For the Hitachi L100-040HFU

Page 63

L100 Inverter

2–19

Uncover the Inverter Vents 8

Step 8: After mounting and wiring the inverter, remove any covers from the inverter housing. This includes material over the side ventilation ports. Remove the square cover panel at the top of the housing. WARNING: Make sure the input power to the inverter is OFF. If the drive has been powered, leave it OFF for five minutes before continuing.

Powerup Test 9

Step 9: After wiring the inverter and motor, you’re ready to do a powerup test. The procedure that follows is designed for the first-time use of the drive. Please verify the following conditions before conducting the powerup test: • You have followed all the steps in this chapter up to this step. • The inverter is new, and is securely mounted to a non-flammable vertical surface • The inverter is connected to a power source and motor. • No additional wiring of inverter connectors or terminals has been done. • The power supply is reliable, and the motor is a known working unit, and the motor nameplate ratings match the inverter ratings. • The motor is securely mounted, and is not connected to any load.

Goals for the Powerup Test If there are any exceptions to the above conditions at this step, please take a moment to take any measures necessary to reach this basic starting point. The specific goals of this powerup test are: 1. Verify that the wiring to the power supply and motor is correct. 2. Demonstrate that the inverter and motor are generally compatible. 3. Give a brief introduction to the use of the built-in operator keypad. The powerup test gives you an important starting point to ensure a safe and successful application of the Hitachi inverter. We highly recommend performing this test before proceeding to the other chapters in this manual.

Inverter Mounting and Installation

The top housing cover is held in place by four locking tabs. To remove the cover, squeeze two corners together and push a small screwdriver under one side as shown, while pulling upward. Hold the screwdriver at the angle shown, and DO NOT push the screwdriver or any object through ventilation openings and into the inverter.

Page 64

2–20

Powerup Test

Pre-test and Operational Precautions The following instructions apply to the powerup test, or to any time the inverter is powered and operating. Please study the following instructions and messages before proceeding with the powerup test. 1. The power supply must have fusing suitable for the load. Check the fuse size chart presented in Step 5, if necessary. 2. Be sure you have access to a disconnect switch for the drive input power if necessary. However, do not turn OFF power during inverter operation unless it is an emergency.

Inverter Mounting and Installation

3. Turn the front panel potentiometer to the MIN position (fully counter-clockwise). CAUTION: The heat sink fins will have a high temperature. Be careful not to touch them. Otherwise, there is the danger of getting burned. CAUTION: The operation of the inverter can be easily changed from low speed to high speed. Be sure to check the capability and limitations of the motor and machine before operating the inverter. Otherwise, there is the danger of injury. CAUTION: If you operate a motor at a frequency higher than the inverter standard default setting (50Hz/60Hz), be sure to check the motor and machine specifications with the respective manufacturer. Only operate the motor at elevated frequencies after getting their approval. Otherwise, there is the danger of equipment damage and/or injury. CAUTION: Check the following before and during the powerup test. Otherwise, there is the danger of equipment damage. • Is the shorting bar between the [+1] and [+] terminals installed? DO NOT power or operate the inverter if the jumper is removed. • Is the direction of the motor rotation correct? • Did the inverter trip during acceleration or deceleration? • Were the rpm and frequency meter readings as expected? • Were there any abnormal motor vibrations or noise?

Powering the Inverter If you have followed all the steps, cautions and warnings up to this point, you’re ready to apply power. After doing so, the following events should occur: • The POWER LED will illuminate. • The numeric (7-segment) LEDs will display a test pattern, then stop at 0.0. • The Hz LED will be ON. If the motor starts running unexpectedly or any other problem occurs, press the STOP key. Only if necessary should you remove power to the inverter as a remedy. NOTE: If the inverter has been previously powered and programmed, the LEDs (other than the POWER LED) may illuminate differently than as indicated above. If necessary, you can initialize all parameters to the factory default settings. See “Restoring Factory Default Settings” on page 6–8.

Page 65

2–21

L100 Inverter

Using the Front Panel Keypad Front Panel Introduction Please take a moment to familiarize yourself with the keypad layout shown in the figure below. These are the visible controls and indicators when the front panel door is closed. Power LED

Parameter Display HITACHI

Run/Stop LED

5 0.0

RUN

Program/Monitor LED

RUN

A

Potentiometer Enable LED

STOP

RESET MIN

Run Key

Display Units Hertz / Amperes LEDs

Hz

MAX

Stop/Reset Key

Potentiometer

The display is used in programming the inverter’s parameters, as well as monitoring specific parameter values during operation. Many functions are applicable only during the initial installation, while others are more useful for maintenance or monitoring.

Parameter Editing Controls Now, open the front panel (half-door) for second-level access to reveal additional operator keys for parameter editing as shown to the right. In normal operation after installation, parameter editing is unnecessary, so these controls are hidden from view. The front panel controls and indicators are described as follows: • Run/Stop LED - ON when the inverter output is ON and the motor is developing torque (Run Mode), and OFF when the inverter output is OFF (Stop Mode).

