The text of a manual · part 3 of 4
POWERLINK AS Control Module AS42C and AS42C-T, pages 17 to 22
Pages 17 to 22 of 28
The original document is the PDF (327 KB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Square D AS42C and Schneider AS42C
Page 17
Bulletin 1210IM9502R12/97 December 1997
APPENDIX C - OPERATION OF INPUTS
Up to 16 switch inputs connected to panelboard power interface module
Up to 48 additional switch inputs connected to expansion cabinet
POWERLINK AS
POWERLINK AS Input
Panelboard
Expansion Cabinet Input Range Switch set to 9-56
Figure 12
Up to 48 switch inputs connected to expansion cabinet (Inputs 1-8 NOT Maintained)
POWERLINK AS Input
Expansion Cabinet
POWERLINK AS
Panelboard Input Range Switch set to 1-48
Figure 13
1997 Square D All Rights Reserved
17
Page 18
Bulletin 1210IM9502R12/97 December 1997
APPENDIX D - PRIORITIES
APPENDIX D, PRIORITIES There may be cases when the POWERLINK system receives conflicting commands. For example, a time-based event may tell a circuit breaker to turn ON, while at the same time an input event tells it to turn OFF. The POWERLINK system handles these conflicts by assigning priorities. Table 3 shows how the system assigns priorities.
HIGHEST
Operating Mode (Run, Manual, Hold)
PRIORITY
Default Action When No Controller (All On, All Off, N. C., Run Inputs)
LOWEST
Continuous Override
Priority Maintained (From inputs 1–8 and 57–64, Power Interface Module)
Temporary Override - Over the Network - Time of Day Event Equal - Special Date Event Priority - Input Event - Sunrise/Sunset
Table 3
As table 3 shows, the operating mode has the highest priority, and temporary overrides have the lowest priority. The following examples illustrate.
The four items in the temporary override category have equal priority. Items within a category are executed in the order in which they are received. The following example illustrates. From a remote PC, you send a command over the network to temporarily override breaker 1, turning it OFF. A few seconds later, a time of day event occurs that is programmed to turn breaker 1 ON. Breaker 1 turns ON. Priority maintained events take precedence over normal inputs and time programs but have a priority below that of continuous overrides. The following example illustrates: Breakers 1–4 are controlled by two timebased events and an input event, (i.e., wall switch). The first time-based event is scheduled to turn the breakers ON at 7:00 AM weekdays, and OFF at 8:00 PM week nights. Input 1 is a 2-wire maintained contact input and is configured to be a priority maintained input type. At 7:30 PM, breakers 1–4 are ON; it is desired to keep them on past the normal scheduled turn-off time. Input 1 can be switched ON, effectively overriding the scheduled OFF event at 8:00 PM. When input 1 is turned OFF, the breakers assume the state of the last active event (in this case, the last active event was OFF at 8:00 PM; therefore, breakers turn OFF when input 1 is turned OFF). If the input is turned OFF before 7:00 AM, the breakers turn OFF. If the input is turned OFF after 7:00 AM, the breakers remain ON.
Example: (For this example, assume that you’ve set the Default Action When No Controller to ALL ON. ALL ON means that when the control module is removed from the panel, all circuits are turned ON.) At 7:00 p.m. a time of day event occurs that turns zone 1 OFF. At 7:05 p.m. you remove the control module from the panel. Since the Default Action When No Controller has higher priority than a temporary override caused by a time of day event, the breakers in zone 1 turn ON.
18
1997 Square D All Rights Reserved
Page 19
Bulletin 1210IM9502R12/97 December 1997
APPENDIX E - SUNRISE/SUNSET DATA TABLES
APPENDIX E - SUNRISE/SUNSET DATA TABLES (AS42C-T Only) The following tables are used with the two POWERLINK Software User’s Guides to find the latitude bands for selected U.S. cities. (In the PLK101 User’s Guide, see “Entering Sunrise/Sunset Data” in Chapter 4. In the CMS User’s Guide, see “Entering Sunrise/Sunset Data” in Chapter 5). Table 5 lists latitudes and latitude bands for major U.S. cities. Refer to table 4 to find the latitude band for any city not listed in table 5.
