Manual · Allen-Bradley
PLC-2 Family Programmable Controllers Quick Start for Experienced Users
Manual18 pagesPDF 520 KB
Quick start guide for installing and connecting an Allen-Bradley PLC-2 family controller system, including the 1771-AL local I/O adapter.
Covers · 1 model
The models it covers
Summary
What is in it
A short Allen-Bradley quick start for experienced users that walks through installing a basic PLC-2 family programmable controller system (PLC-2/20 and PLC-2/30). Step by step it covers configuring and grounding the 1771 I/O chassis, installing the memory module, installing the I/O adapter module (such as the 1771-AL local adapter) and I/O modules, connecting the power supply, the remote I/O scanner and adapter, and connecting a programming terminal or personal computer, plus specifications.
Its parts
- Preface
- Configure and Ground I/O Chassis
- Install Memory Module
- Install and Connect I/O Adapter Module and I/O Modules
- Install and Connect Power Supply
- Install and Connect Remote I/O Scanner and Adapter
- Configure a Personal Computer
- Specifications
From the manual · read page by page
Key facts from this manual
Each line names its page in the PDF.
Allen-Bradley quick start for experienced users (publication 1772-10.1, March 1996) for setting up a basic PLC-2 family system with PLC-2/20 or PLC-2/30 processors. It walks through the I/O chassis, memory module, the 1771-AL local I/O adapter and I/O modules, power supply, remote I/O and the programming terminal, and ends with processor specifications.
- Module role
- 1771-AL: local I/O adapter module in a PLC-2 family system p. 5
- Mounting
- Left-most slot of the I/O chassis, secured with the locking latch p. 9
- Processor link
- Cable from the adapter's top socket to the I/O rack socket of the 1772-LH processor interface module p. 5, 9
- I/O chassis
- 1771-A1B, -A2B, -A3B, -A4B p. 5
- Processors
- 1772-LP2 (PLC-2/20), 1772-LP3 (PLC-2/30) p. 5
- Power supplies
- 1772-P1 series C, 120/220V AC; 1772-P4, 24V DC p. 5
- Memory modules
- 1772-ME8 (PLC-2/20); 1772-ME8, -ME16 (PLC-2/30) p. 5
- Remote I/O parts
- 1772-SD2 remote I/O scanner/distribution panel; 1771-ASB remote I/O adapter module p. 5
- Remote I/O distance
- 10,000 ft at 57.6K baud; 5,000 ft at 115.2K baud p. 13
- Remote I/O cable
- Allen-Bradley cat. no. 1770-CD p. 14
- Programming cables
- 1772-TC program panel interconnect cable; 1784-CP2 cable to a personal computer p. 15, 16
- PLC-2/20 specs
- PLC-2/20: 8K words memory, 0 to 60 C operating, 5 ms/1K scan time p. 17
- PLC-2/30 battery
- PLC-2/30: 2 alkaline D-size 1.5V batteries or 1 lithium D-size 3.7V battery p. 17
- PLC-2/30 I/O
- PLC-2/30: 896 I/O without complementary I/O, 1792 with p. 17
What this manual walks you through
- Setting the I/O chassis backplane switches p. 6
- Setting the power supply configuration plug and keying bands p. 7
- Grounding the I/O chassis p. 7
- Installing backup batteries and the memory module p. 8
- Installing the I/O adapter and I/O modules and wiring the field wiring arms p. 9, 10
- Installing and connecting the power supply p. 11
- Setting the remote I/O adapter switches and wiring its cable p. 13, 14
- Connecting a programming terminal or personal computer p. 15, 16
Good to know
- With backplane switch 1 ON, outputs stay in their last state on a fault and machine motion may continue. p. 6
- With this grounding layout, nothing may connect to EQUIP GND on the power supply terminal strips, to avoid ground loops. p. 7
- The 1772-P1 jumpers must be moved to run on 220/240V AC. p. 11
- On the remote I/O adapter wiring arm, terminals 4 through 10 must stay unconnected. p. 14
Questions this manual answers
Where does the 1771-AL go in the I/O chassis?
In the left-most slot of the I/O chassis, with a cable from its top socket to the I/O rack socket of the processor interface module. p. 9
Which I/O chassis does the PLC-2 quick start use with the 1771-AL?
The system in this quick start uses 1771-A1B, -A2B, -A3B and -A4B I/O chassis. p. 5
What batteries does the PLC-2/30 take?
Either 2 alkaline D-size 1.5V batteries or 1 lithium D-size 3.7V battery. p. 17
What does the last state switch on the PLC-2 I/O chassis do?
When ON, outputs of the chassis stay in their last state when a fault is detected; when OFF, they are deenergized. p. 6
What is the maximum PLC-2 remote I/O chassis distance?
The remote I/O adapter switch table gives up to 10,000 ft at 57.6K baud or 5,000 ft at 115.2K baud. p. 13
Contents
Chapters and sections
Each line opens the PDF at its page.
- 1772-10.1, PLC-2 Family Programmable Controllers, Quick Start for Experienced Users1
- 1772-10.1, Front Cover1
- 1772-10.1, Inside Cover2
- 1772-10.1, Table of Contents3
- 1772-10.1, Preface4
- 1772-10.1, 1 - Configure and Ground I/O Chassis6
- 1772-10.1, 2 - Install Memory Module8
- 1772-10.1, 3 - Install and Connect I/O Adapter Module and I/O Modules9
- 1772-10.1, 4 - Install and Connect Power Supply11
- 1772-10.1, 5 - Install and Connect Remote I/O Scanner and Adapter12
- 1772-10.1, 6 - Configure a Personal Computer15
- 1772-10.1, 7 - Specifications17
- 1772.10.1, Back Cover18
The whole text · 2 parts
Read the manual here as text
Its text as extracted from the PDF, unedited, in parts; each page opens the PDF at that page.
The file