Page 41

Chapter 1: Getting Started

Step 2: Install the CPU and I/O Modules Insert the CPU and I/O into the base. The CPU must be inserted into the first slot of the base (next to the power supply).

1 2 • the unit square to the base, slide it in using the upper and lower guides. 3 • Gently push the unit back until it is firmly seated in the backplane. 4 • Secure the unit to the base by pushing in the retainer clips. Placement of discrete, analog and relay modules is not critical and may go in any slot in any base; however, for this example, install the output module in the slot next to the CPU and the 5 input module in the next slot. Limiting factors for other types of modules are discussed in Chapter 4, System Design and Configuration. You must also make sure you do not exceed the 6 power budget for each base in your system configuration. Power budgeting is also discussed in Chapter 4. 7 Step 3: Remove Terminal Strip Access Cover 8 Remove the terminal strip cover. It is a small strip of clear plastic that is located on the base 9 power supply. Step 4: Add I/O Simulation 10 To finish this quick start exercise or study other examples in this manual, you will need to install an input simulator module (or wire an input switch as shown below), and add an output 11 module. Using an input simulator is the quickest way to get physical inputs for checking out the system or a new program. To monitor output status, any discrete output module will work. Wire the switches or other field devices prior to applying power to the system to ensure a 12 point is not accidentally turned on during the wiring operation. This example uses DC input 13 14 A B C and output modules. Wire the input module, X0, to the toggle switch and 24VDC auxiliary D power supply on the CPU terminal strip as shown. Chapter 2, Installation, Wiring, and • unit has a plastic retaining clip at the top and bottom. Slide the retainer clips to the out position before installing the module.

Retaining Clips

CPU must reside in first slot!

Lift off

Toggle switch

Output Module

Input Module

Specifications, provides a list of I/O wiring guidelines.

DL205 User Manual, 4th Edition, Rev. D

1-11

Page 42

Chapter 1: Getting Started

1 2 3 4 5 6 7 8 9 10 11 12 13 14 A B C D 1-12

Step 5: Connect the Power Wiring Connect the wires as shown. Observe all precautions stated earlier in this manual. For details on wiring see Chapter 2 Installation, Wiring, and Specifications. When the wiring is complete, replace the CPU and module covers. Do not apply power at this time.

Line Neutral Ground

Step 6: Connect the Programmer Either connect the programming cable connected to a computer loaded with DirectSOFT Programming Software or a D2-HPP Handheld Programmer (comes with programming cable) to the top port of the CPU.

Step 7: Switch On the System Power Apply power to the system and ensure the PWR indicator on the CPU is on. If not, remove power from the system, check all wiring and refer to the troubleshooting section in Chapter 9 for assistance.

Step 8: Enter the Program Slide the switch on the CPU to the STOP position (250–1/260 only) and then back to the TERM position. This puts the CPU in the program mode and allows access to the CPU program. Edit a DirectSOFT program using the relay ladder diagram below and load it into the PLC. If using an HPP, the PGM indicator should be illuminated on the HPP. Enter the following keystrokes on the HPP: NOTE: It is not necessary for you to configure the I/O for this system since the DL205 CPUs automatically examine any installed modules and establish the correct configuration.

X0

Handheld Program Keystrokes $

STR

GX OUT

B C

1 2

Y0

ENT ENT

END

After entering the example program put the CPU in the RUN mode with DirectSOFT or after entering the program using the HPP, slide the switch from the TERM position to the RUN position and back to TERM. The RUN indicator on the CPU will come on indicating the CPU has entered the run mode. If not, repeat Step 8 ensuring the program is entered properly or refer to the troubleshooting guide in Chapter 9. During Run mode operation, the output status indicator “0” on the output module should reflect the switch status. When the switch is on, the output should be on. DL205 User Manual, 4th Edition, Rev. D

Page 43

Chapter 1: Getting Started

Steps to Designing a Successful System Step 1: Review the Installation Guidelines Always make safety your first priority in any system application. Chapter 2 provides several guidelines that will help provide a safer, more reliable system. This chapter also includes wiring guidelines for the various system components.

Step 2: Understand the CPU Set-up Procedures The CPU is the heart of your automation system and is explained in Chapter 3. Make sure you take time to understand the various features and set-up requirements.