Latitude Band
Range
1 2 3 4 5 6 7 8 9 10 11 12
19°00' to 22°59' 23°00' to 26°59' 27°00' to 30°59' 31°00' to 34°59' 35°00' to 38°59' 39°00' to 42°59' 43°00' to 46°59' 47°00' to 50°59' 51°00' to 54°59' 55°00' to 58°59' 59°00' to 62°59' 63°00' to 66°59'
Note: Sunrise and sunsets times are calculated based on the latitude at the center of the selected band, the current date, and the sunrise time on the day the data is entered.
Table 4
Latitudes and Latitude Bands of U.S. Cities City and State
Lat.
Lat. Band.
City and State
Lat.
Lat. Band.
Akron, OH Albany, NY Albuquerque, MN Allentown, PA Amarillo, TX Anchorage, AK Ann Arbor, MI Asheville, NC Atlanta, GA Augusta, GA Austin, TX Baltimore, MD Bangor, ME Baton Rouge, LA Biloxi, MS Birmingham, AL Bismarck, ND Boise, ID Boston, MA Brattleboro, VT Bridgeport, CT Buffalo, NY Butte, MT Casper, WY Charleston, SC Charlotte, NC Chattanooga, TN Cheyenne, WY Chicago, IL Cincinnati, OH Cleveland, OH Columbus, OH Concord, NH Dallas, TX Dayton, OH Daytona Beach, FL Denver, CO Des Moines, IA Detroit, MI Dubuque, IA Duluth, MN
41° N 43° N 35° N 41° N 35° N 61° N 42° N 36° N 34° N 33° N 30° N 39° N 45° N 30° N 30° N 34° N 47° N 44° N 42° N 43° N 41° N 43° N 46° N 43° N 33° N 35° N 35° N 41° N 42° N 39° N 42° N 40° N 43° N 33° N 40° N 29° N 40° N 42° N 42° N 42° N 47° N
6 6 5 6 5 11 6 5 4 4 3 6 7 3 3 4 7 7 6 6 6 6 7 6 4 5 5 6 6 6 6 6 7 4 6 3 6 6 6 6 7
Durham, NC El Paso, TX Eugene, OR Fairbanks, AK Fargo, ND Flagstaff, AZ Fort Wayne, IN Fort Worth, TX Gainesville, FL Galveston, TX Gary, IN Grand Rapids, MI Green Bay, WI Greenville, SC Harrisburg, PA Hartford, CT Honolulu, HI Houston, TX Indianapolis, IN Iowa City, IA Jacksonville, FL Joplin, MO Juneau, AK Kalamazoo, MI Kansas City, MO Knoxville, TN Lancaster, PA Las Vegas, NV Lincoln, NE Little Rock, AR Los Angeles, CA Louisville, KY Macon, GA Madison, WI Memphis, TN Miami, FL Milwaukee, WI Minneapolis, MN Mobil, AL Montgomery, AL Montpelier, VT
36° N 32° N 44° N 65° N 47° N 35° N 41° N 33° N 30° N 29° N 42° N 43° N 44° N 35° N 40° N 42° N 21° N 30° N 40° N 42° N 30° N 37° N 58° N 42° N 39° N 36° N 40° N 36° N 41° N 35° N 34° N 38° N 33° N 43° N 35° N 26° N 43° N 45° N 31° N 32° N 44° N
5 4 7 12 7 5 6 4 3 3 6 7 7 5 6 6 1 3 6 6 3 5 10 6 6 5 6 5 6 4 4 5 4 7 5 2 7 7 3 4 7
City and State
Lat.
Lat. Band.
