. Even the ramp/soak ES100 can perform heat/cool control.

72

Downloaded from www.Manualslib.com manuals search engine

Page 78 read from a scan by OCR; it may hold reading errors

Applications Section 3-5

3-5-3 Drying Machine ES100 used: ES100P-AAHO1FE

Alt

A02

A01

ES100P

Host computer

Communications link

'_» Dye insertion DOo2 Water supply

Dye emission

DO3

Process Requirements

1. The controller must be able to store different profiles.

2. Temperature must rise slowly to insure proper finish correct/even coloring. 3. Use a host computer to control the ES100.

Model Selection 1. The ES100P provides 99 different program profiles.

2. The ES100P is capable of having a rise time measured in seconds or in hours.

3. By using ESTOOLS, the customer was able to select the correct pattern and monitor the process as well.

73

Downloaded from www.Manualslib.com manuals search engine

Page 79 read from a scan by OCR; it may hold reading errors

Applications

Section 3-5

3-5-4 Water Purifying Machine

ES100 used: ES100X-AAH pH sensor

Reaction tank

Process Requirements

Output unit E53-C3 (2 pcs.)

, 420mA

Acid

Alkali

1. Control pH of water purifying machine to national standards. 2. Control pH by using 2 valves with a 4-20 mA signal. Model Selection

1. The ES100 provided control of the process so that the national standards were achieved easily.

2. Heat/cool control was used because the output signal was 4-20 mA.

74

Downloaded from www.Manualslib.com manuals search engine

Page 80 read from a scan by OCR; it may hold reading errors

SECTION 4 Ratio Control

4-1 Whatis Ratio Control ... 76 4-2 Start-Up Procedure ... 77 4-2-1 WIYING ... 77 4-3 Operation and Tuning ... 77 4-4 Autotuning ... 82 4-4-1 Fuzzy Logic Fine Tuning ...............0 00 cece eee 83 4-5 Applications ... 86 4-5-1 Heating Furnace ... 86 4-5-2 Seat Belt Manufacturing ... 87

75

Downloaded from www.Manualslib.com manuals search engine