Page 61

System Installation Recommendations

Grounding Guidelines

61

In solid-state control systems, grounding helps limit the effects of electrical noise due to electromagnetic interference (EMI). The ground path for the SLC 500 controller and its enclosure is provided by the equipment grounding conductor.

Scrape paint off panel to insure electrical connection between chassis and grounded metal panel. Metal Panel (Must be connected to earth ground.)

Size M4 or M5 (#10 or #12) Internal Star Washer

4M or 5M (#10 or #12 phillips screw Chassis Mounting Tab

5.2 mm2 (10 AWG) to Ground Bus

ATTENTION

The 1746 chassis, the enclosure, and other control devices must be properly grounded. All applicable codes and ordinances must be observed when wiring the SLC 500 controller system.

Connect Equipment Grounding Conductor to Ground Bus Ground connections should run from the chassis and power supply on each SLC 500 controller and expansion unit to the ground bus. Exact connections will differ between applications.

Publication 1747-UM011G-EN-P - June 2008

Page 62

62

System Installation Recommendations

Ground Bus Mounting

Ground Bus Equipment Grounding Conductors Ground Lug

Bolt - Size M5 or M6 (4.826 mm or 5.48 mm) hardware

Tapped Hole

Grounding-Electrode Conductor to Grounding-Electrode System Internal star washer - Size M5 or M6 (#10 or #12)

• Use 2.54 cm (1 in.) copper braid or 5.2 mm2 (#10 AWG) copper wire to connect each chassis, the enclosure, and a central ground bus mounted on the back-panel. • Use a steel enclosure to guard against electromagnetic interference (EMI). • Make sure the enclosure door viewing window is a laminated screen or a conductive optical substrate (to block EMI). • Install a bonding wire for electrical contact between the door and the enclosure; do not rely on the hinge. IMPORTANT

Do not lay one ground lug directly on top of the other; this type of connection can become loose due to compression of the metal lugs. Place the first lug between a star washer and a nut with a captive star washer. After tightening the nut, place the second lug between the first nut and a second nut with a captive star washer.

Connect Ground Bus to Grounding-Electrode System The grounding-electrode system is at earth-ground potential and is the central ground for all electrical equipment and ac power within any facility. Use a grounding-electrode conductor to connect the ground bus to the grounding-electrode system. Use at minimum 8.3 mm2 (#8 AWG) copper wire for the grounding-electrode conductor to guard against EMI. The National Electrical Code specifies safety requirements for the grounding-electrode conductor. Europe: Reference EN 60204 for safety information on grounding. Also, refer to Allen-Bradley Programmable Controller Grounding and Wiring Guidelines,

Publication 1747-UM011G-EN-P - June 2008

Page 63

System Installation Recommendations

63 publication 1770-4.1, and System Design for Control of Electrical Noise, publication GMC-RM001. United States: An authoritative source on grounding requirements for most installations is the National Electrical Code. Also, refer to Allen-Bradley Programmable Controller Grounding and Wiring Guidelines, publication 1770-4.1 and System Design for Control of Electrical Noise, publication GMC-RM001. In addition to the grounding required for the SLC 500 controller and its enclosure, you must also provide proper grounding for all controlled devices in your application. Care must be taken to provide each device with an acceptable grounding path. This figure shows you how to run ground connections from the chassis to the ground bus. The recommended grounding method is shown below. Using a ground bus reduces the electrical resistance at the connection. Ground Connection Paths Nearest Ground Bus Earth Ground 8.37 mm2 (8 AWG) wire Functional Ground 5.26 mm2 (10 AWG) Safety Ground 2 mm2 (14 AWG)

Safety Ground 2 mm2 (14 AWG)

Safety Ground 2 mm2 (14 AWG)

(1)

(1)

(1)

(1) Keep safety ground connection to panel as short as possible.

Publication 1747-UM011G-EN-P - June 2008

Page 64

64

System Installation Recommendations

Special Grounding Considerations for dc Applications using 1746-P3 (previous to revision B) This information describes special wiring considerations for the 1746-P3 power supply that is not labeled as revision (REV) B or later-. Keep wire length as short as possible. ATTENTION

Any voltage applied to the 1746-P3 DC NEUT terminal will be present at the SLC logic ground and the processor DH-485 port. To prevent unwanted potentials across the logic ground of the controller and/or damage to the SLC chassis, the DC NEUTRAL of the external dc power source must be either isolated from the SLC chassis ground, or connected to earth ground.