Nashville, TN Newark, NJ New Haven, CT New Orleans, LA New York, NY Niagara Falls, NY Nome, AK Norfolk, VA Oakland, CA Oklahoma City, OK Omaha, NE Peoria, IL Philadelphia, PA Phoenix, AZ Pittsburgh, PA Pocatello, ID Portland, ME Portland, OR Providence, RI Provo, UT Reno, NV Richmond, VA Rochester, NY St. Louis, MO Salt Lake City, UT San Francisco, CA Santa Fe, NM Savannah, GA Seattle, WA Shreveport, LA Sioux Falls, SD Syracuse, NY Tallahassee, FL Texarkana, TX Topeka, KS Tulsa, OK Tucson, AZ Utica, NY Washington, DC Wichita, KS Wilmington, DE
36° N 41° N 41° N 30° N 41° N 41° N 64° N 37° N 38° N 35° N 41° N 41° N 40° N 33° N 40° N 43° N 44° N 46° N 42° N 40° N 40° N 38° N 43° N 39° N 41° N 38° N 36° N 32° N 48° N 32° N 44° N 43° N 30° N 33° N 39° N 36° N 32° N 43° N 39° N 38° N 40° N
5 6 6 3 6 6 12 5 5 5 6 6 6 4 6 6 7 7 6 6 6 5 7 5 6 5 5 4 8 4 7 7 3 4 6 5 4 7 5 5 6
Table 5 1997 Square D All Rights Reserved
19
Page 20
Page 21
Bulletin 1210IM9502R12/97 December 1997
GLOSSARY
GLOSSARY barrier kit = provides a physical barrier between the panel and system external control wiring.
override = program instruction which sets aside the normally programmed operation.
baud rate = specifies how fast data is transmitted across a network port.
password = see access code circuit breaker = a device designed to open and close a branch circuit by non-automatic means and to open the circuit automatically on an overcurrent without damage to itself when properly applied within its rating. continuous current rating = the designated rms alternating current in amperes which a device or assembly will carry continuously without tripping. control bus = provide connection between POWERLINK AS remotely operated circuit breakers and the POWERLINK AS power interface module. control module = provides programmable control for POWERLINK AS remotely operated circuit breakers. event = input change used to trigger operation of a remotely operated circuit breaker. (For maintained contacts, a close or an open. For momentary contacts, a closure.)
power interface module = controls POWERLINK AS remotely operated circuit breakers via POWERLINK AS control bus. POWERLINK AS system = provides a remote power switching system in a panelboard for controlling lighting and other electrical loads. programming = instructions entered into POWERLINK software, telling the control module how to operate the circuits under its control. priorities = assigned by the POWERLINK AS system to handle conflicting commands in order of importance. remotely operated circuit breaker = circuit breakers with an integral operator which can turn the circuit breaker on or off. RS-232 port = input connection on the bottom of the control module for RS-232 cable.
input = control signal received by POWERLINK AS system input connections.
screen = LED screen on the control module face used to view and set up communications in the control module.
interface module = see power interface module.
selection key = switch on control module used to set up communication parameters.
internal date = date maintained by the control module memory. internal time = time maintained by the control module memory. interrupting rating = highest current at rated voltage available at the incoming terminals of the circuit breaker. The circuit breaker interrupting rating must be equal to or greater than the available short-circuit current at the point where the circuit breaker is applied to the system.
special dates = dates which are exceptions to regular operation dates. sunrise/sunset circuit = circuits which interact with time-based programs so that the circuits are on at the programmed times only if they are also between sunset and sunrise, plus or minus an offset time. system configuration = how the system is set up. terminal block = the connections for control wiring.
key = see selection key time-based = operation is based on time of day. latitude = line running east-west used to give distance north or south from the equator measured through 90°. network = an interconnected group of processing equipment, such as personal computers, which can communicate with each other.
troubleshooting = evaluating and correcting problems in operation. zones = a group of circuits which can be programmed to operate together.
overcurrent = any current in excess of the rated continuous current of equipment or the ampacity of a conductor.
1997 Square D All Rights Reserved
21
Page 22
Bulletin 1210IM9502R12/97 December 1997
22
GLOSSARY
1997 Square D All Rights Reserved