SLC 500 Fixed Hardware Style (Cat. No. 1747-L20, 1747-L30, and 1747-L40 Processors) Installation and Operation Manual: 6 - Starting Up Your Control System

Pages 74 to 85 of 223, from SLC 500 Fixed Hardware Style (Cat. No. 1747-L20, 1747-L30, and 1747-L40 Processors) Installation and Operation Manual

The original document is the PDF (1.7 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the Allen-Bradley 1747-L20A, Allen-Bradley 1747-L20B, Allen-Bradley 1747-L20C, Allen-Bradley 1747-L20L, Allen-Bradley 1747-L30D, Allen-Bradley 1747-AIC and Allen-Bradley 1747-L40C

Page 74

Chapter

6

Starting Up Your Control System This chapter describes how to start up your control system. To accomplish this, you must go through eight procedures.

Procedures for Starting Up the Control System

Start–up involves the following procedures to be carried out in sequence: 1. Inspect your installation. 2. Disconnect motion–causing devices. 3. Initialize and test your processor. 4. Test your inputs. 5. Test your outputs. 6. Enter and test your program. 7. Observe control motion. 8. Conduct a dry run of your application. These procedures isolate problems such as wiring mistakes, equipment malfunction, and programming errors in a systematic, controlled manner. We urge you to go through these procedures very carefully. This will help you avoid possible personal injury and equipment damage. Important: Do not attempt system start–up until you are thoroughly familiar with the controller components and programming/editing techniques. You must also be thoroughly familiar with the particular application. For general recommendation concerning installation safety requirements and safety requirements and safety related work practices, refer to NFPA 70E, Electrical Safety Requirements for Employee Workplaces.

6–1

Page 75

Chapter 6 Starting Up Your Control System

1. Inspect Your Installation

You can often prevent serious problems in later test procedures by first making a thorough physical inspection. We recommend that you do the following: 1. Make sure that the controller and all other devices in the system are securely mounted. Refer to chapter 3 and chapter 4 for more information. 2. Check all wiring including: • connections from the main disconnect to the controller input • the master control relay/emergency–stop circuit • input device circuits • output device circuits Make certain that all wiring connections are correct and that there are no missing wires. Check the tightness of all terminals to make certain wires are secure. Refer to chapter 5 for more information. 3. Measure the incoming line voltage. Be certain that it corresponds to controller requirements and that it falls within the specified voltage range. See specifications for input voltage ranges in chapter 1.

2. Disconnect Motion-causing In the following test procedures, the controller will be energized. As a safety precaution, you must make certain that machine motion will not occur. The Devices preferred way is to disconnect the motor wires at the motor starter or the motor itself. In this way, you can test the operation of the starter coil, verifying that your output circuit is wired correctly and functioning. Similarly, the preferred way to disconnect a solenoid is to disengage the valve, leaving the coil connected.

In some instances, you may not be able to disconnect a device the preferred way. In this case, it will be necessary to open the output circuit at some convenient point. For circuit testing purposes, it is best to open the circuit at a point as close as possible to the motion–causing device. For example, your output might be a relay coil that in turn energizes a motor starter; if it is impractical to disconnect the motor wires, the next best thing to do is to open the circuit at a point between the motor starter and the relay contact.

!

6–2

ATTENTION: Machine motion during system checkout can be hazardous to personnel. During the checkout procedures 3, 4, 5, and 6, you must disconnect all devices that, when energized, might cause machine motion.

Page 76

Chapter 6 Starting Up Your Control System

3. Initialize and Test Your Processor

When you are certain that machine motion cannot occur with the controller energized, you may begin by initializing the processor using the following steps: 1. Energize the controller. If power is supplied to the controller and the installation is correct, then: A. The POWER LED turns on as shown in the figure below. POWER PC RUN CPU FAULT FORCED I/O BATTERY LOW

Indicates the LED is OFF. Indicates the LED is ON.