Step 3: the I/O System Configurations It is important to understand how your local I/O system can be configured. It is also important to understand how the system Power Budget is calculated. This can affect your I/O placement and/or configuration options. See Chapter 4 for more information.

16pt Input

8pt Input

8pt Output

X0 X17

X20

Y0 Y7

X27

Step 4: the I/O Module Specifications and Wiring Characteristics Many different I/O modules are available with the DL205 system. Chapter 2 provides the specifications and wiring diagrams for the discrete I/O modules.

NOTE: Analog and specialty modules have their own manuals and are not included in this manual.

Step 5: Understand the System Operation Before you begin to enter a program, it is very helpful to understand how the DL205 system processes information. This involves not only program execution steps, but also involves the various modes of operation and memory layout characteristics. See Chapter 3 for more information.

Power up Initialize hardware Check I/O module config. and verify

DL205 User Manual, 4th Edition, Rev. D

1 2 3 4 5 6 7 8 9 10 11 12 13 14 A B C D

1-13

Page 44

Chapter 1: Getting Started

Step 6: Review the Programming Concepts

1 2 3 4 5 6 7 8 9 10 11 12 13 14 A B C D 1-14

The DL205 provides four main approaches to solving the application program, including the PID loop task depicted in the next figure. • diagram style programming is the best tool for solving boolean logic and general CPU register/ accumulator manipulation. It includes dozens of instructions, which will augment drums, stages and loops. • DL250-1 and DL260 have four timer/event drum types, each with up to 16 steps. They offer both time and/or event-based step transitions. Drums are best for a repetitive process based on a single series of steps. • programming, called RLLPLUS, is based on state-transition diagrams. Stages divide the ladder program into sections which correspond to the states in a flow chart of your process. • DL260 PID loop operation uses set-up tables to configure 16 loops. The DL250-1 PID loop operation uses setup to configure 4 loops. Features include: auto tuning, alarms, SP ramp/soak generation and more. Standard RLL Programming (see Chapter 5) X0

Timer/Event Drum Sequencer (see Chapter 6)

LDD V1076 CMPD K309482

SP62

Y0 OUT

Stage Programming (see Chapter 7) Push–UP

PID Loop Operation (see Chapter 8)

RAISE

SP DOWN

LIGHT

UP

+ –

PID

Process

PV LOWER

Push– DOWN

Step 7: Choose the Instructions Once you have installed the system and understand the theory of operation, you can choose from one of the most powerful instruction sets available.

Step 8: the Maintenance and Troubleshooting Procedures Equipment failures can occur at any time. Switches fail, batteries need to be replaced, etc. In most cases, the majority of the troubleshooting and maintenance time is spent trying to locate the problem. The DL205 system has many built-in features that help you quickly identify problems. Refer to Chapter 9 for diagnostics. DL205 User Manual, 4th Edition, Rev. D

TMR

K30

T1

CNT CT3 K10

Page 45

Installation, Wiring and Specifications

Chapter

12

In This Chapter: Safety Guidelines...............................................................................2–2 Mounting Guidelines.........................................................................2–5 Installing DL205 Bases......................................................................2–10 Installing Components in the Base.................................................. 2–12 Base Wiring Guidelines.....................................................................2–13 I/O Wiring Strategies........................................................................2–14 I/O Modules Position, Wiring, and Specification...............................2–26 Glossary of Specification Terms.........................................................2–51

Page 46

Chapter 2: Installation, Wiring and Specifications

1 2 3 4 5 6 7 8 9 10 11 12 13 14 A B C D

Safety Guidelines

2-2

NOTE: Products with CE marks perform their required functions safely and adhere to relevant standards as specified by CE directives, provided they are used according to their intended purpose and that the instructions in this manual are adhered to. The protection provided by the equipment may be impaired if this equipment is used in a manner not specified in this manual. A listing of our international affiliates is available on our Web site: http://www.automationdirect.com WARNING: Providing a safe operating environment for personnel and equipment is your responsibility and should be your primary goal during system planning and installation. Automation systems can fail and may result in situations that can cause serious injury to personnel and/or damage equipment. Do not rely on the automation system alone to provide a safe operating environment. Sufficient emergency circuits should be provided to stop either partially or totally the operation of the PLC or the controlled machine or process. These circuits should be routed outside the PLC in the event of controller failure, so that independent and rapid shutdown is available. Devices, such as “mushroom” switches or end of travel limit switches, should operate motor starter, solenoids, or other devices without being processed by the PLC. These emergency circuits should be designed using simple logic with a minimum number of highly reliable electromechanical components. Every automation application is different, so there may be special requirements for your particular application. Make sure to follow all national, state, and local government requirements for the proper installation and use of your equipment.

