Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeContact

The text of a manual · part 3 of 8

SIMATIC EM 300 Motor Starters Manual, pages 21 to 30

Pages 21 to 30 of 74

The original document is the PDF (917 KB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the Siemens EM-300-RS

Page 21

Wiring

2.3.2

Wiring the Power Connectors

Pinout The diagram and the table below indicate the pinout of the power connector and the two power sockets on a motor starter with a 24 V DC braking contact.

2

1

6

7

7

4

5

4

Pinout

6

3

5

1

8

8

2

3

3

2

1

5 8

4 6

7

Plug X1

Socket X2

Connecting load supply voltage

Connecting load with brake

Looping through load supply voltage and brake voltage

1, Phase 1, 2

Phase 2, Phase 2

3, Phase 3, 4

GND

GND

+ 24 V DC

5

+ 24 V DC

+

GND

6

Phase 1, Phase 3

7, Phase 2, 8

Phase 3, Phase 1 e

PE

PE

PE

SIMATIC - EM 300 Motor Starters GWA-4NEB 640070302-05

Socket X3

2-9

Page 22

Wiring

Power connectors The power connectors of a motor starter EM 300 with a 24 V DC braking contact consist of the following components: Power socket • for connecting load supply voltage

Power connector • for connecting the load with a brake • for looping through the load supply voltage and the braking voltage connector shell connector shell jacks contact pins socket insert pin insert

Installing and wiring power connectors Install the power connectors of a motor starter with a 24 V DC braking contact as follows. Please note the wiring rules described in Chapter 2.1 Step

Procedure Socket for X2

Connector for X2

Connector for X3

1

Feed the cable through the gland, the appropriately-sized sealing ring supplied and the connector shell.

2

Fasten the jacks to the cores

Fasten the contact pins to the cores

• • •

• • • for phases 1 to 3 for the brake for PE for phases 1 to 3 for the brake for PE

3

Press the jacks into the socket insert until they snap into place.

Press the contact pins into the pin insert until they snap into place.

4

Withdraw the cable sufficiently to be able to screw the socket or pin insert tightly inside the connector shell with the enclosed screws.

5

Screw the gland tight.

SIMATIC - EM 300 Motor Starters

2-10

GWA-4NEB 640070302-05

Page 23

Wiring

2.3.3

Electrical Design

Suggested circuit The following diagram suggests one way of controlling the motor with a 24 V DC brake via an electronic compact starter EM 300 EDS/ERS.

L1 L2 L3 K1

+24 V DC M

A1

A2

Galvanic isolation

6

2

8

X3 8 2 6

1

7

3

4

X1 4

5

4

5

5

X2

1 W 1 V 1 U

M 3

P E

Motor with 24 V DC brake

Galvanic isolation An external isolating contactor must be fitted to ensure galvanic isolation from the power supply system!

SIMATIC - EM 300 Motor Starters GWA-4NEB 640070302-05

2-11

Page 24

Wiring

2.4

Motor Starters EM 300 with a 400 V AC resp. 500 V DC Braking Contact

2.4.1

Making up Connecting Cables

Accessories If you want to make up your own connecting cable for motor starters EM 300 with a 400 V AC resp. 500 V DC braking contact, you will need one crimping tool for contact pins/jacks (alternatively, they can be soldered) and the following components. You need ... For connecting load supply voltage

X1

For connecting load with brake 400 V AC resp. 500 V DC

X2

For looping through load supply voltage

One flexible 4-core copper cable 2.5 mm2 / 4.0 mm2 (3 conductors + PE)

One flexible 6-core copper cable 1.5 mm2 / 2.5 mm2 (3 conductors + PE + 2 conductors)

One flexible 4-core copper cable 2.5 mm2 / 4.0 mm2 (3 conductors + PE)

One set of connectors

One set of connectors

One set of connectors

• •

2.5 mm2: 3RK1902-0CA00 4.0 mm2: 3RK1902-0CB00, • •

1.5 mm2: 3RK1902-0CE00 2.5 mm2: 3RK1902-0CC00

• •

X3

2.5 mm2: 3RK1902-0CC00 4.0 mm2: 3RK1902-0CD00 resp.

resp.

one motor connecting cable with plug, 4 x 1.5 mm2 one power connecting cable with plug and socket

• • •

•

3 m: 3 RK1 902-0CN00 5 m: 3 RK1 902-0CR00 10 m: 3 RK1 902-0CS00

•

6 x 2.5 mm2, 0.12 m: 3 RK1 902-0CH00 4 x 4.0 mm2, 0.15 m: 3 RK1 902-0CG00

SIMATIC - EM 300 Motor Starters

2-12

GWA-4NEB 640070302-05

Page 25

Wiring

2.4.2

Wiring the Power Connectors

Pinout The diagram and the table below indicate the pinout of the power connector and the two power sockets on a motor starter EM 300 with a braking contact 400 V AC resp. 500 V DC.

