Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeContact

The text of a manual · part 5 of 35

Series One Programmable Controllers, Series One/One Plus User's Manual: Chapter 3 Installation, pages 43 to 50

Pages 43 to 50 of 300, from Series One Programmable Controllers, Series One/One Plus User's Manual

The original document is the PDF (40 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the GE Fanuc IC610CPU105A, GE Fanuc IC610CPU105C, Fanuc IC610CPU105A, GE IC610CPU105A, Fanuc IC610CPU105C and GE IC610CPU105C

Page 43

Chapter I 31

3

Installation

GEK-90842

Specifications for Installation The Series One and Series One Plus PC can be easily installed in any NEMA panel or similar metal surface. Figure 3-1 provides details on the mounting of up to three racks except for input voltage requirements to form a single PC system. Since a completed &lot rack weighs less than five pounds (lo-slot rack, less than 7 pounds), it can be easily installed by one technician. Table 3-1 provides specifications to be met during installation.

Table 3-l. Series One Installation Specifications Rack size 11.4“ x 4.7” x 5.5“ (290 x 120 x 14Omm) 18.3” x 4.7“ x 5.5” (465 x 120 x 14Omm)

S-slot lo-slot Completed Rack Weight (less wiri@

0’ to 60°C (32” to 14OOF’)

Ambient Temperature Storage Temperature

-10’ to 7oOC (14’ to 158°F) 5-95s (Non-CorKieIlsing)

HUmidiQ

AC Power Required: 1C61OCHS101/110/l30 Vohage FrequeW

Maximum Load output current

Maximum Individual DC Power Required IC16OCHSll4/l34 Voltage Ripple output current

Maximum Individual Maximum, Total (All vohRges) Run relay

4.5 lbs (2.0 Kg), 5-Slot 6.5 lbs (2.9 Kg), lo-slot

Rack 115v/230 v ac 15% 47-63 Hz 30 VA, CHSlOl/llO (70 VA, CHS130) 1.4 A at 5 V dc (0.4 A CHSlOl) 0.8 A at 9 V dc, CHSllO (0.6 A, CHSlOl; 1.7 A, CHS130) 0.5 A at 24 V dc, (0.2 A, CHSlOl)

20.5 - 30 V dc (100% of capacity used) 18 - 30 V dc (90% of capacity used) 10% of Input Voltage 1.4 A at 5 V dc 0.8 A at 9 V dc, CHS114 (1.7 A, CHS134) 0-4 A at 24 V &, CHSll4 (0.5 A, CHS134) 2.2 A, CHS114 (2.9 A, CHS134) 250 V, 4 amp, Resistive Load (Not Present on CHSlOl)

Vibration

MestsJISC0911IIBClass3

Shock

Tested to ML STD 810C Method 514.2 Meets JIS C 0912 Meets NE&IA ICS3-304

Noise Immunity

Page 44

Installation GEK-90842

W7.52 t

*#18.3

(445) **

C465,

FOR lO-SLOT

CHASSIS

11.41,,

-AL 12 PLACES

MAX:

MIN: 7.2 (183)

4" 4

,3:40,

MIN MMENsK)(ys

IN PARENTHESES

ARE MI MUMETERS,

OTHERS IN INCHES.

Figure 3-l. Rack Mounting Dimensions for Proper Heat Dissipation

Installation Unpack each unit candidly and retain any instructions shipped with the units. Two spare fuses are attached to the top of each rack; they should be removed and retained for future use. The racks can be installed either with no modules or with modules installed. The following steps will assist in organizing and simplifying the installation of a Series One or Series One Plus PC System.

1 Using the rack as a template, l

2 . Drill the four mounting tapped holes).

ma& where mounting holes are to be drilled.

holes (l/4“ (6mm) if using pass through bolts, or 3/16”

3 . Insert top 2 bolts (3/16“ X l-1/2” washers, lock washers and nuts.

or 5mm X 4Omm),put unit in place, ,. CR

(5mm) if using and loosely secure with

Page 45

Installation GEK-90842

4. Tap holes and insert top two bolts.

Place unit onto mounting bolts and loosely secure.

NOTE men inserting the 2 top bolts, attach the green jumper as shown in figure 3-2. This jumper wire is packed with each rack and provides a method of groundingthe rack when an earth ground (such as the shield or hard wire in the power cord) is also connected to a mounting bolt. 5. The power supply ground connection is made to one of the mounting bolts (step 3 or 4 above). A jumper wire is included with each rack to interconnect the mounting brackets. The “C” terminals on the power supplies are interconnected when more than one rack is used. Otherwise, the “C” terminal is not connected to anything in a single rack system.

a40147 jumper wtre tncluded wtth

Ix> base star washer

W to 8n earth ground

Figure 312. Recommended Rack Grounding 6. Complete the installation of the bottom two bolts and tighten supplies are shipped installed in each base.

7. If additional racks are to be used, repeat steps l-4 above. 15 .

all mounting hardware.