Plan for Safety The best way to provide a safe operating environment is to make personnel and equipment safety part of the planning process. You should examine every aspect of the system to determine which areas are critical to operator or machine safety. If you are not familiar with PLC system installation practices, or your company does not have established installation guidelines, you should obtain additional information from the following sources. •, The National Electrical Manufacturers Association, located in Washington, D.C., publishes many different documents that discuss standards for industrial control systems. You can order these publications directly from NEMA. Some of these include: ICS 1, General Standards for Industrial Control and Systems ICS 3, Industrial Systems ICS 6, Enclosures for Industrial Control Systems

•, The National Electrical Code provides regulations concerning the installation and use of various types of electrical equipment. Copies of the NEC Handbook can often be obtained from your local electrical equipment distributor or your local library. • and State Agencies, many local and state governments have additional requirements above and beyond those described in the NEC Handbook. Check with your local Electrical Inspector or Fire Marshall office for information.

DL205 User Manual, 4th Edition, Rev. D

Page 47

Chapter 2: Installation, Wiring and Specifications

Three Levels of Protection

1 2 • Emergency stop switch for disconnecting system power • Mechanical disconnect for output module power 3 • Orderly system shutdown sequence in the PLC control program 4 Emergency Stops It is recommended that emergency stop circuits be incorporated into the system for every 5 machine controlled by a PLC. For maximum safety in a PLC system, these circuits must not be wired into the controller, but should be hardwired external to the PLC. The emergency stop switches should be easily accessed by the operator and are generally wired into a master 6 control relay (MCR) or a safety control relay (SCR) that will remove power from the PLC I/O system in an emergency. 7 MCRs and SCRs provide a convenient means for removing power from the I/O system during an emergency situation. By de-energizing an MCR (or SCR) coil, power to the input 8 (optional) and output devices is removed. This event occurs when any emergency stop switch opens. However, the PLC continues to receive power and operate even though all its inputs 9 and outputs are disabled. The MCR circuit could be extended by placing a PLC fault relay (closed during normal PLC operation) in series with any other emergency stop conditions. This would cause 10 the MCR circuit to drop the PLC I/O power in case of a PLC failure (memory error, I/O communications error, etc). 11 12 13 14 A B C D The publications mentioned provide many ideas and requirements for system safety. At a minimum, you should follow these regulations. Also, you should use the following techniques, which provide three levels of system control.

Use E-Stop and Master Relay

Guard Limit Switch

Emergency Stop

E STOP

Power On

Guard Limit

Master Relay

Master Relay Contacts

Master Relay Contacts

Output Module

Saw Arbor

To disconnect output module power

DL205 User Manual, 4th Edition, Rev. D

2-3

Page 48

Chapter 2: Installation, Wiring and Specifications

1 2 3 4 5 6 7 8 9 10 11 12 13 14 A B C D 2-4

Emergency Power Disconnect A properly rated emergency power disconnect should be used to power the PLC-controlled system as a means of removing the power from the entire control system. It may be necessary to install a capacitor across the disconnect to protect against a condition known as “outrush.” This condition occurs when the output Triacs are turned off by powering off the disconnect, thus causing the energy stored in the inductive loads to seek the shortest distance to ground, which is often through the Triacs. After an emergency shutdown or any other type of power interruption, there may be requirements that must be met before the PLC control program can be restarted. For example, there may be specific register values that must be established (or maintained from the state prior to the shutdown) before operations can resume. In this case, you may want to use retentive memory locations, or include constants in the control program to ensure a known starting point.

