Page 173
Open End Tools Open End tightening direction Set this option to the direction that fits your application. CW is selected for right hand threaded fasteners and CCW for left hand threaded. This setting is valid for all programmed Psets. Note! Parameter P240, Tool tightening direction, has no effect when you are running an OE tool. Performing Open End Tuning The Open End tune command is used to find the open position of the tool and measure the gear ratio. The tool rotates slowly in the reverse direction until its true open position at the mechanical stop in the Open End head is reached. The tool memory is updated with the measured gear ratio. The Open End tuning must be OK and you shall be prompted with the message “ Open End tuning succeeded”.
16.2.2 Step by step Configuration guide Right hand fasteners 1. 2. 3. 4. 5.
Mechanically assemble the right hand Open End head. Make sure that the Calibration value, D110, is correct. Check the Use open end, D120, check box. Make sure that the Open end tightening direction, D121, is set to CW. How you set the check box for Inverted motor rotation, D122, depends on the Open End head. If the Open End head (front part) changes the rotating direction, the Inverted motor rotation check box should be marked. If Inverted motor rotation is set the wrong way the tool may not operate in a correct manner and the mechanical stop may be damaged if a tightening is done. 6. Press Store. 7. Perform an Open End tune. Left hand fasteners 1. 2. 3. 4. 5.
Mechanically assemble the left hand Open End front part Make sure that the Calibration value, D110, is correct. Mark the Use open end, D120, check box. Make sure that the Open end tightening direction, D121, is set to CCW. How you set the check box for Inverted motor rotation depends on the Open End head. If the Open End head changes the rotating direction, the Inverted motor rotation check box should be marked. If Inverted motor rotation is set the wrong way the tool may not operate in a correct manner and the mechanical stop may be damaged if a tightening is done. 6. Press Store. 7. Perform an Open End tune. 173
Page 174
Page 175
Accessories
17
Accessories
17.1
I/O Bus
The benefit of using Serial Bus-based accessories is that they can be connected in series, from accessory to accessory rather than hard wiring each accessory to the Power Focus. This arrangement increases flexibility and affords quick installation. Power Focus 3000 uses 24V DC, 1 A to power the bus, which is also used to power external I/Os. If more current is needed, the bus must be powered externally. Every device has a 24 V DC input for this purpose.
17.2
I/O Expander
The I/O Expander enables the connection of several inputs and relays when more than those built- in are required. There are 8 inputs and 8 relays with the same functionality as the four builtin I/Os. Each input and relay can be configured individually. For more detailed information, see the I/O expander manual.
175
Page 176
Accessories
17.3
Selectors
A Selector is a socket tray with light diodes that can be used to guide the user through a JOB sequence. When using more than one Pset it is very convenient to use a selector. When a socket is lifted, the corresponding Pset will be selected. There are two different types of Selector: Selector 4 and Selector 8, the only difference being that Selector 4 has four sockets and Selector 8 has eight sockets. The Selector is also communicating on the I/O-bus For more detailed information read the Selector manual. Selector 4
17.4
RE-Alarm
The RE-alarm gives status information to users using lights and/or audible signals. The RE-Alarm is connected to the Power Focus on the I/O-bus. The RE Alarm is configured in the PF3000 and it is possible to configure the information you want to see. For more detailed information see The RE-alarm manual.
176
Selector 8
Page 177
Parameter List
18
Parameter List
18.1
Parameter set
P100 – 152 Programming P10x Control Strategies P100
Control strategy
Tq con: Controls and monitors torque. Tq con/ang mon: Controls torque and monitors torque and angle. Tq con/ang con (AND): Controls and monitors torque and angle. Ang con/tq mon: Controls angle and monitors angle and torque. DS con: Controls a DS-type tool. Reverse angle: Controls and monitors angle when tool is used in reverse direction. Click wrench: A digital input signals the completion of an arbitrary activity. No tightening is performed. Rotate spindle forward: Rotates the spindle a set number of degrees in the forward direction. Tq con/ang con (OR): Controls and monitors torque or angle, whichever target is reached first. Rotate spindle reverse: Rotates the spindle a set number of degrees in the reverse direction.
177
Page 178
Parameter List P101
Tightening strategy
One stage: Tightening is performed in one stage. Control is done from Cycle start until final target is reached. Two stage: Tightening is performed in two stages. Control is done from Cycle start until first target. The tool stops and accelerates to a lower speed, and controls until final target is reached. Quick step: Quick step is a variant of two-stage tightening. The difference is that speed changes directly from the higher speed to the lower speed without stopping.
P104
Rundown angle
Ergoramp: This is a two stage strategy with a constant increase in torque during the second stage of the tightening. Gives the operator constant reaction torque in the tool regardless of rundown speed. Rundown angle is optional. If chosen, there are two alternatives. If Rundown angle is set From start, the rundown phase starts when the tool trigger is pressed, and continues until the torque value reaches Rundown complete. If Rundown angle is set From cycle start, the rundown phase starts when the torque level exceeds the Cycle start torque level and continues until Rundown Complete is reached. This parameter connects the Zoom Step function. Zoom Step strategy combines quick tightening with high precision and low scatter.
P105
Zoom Step
P106
PF2000 compatible
This parameter changes the characteristics of the Power Focus 3000 similar to a Power Focus 2000. Acceleratio n and ramp functions are affected. Programming of parameters is otherwise not affected. If this function is selected, the full capacity of the tool cannot be used. The maximum torque will not be affected.