1

2

Pinout

7

7

4

5

4 6

6

3

5

1

8

Plug X1

8

2

3

3

2

1

5 8

Socket X2

4 6

7

Socket X3

Connecting load supply voltage

Connecting load with brake

Looping through load supply voltage

1, Phase 1, 2

Phase 2, Phase 2

3, Phase 3, 4, L1 / +OUT, 5, L3 / +IN, 6

Phase 1, Phase 3

7, Phase 2, 8

Phase 3, Phase 1 e

PE

PE

PE

SIMATIC - EM 300 Motor Starters GWA-4NEB 640070302-05

2-13

Page 26

Wiring

Installing and wiring power connectors The power connectors of a motor starter EM 300 with a braking contact 400 V AC resp. 500 V DC consist of the following components: Power socket • for connecting load supply voltage

Power connector • for connecting the load with a brake • for looping through the load supply voltage connector shell connector shell jacks contact pins socket insert pin insert

Installing and wiring power connectors Install the power connectors of a motor starter with a braking contact 400 V AC resp. 500 V DC as follows. Please note the wiring rules described in Chapter 2.1. Step

Procedure Socket for X1

Connector for X2

Connector for X3

1

Feed the cable through the gland, the appropriately-sized sealing ring supplied and the connector shell.

2

Fasten the jacks to the cores • • for phases 1 to 3 for PE

Fasten the contact pins to the cores

Fasten the contact pins to the cores

• • •

• • for phases 1 to 3 for the brake for PE for phases 1 to 3 for PE

3

Press the jacks into the socket insert until they snap into place.

Press the contact pins into the pin insert until they snap into place.

4

Withdraw the cable sufficiently to be able to screw the socket or pin insert tightly inside the connector shell with the enclosed screws.

5

Screw the gland tight.

SIMATIC - EM 300 Motor Starters

2-14

GWA-4NEB 640070302-05

Page 27

Wiring

2.4.3

Electrical Design

Suggested circuit 400 V AC brake The following diagram shows you a way of controlling a pole-changing motor for two directions with a 400 V AC brake by two electronic motor starters EM 300 EDS/ERS. L1 L2 L3 K1 A1

Galvanic isolation

X1

A2 6

2

8

8

1

7

3

4

2

X3

X1

X3

6

5

6

2

8

1

7

3

8

2

6

X2

X2

1 W

2 U

1 V 1 U

M 3

2 V 2 W

P E

Motor with separate windings and brake 400 V AC

Galvanic isolation An external isolating contactor must be fitted to ensure galvanic isolation from the power supply system!

SIMATIC - EM 300 Motor Starters GWA-4NEB 640070302-05

2-15

Page 28

Wiring

Suggested circuit 500 V DC brake The following diagram shows you a way of controlling a motor with a 500 V DC brake by one electronic motor startermotor starter EM 300.

L1 L2 L3 K1 A1

X1

A2

Galvanic isolation

X3

6

2

8

8

2 6

1

7

3

5

4

X2 + -

1 W

1 V 1 U

M 3

P E

Motor with brake 500 V DC

Galvanic isolation An external isolating contactor must be fitted to ensure galvanic isolation from the power supply system!

SIMATIC - EM 300 Motor Starters

2-16

GWA-4NEB 640070302-05

Page 29

3

Commissioning

Section

Subject

Page

3.1

Motor Starters EM 300 DS and EM 300 RS

3-2

3.1.1

Commissioning

3-2

3.1.2

Operation

3-3

3.1.3

Diagnostics

3-4

3.2

Motor Starters EM 300 EDS and EM 300 ERS

3-6

3.2.1

Commissioning

3-6

3.2.2

Operation

3-8

3.2.3

Diagnostics

3-10

SIMATIC - EM 300 Motor Starters GWA-4NEB 640070302-05

3-1

Page 30

Commissioning

3.1

Motor Starters EM 300 DS and EM 300 RS

3.1.1

Commissioning

Set current Ie Before you commission the motor starter, you must set the current Ie for tripping the overload release. Step

Procedure

1

Open the transparent cover in the top section of the motor starter.

2

Set the current Ie on the circuit-breaker scale with a screw-driver (see figure on page 1-2).

External short-circuit protection If the short-circuit current at the point at which the motor starter is installed is greater than the rated ultimate short-circuit breaking capacity of the circuitbreaker (see table), you must provide external short-circuit protection (fuse or circuit-breaker; see Catalog). Ue

Icu max

400 V AC

50 kA

440 V AC

10 kA

500 V AC

3 kA

Overload release test You can test the overload release function. Step

Procedure

1

Open the transparent cover in the top section of the motor starter.

2

Reset the toggle switch from 0 to 1.

3

Insert a screwdriver in the test opening (see figure on page 1-2) and press it over to the left. The overload release function is working if the toggle switch is switched back from 1 to 0.

Reversing starter EM 300 RS When switching over from right to left or back again, a stop interval of more than 200 milliseconds must be observed. This interval has to be set via the user program.

SIMATIC - EM 300 Motor Starters

3-2

GWA-4NEB 640070302-05