1746-P3 External dc Power Source

Not Used +24V dc

DH-485 Port SLC Logic Ground

DC Neut

DC NEUT

Chassis Ground

Chassis Ground

Earth Ground

SLC 500 Chassis

Door Not Used

+24 VDC

Processor

A jumper wire is recommended between the DC NEUT and Chassis Ground of the external power source.

Publication 1747-UM011G-EN-P - June 2008

Safety Ground

Earth Ground

Page 65

System Installation Recommendations

IMPORTANT

65

SLC 500 series A chassis (1746-A4, 1746-A7, 1746-A10, and 1746-A13) manufactured before November 1992 have a resistor between the logic ground and chassis ground as the drawing on the following page illustrates. This resistor could be damaged if the wiring recommendation described within the attention box above is not followed. See the figure on the following page for the location of the resistor. SLC 500 series A chassis (1746-A4, 1746-A7, 1746-A10, and 1746-A13) with a manufacture date of November 1992 or later do not have this resistor. SLC 500 series B chassis have a 1 MW resistor that limits the current between logic ground and chassis ground.

SLC Chassis 1746-P3

Not Used Not Used

Controller Logic Ground

+24V dc DC Neut Chassis Ground

Safety Ground

Functional Ground

Functional Ground

Publication 1747-UM011G-EN-P - June 2008

Page 66

66

System Installation Recommendations

Determining the Date of the SLC 500 Series A Chassis The date of the chassis is found within the serial number imprinted on the chassis nameplate on the right side of the chassis.

SLC 500 RACK CAT

SER

1746 - A7

A

® UL

SA®

SERIAL NO.

A7 -1195A1357

MADE IN U. S. A.

Right Side Month Year

Master Control Relay

A hard-wired master control relay (supplied by you) provides a convenient means for emergency controller shutdown. Since the master control relay allows the placement of several emergency-stop switches in different locations, its installation is important from a safety standpoint. Overtravel limit switches or mushroom head push buttons are wired in series so that when any of them opens, the master control relay is de-energized. This removes power to input and output device circuits. ATTENTION

IMPORTANT

Never alter these circuits to defeat their function, since serious injury and/or machine damage could occur.

If you are using a dc power supply, interrupt the dc side rather than the ac side to avoid the additional delay of power supply turn-on and turn-off. The dc power supply should receive its power directly from the fused secondary of the transformer. Connect the power to the dc input and output circuits through a set of master control relay contacts.

Place the main power disconnect switch where operators and maintenance personnel have quick and easy access to it. If you mount a disconnect switch inside the controller enclosure, place the switch operating handle on the outside of the enclosure, so that you can disconnect power without opening the enclosure. Publication 1747-UM011G-EN-P - June 2008

Page 67

System Installation Recommendations

67

Whenever any of the emergency-stop switches are opened, power to input and output devices is stopped. When you use the master control relay to remove power from the external I/O circuits, power continues to be provided to the controller’s power supply so that diagnostic indicators on the processor can still be observed. The master control relay is not a substitute for a disconnect to the controller. It is intended for any situation where the operator must quickly de-energize I/O devices only. When inspecting or installing terminal connections, replacing output fuses, or working on equipment within the enclosure, use the disconnect to shut off power to the rest of the system. IMPORTANT

The operator must not control the master control relay with the processor. Provide the operator with the safety of a direct connection between an emergency-stop switch and the master control relay.

Emergency-Stop Switches Adhere to the following points concerning emergency-stop switches. • Do not program emergency-stop switches in the controller program. Any emergency-stop switch should turn off all machine power by turning off the master control relay. • Observe all applicable local codes concerning the placement and labeling of emergency-stop switches. • Install emergency-stop switches and the master control relay in your system. Make certain that relay contacts have a sufficient rating for your application. Emergency-stop switches must be easy to reach. See the schematic on page 69.

Publication 1747-UM011G-EN-P - June 2008

Page 68

68

System Installation Recommendations

Power Considerations

Refer to the following sections regarding power.