The CPU FAULT LED also turns on during power–up, but it should go off after a few seconds. If instead this LED starts flashing, it indicates you must clear the processor memory before continuing. B. The following processor initial factory conditions apply: • Mode = PROGRAM MODE (S:1/0 – S:1/4 = 0 0001) • Watchdog values = 100ms (S:3H = 0000 1010) • I/O Slot enables = ALL ENABLED (S:11/1 through S:12/14 set to 1) • Node address = 1 (S:15L = 0000 0001) • Baud Rate = 19.2K baud (S:15H = 0000 0100) • Processor Name = DEFAULT 2. Power up the programming device. Refer to the Hand–Held Terminal User Manual, Catalog Number 1747–NP002, for information on programming your fixed controller with the HHT. Refer to the Advanced Programming Software User Manual, Catalog Number 1747–NM002 Series C, and the Advanced Programming Software Reference Manual, Catalog Number 1747–NR001, for information on programming your fixed controller with APS. 3. Configure the controller. 4. Name the processor file. 5. Program a sample test rung not affecting machine operation. 6. Save the program and the controller configuration. 6–3

Page 77

Chapter 6 Starting Up Your Control System

7. Transfer the controller configuration and the sample test program to the processor. After the new program is transferred to the processor, the processor fault status should clear. (The CPU FAULT LED stops if it was flashing.) 8. Enter the Run mode. The processor PC RUN LED should turn on indicating the controller is in the RUN mode with no processor faults. If any other processor status exists, refer to chapter 8. 9. Monitor the sample test rung. If the sample test rung operates successfully without processor faults, you have verified that basic processor functions are properly functioning. If any other processor status exists, refer to chapter 8.

4. Test Your Inputs

After successful processor initialization and test, you may begin testing inputs following these steps: 1. Assuming you are still online with the programming device, put the controller into the Continuous Test mode. This allows the processor to scan the I/O and program, but not turn on any physical outputs. 2. Monitor the data in data File 1, the input data file. All configured inputs should be displayed. 3. Make sure the first input slot, slot 0, is shown on the monitor. 4. Select the first input device connected to Input 0 of the fixed I/O chassis. 5. Manually close and open the addressed input device.

!

6–4

ATTENTION: Never reach into a machine to actuate a device, unexpected machine operation could occur.

Page 78

Chapter 6 Starting Up Your Control System

6. Observe the associated bit status using the programming device monitor function. Also, observe the input status LED on the fixed I/O chassis. A. When the input device is closed verify that the voltage at the input terminal is within the specified on–state range, the input status LED is on, and the associated status bit is set to a one. If any of these conditions are not satisfied, follow the recommended troubleshooting steps listed below. B. When the input device is opened verify that the voltage at the input terminal is within the specified off–state range, the input status LED is off, and the associated status bit is reset to 0. If any of these conditions are not satisfied, follow the recommended troubleshooting steps listed below. 7. Select the next input device and repeat steps 5 and 6 until all inputs on the fixed I/O chassis and in the 2–slot expansion rack (if used) have been tested.

Input Troubleshooting Steps 1. Make sure the processor is in the Continuous Test mode. 2. Verify that your inputs and outputs are enabled. Status file bit S:11/0 represents the inputs and outputs of the fixed controller. Status file bits S:11/1 and S:11/2 represent the inputs and outputs (slot 1 and slot 2 respectively) of the 2–slot expansion chassis. These bits must be set to one, enabling all your inputs and outputs. 3. Check your wiring and verify that all connections are tight. A. Make sure that power connections have been made to your input device if needed. B. Verify that the signal connection has been made from the input device to the correct input circuit of the fixed controller. C. Check that all common connections have been made. 4. Check your specifications. A. Make sure that the power is within the specified voltage range if your input device requires power. B. Verify that your power supply is not overloaded. An overloaded supply can deliver the correct voltage when some of its loads are not energized but the voltage may fall out of range when all of its loads are energized. C. Verify that your input device signal contact is specified to deliver sufficient current to the input circuit and any other loads connected to it. D. Make certain that your input device does not have a minimum load specification that is greater than the input circuit current specification. E. Verify that the input device is on and off longer than the specified turn–on and turn–off times for the input circuit. 6–5

Page 79

Chapter 6 Starting Up Your Control System

5. Disconnect your input devices from the fixed controller input terminals. Make a direct connection from a power supply to the fixed controller input and common terminals. The power supply voltage must be within the specified on–state voltage range of the input circuit. If you can energize and de–energize the input circuit by turning the power supply on and off, the basic operation of the input circuit is functioning correctly. The problem is likely to be with the input device or wiring. If you cannot operate the the input circuit by a direct connection, the input circuit is not functioning and should be replaced. 6. Connect a different load to your input device. Open and close the input device and measure the voltage at the load. If your input device cannot operate other loads, the input device is not functioning properly and should be replaced. For more information on input troubleshooting, see page 8–8.