P107
Click wrench no.
This parameter is only used if Click wrench is chosen as Control Strategy [P100]. It is used to connect the click wrench strategy to any one of four defined digital inputs.
178
Page 179
Parameter List P11x Torque Parameters P110
Cycle start
Defines the starting level for a tightening cycle.
P111
First target
Defines the level at which the changeover takes place between the first and second stage in a two stage tightening or Quick step.
P112
Final tq min
Defines the lower torque limit for OK tightening.
P113
Final Target
Defines the desired final torque value when a torque control strategy is used. The tool shuts off when the final Target value is reached.
P114
Final tq max
Defines the upper torque limit for OK tightening. The tool shuts of if the torque value exceeds this value.
P115
Cycle complete
This parameter indicates the torque level when the tightening cycle is complete. When the torque falls below this level, a timer, [P141] End time, is started.
P116
Rundown complete
Tightening is complete when the torque has fallen below the level for [P115] Cycle complete and when [P141] End time has been reached. The torque level when the rundown phase is finished. (Only used if Rundown angle [P104] is selected).
P12x Angle Parameters P120
Start final angle
Angle measurement starts when the torque value exceeds the Start final angle value. Start final angle must be selected equal to or greater than [P110] Cycle start.
P121
Measure angle to
Defines to what point the final angle shall be measured. The start point is always [P120] Start final angle. The end point can be selected to the following alternatives: Tq peak: Gives the angle at the highest torque value. Angle peak: Gives the highest angle value during the tightening. Cycle complete: Measures the angle to cycle complete.
179
Page 180
Parameter List P122
Final angle min
This parameter indicates the lower limit for final angle. If the final angle falls below this level, the tightening is considered NOK.
P123
Target angle
Indicates the target value for the angle in degrees when angle control is used. When this value is reached the tool is turned off.
P124
Final angle max
Defines the upper limit for the tightening angle. If the angle exceeds this level the tightening is considered NOK.
P125
Rundown angle min This parameter indicates the min limit value for Rundown angle. If the angle is smaller than this value at rundown complete, “low” is indicated and the tool will shut off.
P126
Rundown angle max
This parameter indicates the max limit value for Rundown angle. If the angle is larger than this value, “high” is indicated and the tool will shut off.
P13x Speed and Ramp P130
Soft start speed
Defines the tool speed during the soft start interval. Allowed interval 5% - 30% of maximum tool speed.
P131
Step 1 speed
Defines the first step speed. Speed is adjustable between 5% -100% of max tool speed.
P132
Step 2 speed
Defines the second step speed. Speed is adjustable between 5% - 40% of the tool max speed. If two stage tightening is used the speed in the second step will increase according to the Step 2 ramp. If Quick step is used the tool changes to the step 2 speed directly without using a ramp.
P133
Loosening speed
Defines speed during loosening. The value is adjustable between 10% – 100%.
P134
Loosening ramp
Defines acceleration during loosening. The value is adjustable between 0% – 100%. A low percentage gives fast acceleration.
180
Page 181
Parameter List P135
Step 1 ramp
Defines Step 1 acceleration. The value is adjustable between 0% – 100%. A low percentage gives fast acceleration (0% is normally used).
P136
Step 2 ramp
Defines Step 2 acceleration. A low percentage gives fast acceleration (0-100%).
P137
Ergoramp
P138
Zoom step speed
Defines the acceleration. The value is adjustable between 0% – 100%. Only used if Ergoramp is chosen as the tightening strategy [P101]. Defines the speed used for Zoom step strategy. The value is a percentage of the tool’s max speed. The value is adjustable between 2% - 20%. To set Zoom step speed, parameter [P105] Zoom step must be active.
P14x Time Parameters P141
End time
This parameter defines how long, after the torque level has dropped below [P115] Cycle complete, that Power Focus should remain active. Default is 0.2 seconds, which is sufficient in most cases. The value is adjustable between 0.1 s – 5.0 s.
P142
Soft start time
During this time, from the moment that the tool trigger is pressed, the spindle rotates very slowly. This gives the operator a chance to fit the socket on the screw. The value is adjustable between 0.0 s – 5.0 s. Default is 0.2 seconds.
P143
Tool idle time
P144
Cycle abort timer
Defines the tool idling time between stages in a Multistage tightening. The value is adjustable between 0 s – 32 s. Default is 0 seconds. If the tool does not reach its shut off point, this timer will shut it off. The timer is activated when the tool trigger is pressed. The value is adjustable between 0.1 s – 60.0 s. Default is 30 s.
181
Page 182
Parameter List P15x Batch count P150
Batch count
Activates a function that measures how many times a tightening is repeated. It must be determined from where the Batch size value should be read, if the Batch count is activated. Note! If batch count is used in Job this parameter shall be set to off. Off: Batch count is not used. Pset: Use Psets Batch size. FieldBus: An external source decides Batch size via FieldBus. Ethernet/Serial: An external source decides Batch size via Ethernet or serial interface.
P151
Batch size
The size can be 1 – 99. To set Batch size, parameter [P150] Batch count must be active.
P152
182
Lock at batch OK
If this parameter is chosen, the tool will be locked when reaching “Batch OK”. Batch OK is reached when the number of correct tightenings is equal to Batch size.