Common Power Source All chassis power supplies should have the same power source as the input and output devices. This helps reduce the chance of electrical interference due to multiple sources and grounds as well as helps maintain system integrity if power is interrupted. The processor detects the absence of power to any chassis in the system. If power to any chassis is lost (or not yet applied), the CPU FAULT status indicator turns on and all controller outputs in the local chassis are de-energized. Output states in any remote chassis are determined by configuration settings at that chassis. This fault detection makes it necessary that you apply power to the expansion chassis before you apply power to the chassis containing the processor to avoid an unwanted fault. Of course, applying power in sequence is unnecessary if all chassis have a common power source.

Isolation Transformer In many industrial applications, a step-down transformer is required to reduce line voltage to 120 or 240V ac. This transformer also provides isolation to protect equipment from high voltage transients that may be generated on your power distribution system. ATTENTION

Publication 1747-UM011G-EN-P - June 2008

Your SLC 500 power supply can be damaged by voltage surges when switching inductive loads such as motors, motor starters, solenoids, and relays. To avoid damage to your SLC 500 power supply in these applications, use an isolation transformer to isolate the power supply from harmful voltage surges.

Page 69

System Installation Recommendations

69

Grounded ac Power-Distribution System with Master-Control Relay Disc. Incoming ac

L1

Suppressor 1FU

L1

2FU

L2

L2

3FU

L3

L3

To Motor Starters Back-panel Ground Bus

Step-down Transformer Grounded Conductor

FUSE Multiple E-stop Switches

Grounding-electrode Conductor to Grounding-electrode System

Start EquipmentGrounding Conductors

MCR The I/O circuits form a net inductive load switched by the MCR contacts. Therefore, a suppressor is needed across the line at the load side of the MCR contacts.

Enclosure Wall

1

MCR Controller L1 Power Supply

Suppressor Connect when applicable

GND N or L2 User dc Supply

Suppressor

MCR

Output Actuator

MCR

+ – Input Sensor Input Module Wiring Arm

Output Module Wiring Arm

Power Supply Required Input Voltage Characteristics • The applied input voltage must be at or below 132V ac RMS (265V ac RMS in 240 Volt mode). • Minimum acceptable value of the applied input voltage must be above 85V ac RMS (170V ac RMS in 240 Volt mode). • The frequency of the applied voltage must be within 47...63 Hz. • Both the positive and negative half cycles must be symmetrical and conform to these requirements.

Publication 1747-UM011G-EN-P - June 2008

Page 70

70

System Installation Recommendations

Loss of Power Source The chassis power supplies are designed to withstand brief power losses without affecting the operation of the system. The time the system is operational during power loss is called program scan hold-up time after loss of power. The duration of the power supply hold-up time depends on the number, type, and state of the I/O modules, but is typically 20 ms...3 s. When the duration of power loss reaches a limit, the power supply signals the processor that it can no longer provide adequate dc power to the system. This is referred to as a power supply shutdown. The power supply status indicator is turned off. In multi-chassis systems, power outages of 20...300 ms in duration can cause a remote power fail error to occur. You can clear this error by cycling power to your system or by using a programming device.

Input States on Power Down The power supply hold-up time as described above is generally longer than the turn-on and turn-off times of the input modules. Because of this, the input state change from On to Off that occurs when power is removed may be recorded by the processor before the power supply shuts down the system. Understanding this concept is important. Write the user program to take this effect into account. For example, hard-wire power to one spare input. In the user program, check to be sure that one input is on; otherwise, jump to the end of the program and avoid scanning the logic. Use of a common power source as recommended in the previous section is assumed.

Power Supply Undervoltage Operation SLC 500 controllers continue to operate (hold-up) for a short period of time if the input voltage to the power supply drops below the recommended operating voltage range. The controller continues to scan the user program and control I/O during this time. CPU hold-up time is 20 ms...3 s depending on the power supply and loading. SLC 500 controllers turn OFF (stop scanning and disable outputs) if input voltage to the power supply is removed or drops below the recommended operating range for a period exceeding the CPU hold-up time. The controller resumes operation automatically when the input voltage is restored to normal. If the input voltage to the 1746-P7 power supply falls into a range of 4...9V for a period exceeding the CPU hold-up time, the controller turns OFF and will not turn back ON until the input voltage is increased to 11V dc.