5. Test Your Outputs

After you test all inputs, and have determined that they are functioning properly, test the outputs following these steps. 1. Refer to page 6–2 to insure that no motion will occur when any controller output is energized. 2. Place the controller in the Program mode. 3. Create an output test rung as shown below for each output slot configured. Enter your source and destination address: MOV SOURCE B3: DEST O:

“X”

“X”

Here “X” represents the slot number of the output currently selected. This rung moves a word of data from the bit file to the output file. The slot number is 0 for outputs of the fixed controller. If the 2–slot expansion chassis is used, numbers one and two are used for the outputs in slots 1 and 2 respectively. 4. Save the output test program and controller configuration. 5. Transfer the output test program to the processor. 6. Put the controller in the Run mode. 7. Monitor the data in bit file B3 on the programming device display. 8. Enter B3: “X” at the address prompt to select the output slot to be tested. 9. Move the cursor to the bit position that corresponds to the specific output being tested. Set the bit to 1.

6–6

Page 80

Chapter 6 Starting Up Your Control System

10.Observe the output status LED and the output device. The output status LED should turn on. The output device should be energized unless you disconnected it to prevent machine motion. It may be necessary to connect a dummy load to the output to complete this test. If the LED does not turn on or if the load is not energized, follow the output troubleshooting steps listed below. 11. Reset the bit value back to zero for the selected address. Both the output status LED and the output device should de–energize. If the LED does not turn off or if the load does not de–energize, follow the output troubleshooting steps listed below. 12.Repeat steps 9 through 11 for all outputs of the selected slot. 13.Repeat steps 8 through 12 for all slots (with outputs) that are a part of the fixed controller configuration.

Output Troubleshooting Steps 1. Make sure the processor is in the Run mode. 2. Verify that the test rung recommended in the previous section has been entered correctly. 3. Check the status file I/O slot enable bits. Status file bit S:11/0 represents the inputs and outputs of the fixed controller. Status file bits S:11/1 and S:11/2 represent the inputs and outputs (slot 1 and slot 2 respectively) of the 2–slot expansion chassis. These bits must be set to one, enabling all your inputs and outputs. 4. Use a programming device to verify that the bit being tested in the output file tracks the on/off status of the corresponding bit in the bit file. If the output file does not track the bit file, but your program has been entered correctly and the I/O are enabled, then your processor is not functioning properly and should be replaced. If the output file tracks the bit file, then the processor is functioning properly and the output command is being sent to either the I/O section of the fixed controller, or to the output module in the 2–slot expansion chassis. 5. Check the electrical connections. A. If the output being tested is in the 2–slot expansion chassis, verify that the expansion chassis connector is properly mated to the expansion connector of the fixed controller. B. Turn off power to the I/O circuits. Verify that power and/or common connections are made to the proper output circuit terminals. C. Verify that the power connections are made to the output load device if they are required. D. Verify that the output terminal being tested is connected to the correct termination point of the load device. E. Check the tightness of all terminals to make certain that all wires are secure. 6–7

Page 81

Chapter 6 Starting Up Your Control System

6. Check your specifications. A. Verify that all power supplies used are within the specified operating ranges of the I/O circuits and loads. B. Check that the specified load current is greater than the minimum load current specified for the output circuit. (Leakage current from the output circuit may prevent you from turning off a low current load.) C. Check that the specified load current is less than the maximum load current of the output circuit. D. Make sure that the sum of all the load currents is equal to or less than the power supply capacity. 7. Restore power to the I/O circuits and test the output. If the preceding measures have not corrected the problem, turn off the I/O power and disconnect the load. Connect the load directly to the I/O power supply. You should be able to operate the load by turning the power supply on and off. If you can operate the load, and the load is within the specified operating range of the output circuit, the output circuit is not functioning properly. Replace the fixed controller or output module as necessary. If you cannot operate the load by turning the power supply on and off, the load is not operating properly and it should be replaced. For more information on output troubleshooting, refer to page 8–10.