Power

If only one base unit is used, go to step

NOTE When drilling or tapping holes ensure that work area before installing base units chips do not enterunit afready installed. clear

8. Obtain flat ribbon cable used to interconnect racks. Locate end marked “To CPU”, remove dust cover from bottom connector of first (CPU) rack, and insert cable co~ector (see figure 3-d) fully into receptacle until locking tabs capture connector.

9. Fold cable as shown on figure 3-7. Remove dust cover from top connector of second rack and insert opposite end of cable marked “To Expander.” 10. Secure cable in place with wire wraps or cable ties.

Page 46

34m

Installation GEL90842

11 . If a third rack is used, repeat steps 8-10 with CPU end of cable *in bottom connector on second rack and Expander end in top connector of third and last rack. 12 . If a lo-slot rack (IC61OCHS130 or IC61OCHS134)) is to be included in a system, it can be mounted on standard mounting rails in 19 inch cabinets and consoles by attaching the rack mount brackets. Two adapter brackets and hardware required for assembly are included in the bracket package, IC6lOCHS191. a4021 4

I ohmmoNs IN INCHES, WLLIMnERS ARE W PARENTHESIS

I

Figure 3-3. 10 Slot Rack, 19 Inch Mounting Dimensions

’ a40280

Figure 3-4. I/O Expansion Cable Connection 13. Unused rack connectors such as at the top of the CPU unit and the bottom of the last rack should retain their dust covers.

Page 47

35m

Installation GE&90842

14 . Inside each 5-slot rack at the rear of the leftmost module slot is a two position switch. On the CPU unit, this switch must be positioned towards the left. On the first expander it must be towards the right. If a third rack is used, the switch must be towards the left again. An exception to the described switch settings is when a 5-slot rack is used as an expansion rack in a Series One Plus system, where the CPU rack is a 10.slot rack. In this case, the switch must be positioned to the left This switch is not included in the IC6lOCHSlOl rack, since it cannot be used as an expansion rack.

All switches must be set properly. The Series One or Series One Plus PC may not function correctly if any switch is not in the correct position. 15 . The lo-slot racks, IC61OCHS130/134 have two bridge connectors on the back plane which must be configured. Bridge connector SWl, located between slots 3 and 4, has 2 positions EXP and CPU. The jumper must be positioned on the corresponding pins to specify whether the rack is a CPU rack or an Expansion rack. Bridge connector SW2, located between slots 9 and 10, selects the address to be assigned to slot 10 and the expansion rack slots. The selections are either 100 EXP or 700. Figure 3-5 shows the location of SW1 and SW2.

a40794 SW2 700 loo EXP BRIDGE-CONNECTOR I, : s ml3 : -Bf?IDGE-CONNECTOR 2

A

Fiire

3-5. I/O Addressing

SW1 EXP CPU --

A

IC6lOCHSl30 OR IC6~OCHSi34

Switches in Series One Plus 10 Slot Racks

Page 48

360

Installation GEK-90842

16. Example of SW1 and SW2 settings are shown below in figure 3-6.

a40795 SW2 Ii00 EXP)

SW2 1700 EXPI

SET TO LEFT POSITION

SW2 t100 ExPr

SWI IEXPI

Figure 3-6. Examples of Rack Configuration Switch Setting Series One Plus

Page 49

37I

Installation GEK-90842

ET- Its v&c Itsv -

MEUT

1

23ovAC

23OvWEUT

+ 24 VDC -2uDC

PC

1

COMMON CONNECTION

'

Figure 3-7. Typical Installation Dimensions NOTE Ground Connection should be made to mounting bracket, not to the terminal strip.

CPU 17. Locate the CPU module (see figure 3-8) and set switches and shorting bridge connectors per table 3-2. If additional CMOS or PROM memory is to be installed, now is the time to do it. For detailed instructions, see Chapter 7. 18. The CPU module must be installed adjacent to the power supply in the first or topmost rack.

Page 50

38m

Installation GEK-90842 a40281 s2

Figure 3-8. CPU Module Table 3-2. CPU Option Settings SWITCH

1 - POWER

OFF ON

SWITCH

UP FUNCTIONS

2 - MEMORY

PROM CMOS

OFF ON

Clear coils Retain Coils

TYPE

NOTE ON is Towards the Faceplate. Factory setting is: Clear Coils and Select CMOS memory. Retain Coils affects 340-373 only. Copters and Shift Registers are always retentive.

Table 3-3. Memory Size MEMORY

CONNECT

SIZE

JUMPERS BETWEEN

PINS

ABandDE B Cad-i? ABandDE

700 words CMOS 1724 words CMOS 1724 Words PROM

I

CAUTION

I

Remove jumper EF before installing PROM. Battery will discharge in a very short time if is not disconnected.

E

NOTE Pin A is towards the faceplate. Factory setting is: 700 words CMOS, 1724 words PROM (same Setting)