Orderly System Shutdown Ideally, the first level of fault detection is the PLC control program, which can identify machine problems. Certain shutdown sequences should be performed. The types of problems are usually things such as jammed parts, etc., that do not pose a risk of personal injury or equipment damage. WARNING: The control program must not be the only form of protection for any problems that may result in a risk of personal injury or equipment damage.

Class 1, Division 2, Approval

Jam Detect

Turn off Saw RST RST Retract Arm

This equipment is suitable for use in Class 1, Zone 2, Division 2, groups A, B, C and D or non-hazardous locations only. WARNING: Explosion Hazard! Substitution of components may impair suitability for Class 1, Division 2. Do not disconnect equipment unless power has been switched off or area is known to be nonhazardous. WARNING: Explosion Hazard! Do not disconnect equipment unless power has been switched off or the area is known to be non-hazardous. WARNING: All models used with connector accessories must use R/C (ECBT2) mating plug for all applicable models. All mating plugs shall have suitable ratings for device. WARNING: This equipment is designed for use in Pollution Degree 2 environments (installed within an enclosure rated at least IP54). WARNING: Transient suppression must be provided to prevent the rated voltage from being exceeded by 140%.

DL205 User Manual, 4th Edition, Rev. D

Page 49

Chapter 2: Installation, Wiring and Specifications

Mounting Guidelines

1 2 NOTE: If you are using other components in your system, refer to the appropriate manual to determine how 3 those units can affect mounting dimensions. Base Dimensions 4 The following information shows the proper mounting dimensions. The height dimension is the same for all bases. The depth varies depending on your choice of I/O module. The length 5 varies as the number of slots increase. Make sure you have followed the installation guidelines for proper spacing. 6 Mounting depths with: A D2–DSCBL–1 5.85” 7 C (148mm) on port 2 32pt. ZIPLink cable or 4.45” 8 3.54” 2.99” base exp. unit cable (113mm) (90mm) (76mm) 9 3.62” 12 or 16pt I/O (92mm) 2.95” B 10 4 or 8pt. I/O (75mm) with D2–EM Expansion Unit 11 D 12 13 DIN Rail slot. Use rail conforming to DIN EN 50022. 14 D A B C A (Width with Exp. (Base Total Width) (Mounting Hole) (Component Width) Base Unit) Inches Millimeters Inches Millimeters Inches Millimeters Inches Millimeters B C D Before installing the PLC system, you will need to know the dimensions of the components considered. The diagrams on the following pages provide the component dimensions to use in defining your enclosure specifications. Remember to leave room for potential expansion.

3-slot 4-slot 6-slot 9-slot

6.77 7.99 10.43 14.09

172 203 265 358

6.41 7.63 10.07 13.74

163 194 256 349

5.8 7.04 9.48 13.14

148 179 241 334

7.24 8.46 10.90 14.56

DL205 User Manual, 4th Edition, Rev. D

184 215 277 370

2-5

Page 50

Chapter 2: Installation, Wiring and Specifications

It is important to design your panel properly to help ensure the DL205 products operate within their environmental and electrical limits. The system installation should comply with all appropriate electrical codes and standards. It is important the system also conforms to the operating standards for the application to ensure proper performance. The diagrams below reference the items in the following list.

OK

Airflow

1. Mount the bases horizontally to provide proper ventilation. 2. you place more than one base in a cabinet, there should be a minimum of 7.2” (183mm) between bases. 3. a minimum clearance of 2” (50mm) between the base and all sides of the cabinet. There should also be at least 1.2” (30mm) of clearance between the base and any wiring ducts. 4. must be a minimum of 2” (50mm) clearance between the panel door and the nearest DL205 component. NOTE: The cabinet configuration below is not suitable for EU installations. Refer to Appendix I, European Union Directives. Temperature Probe

2” 50mm min. 2” 50mm min.

DL205 CPU Base 2” 50mm min.

Power Source

2” 50mm min.

Panel BUS Bar Panel Ground Ground Braid Terminal Earth Ground Copper Lugs Star Washers

Star Washers

2-6

DL205 User Manual, 4th Edition, Rev. D

Panel or Single Point Ground Note: there is a minimum of 2” (50mm) clearance between the panel door or any devices mounted in the panel door and the nearest DL205 component

Safety Guidelines

1 2 3 4 5 6 7 8 9 10 11 12 13 14 A B C D