6. Enter and Test Your Program After you test all inputs and outputs and they are functioning properly, we recommend the following steps to safely and successfully enter and test your specific application program. (For extra assistance, see the Hand–Held Terminal User Manual or the Advanced Programming Software User Manual.) 1. Verify the offline program. After the program has been entered in the offline edit file mode, program verification may begin. Remaining in the offline edit file mode you may use the cursor keys and/or search function of your programming device to inspect every instruction and rung for errors. 2. Check your written program, rung for rung, against the program entered into the offline memory. The most common errors found in program entry are: • incorrect addressing of instructions • omission of an instruction • more than one output instruction programmed using the same address

6–8

Page 82

Chapter 6 Starting Up Your Control System

3. Transfer the program into the processor. A. Place your programming device online. B. Place the processor in Program mode. C. Select download function when using the Hand–Held Terminal or the restore function when using Advanced Programming Software. 4. Verify the online program transfer. A. Select monitor file function. B. Cursor through the program to verify that you selected the right program. 5. Conduct a single–scan program test. A. Select the monitor file function and place the cursor on the first rung. B. Select the Test mode. C. Select Single–Scan (SSN) test. In this test mode, the processor executes a single operating cycle, which includes reading the inputs, executing the ladder program, and updating all data without energizing the output circuits. However, the monitor file function will identify the output status as if the outputs were enabled. Timers are also incremented a minimum of 10 milliseconds each single scan. D. Simulate the input conditions necessary to execute the current monitored rung of the program. If it is not practical to manually activate the input device, use the force function to simulate the proper condition.

!

ATTENTION: Never reach into a machine to actuate a device, unexpected machine operation could occur.

E. Activate a single operating scan as outlined in the programming device user manual. F. Verify the intended effects on the output instructions for that rung and overall program logic effects. G. Select the next program rung and repeat test procedures as listed above until the entire program has been tested. 6. Conduct a continuous scan program test. Once the individual single scan rung tests have been completed and proper program operation verified, a continuous scan test might be appropriate before motion checkout. This mode simulates the controller Run mode without energizing the external outputs.

6–9

Page 83

Chapter 6 Starting Up Your Control System

7. Observe Control Motion

Now that program execution has been verified, checkout of control motion can begin. All persons involved with the programming, installation, layout design, machine or process design, and maintenance should be involved in making decisions for determining the best and safest way to test the total system. The following procedures are general in nature. Individual conditions may warrant their modification. The basic approach is to initiate testing with the least amount of machine motion. Only some outputs are allowed to generate machine motion. Then additional machine motion can be gradually added, thereby allowing any problems to be detected more easily under controlled conditions. The following procedure provides the steps for testing machine motion using one output at a time.

!

ATTENTION: During all phases of checkout, station a person ready to operate an emergency–stop switch if necessary. The emergency–stop switch will de–energize the master control relay and remove power from the machine. This circuit must be hardwired only, it must not be programmed.

Use the following procedures: 1. Identify the first output device to be tested and reconnect its wiring.

!

ATTENTION: Contact with AC line potential may cause injury to personnel. When reconnecting wiring, make sure that AC power disconnect switch is opened.

2. Place the controller in the Run mode and observe the behavior of the output device. To do this, simulate the input conditions necessary to energize the output in the program. If it is not practical to manually activate an input device, use the force function to simulate the proper input condition.

!

ATTENTION: Never reach into a machine to actuate a device, unexpected machine operation could occur.

3. Repeat steps 1 and 2, testing each output device, one at a time.

6–10

Page 84

Chapter 6 Starting Up Your Control System

8. Conduct a Dry Run

!

ATTENTION: During all phases of the dry run test, station a person ready to operate an emergency–stop switch if necessary. The emergency–stop switch will de–energize the master control relay and remove power from the machine. This circuit must be hardwired only, it must not be programmed.

After thoroughly checking out the controller system and program, proceed with a dry run of the application with all of the output devices enabled. This dry run will vary with the application. For example, a machine tool dry run might test the program with all outputs enabled but without tooling an actual part. After you check out the entire system, and your dry run has been completed satisfactorily, we recommend that you load your program into an EEPROM memory module for back–up program storage. See chapter 3 for more information. Refer to the Hand–Held Terminal User Manual, Catalog Number 1747–NP002, or the Advanced Programming Software User Manual, Catalog Number 1747–NM002, for directions on loading the EEPROM from RAM. This step completes the start–up procedures. Your SLC Programmable Controller is now ready for operation.