POWER

HITACHI

5 0.0

RUN PRG

RUN

Hz A

STOP

RESET MAX

MIN

FUNC. 1

Function Key

2

STR

Up/Down Keys

Store Key

• Program/Monitor LED - This LED is ON when the inverter is ready for parameter editing (Program Mode). It is OFF when the parameter display is monitoring data (Monitor Mode). • Run Key Enable LED - is ON when the inverter is ready to respond to the Run key, OFF when the Run key is disabled. • Run Key - Press this key to run the motor (the Run Enable LED must be ON first). Parameter F_04, Keypad Run Key Routing, determines whether the Run key generates a Run FWD or Run REV command. • Stop/Reset Key - Press this key to stop the motor when it is running (uses the programmed deceleration rate). This key will also reset an alarm that has tripped. • Potentiometer - Allows an operator to directly set the motor speed when the potentiometer is enabled for output frequency control. • Potentiometer Enable LED - ON when the potentiometer is enabled for value entry.

Inverter Mounting and Installation

Run Key Enable LED

PRG

POWER

Page 66

2–22

Using the Front Panel Keypad • Parameter Display - A 4-digit, 7-segment display for parameters and function codes. • Display Units, Hertz/Amperes - One of these LEDs will be ON to indicate the units associated with the parameter display. • Power LED - This LED is ON when the power input to the inverter is ON. • Function Key - This key is used to navigate through the lists of parameters and functions for setting and monitoring parameter values.

Inverter Mounting and Installation

• Up/Down ( 1 , 2 ) Keys - Use these keys alternately to move up or down the lists of parameter and functions shown in the display, and increment/decrement values. • Store ( STR ) Key - When the unit is in Program Mode and you have edited a parameter value, press the Store key to write the new value to the EEPROM.

Keys, Modes, and Parameters Purpose of the keypad is to provide a way to change modes and parameters. The term function applies to both monitoring modes and parameters. These are all accessible through function codes that are primarily 3-character codes. The various functions are separated into related groups identifiable by the left-most character, as the table shows. Function Group

Type (Category) of Function

Mode to Access

“D”

Monitoring functions

Monitor

“F”

Main profile parameters

Program

“A”

Standard functions

Program

“B”

Fine tuning functions

Program

“C”

Intelligent terminal functions

Program

“E”

Error codes, PGM LED Indicator, For example, function “A_04” is the base frequency setting for the motor, typically 50 Hz or 60 Hz. To edit the parameter, the inverter must be in Program Mode (PGM LED will be ON). You use the front panel keys to first select the function code “A_04.” After displaying the value for “A_04,” use the Up/Down ( 1 or 2 ) keys to edit it. NOTE: The inverter 7-segment display shows lower case “b” and “d,” meaning the same as the upper case letters “B” and “D” used in this manual (for uniformity “A to F”). The inverter automatically switches into Monitor Mode when you access “D” Group functions. It switches into Program Mode when you access any other group, because they all have editable parameters. Error codes use the “E” Group, and appear automatically when a fault event occurs. Refer to “Monitoring Trip Events, History, & Conditions” on page 6–5 for error code details.

MONITOR

PROGRAM

“D” “D”Group Group

“A” Group “B” Group “C” Group “F” Group

Page 67

2–23

L100 Inverter

Keypad Navigational Map The L100 Series inverter drives have many programmable functions and parameters. Chapter 3 will cover these in detail, but you need to access just a few items to perform the powerup test. The menu structure makes use of function codes and parameter codes to allow programming and monitoring with only a 4-digit display and a few keys and LEDs. So, it is important to become familiar with the basic navigational map of parameters and functions in the diagram below. You may later use this map as a reference. Monitor Mode

Program Mode

PRG LED=OFF

0 0 0.0 FUNC.

1 d 09

Select Parameter powerdown

Select Function or Group

Store as powerup default

1

C 91 1

1

2

1

1

FUNC.

1

1

1

FUNC.

1 2 3.4

F 04

2

FUNC.

2 STR

2

A 01

2

2

Edit

2

A 98

2

A -1

2 b 01

2 b - 1

2 b 92

2

C -1

Increment/ decrement value

C 01 d 01 1

Edit Parameter

Write data to EEPROM

FUNC.

1

2

F 01

Return to parameter list

2

The navigational map shows the relationship of all resources of the inverter in one view. In general, use the FUNC. key to move left and right, and the 1 2 (arrow) keys to move up and down.

Inverter Mounting and Installation

Display Data

PRG LED=ON

Page 68

2–24

Using the Front Panel Keypad

Selecting Functions and Editing Parameters In order to run the motor for the powerup test, this section will show how to: • select the inverter’s maximum output frequency to the motor • select the keypad potentiometer as the source of motor speed command • select the keypad as the source of the RUN command

Inverter Mounting and Installation

• enable the RUN command The following series of programming tables are designed for successive use. Each table uses the previous table’s final state as the starting point. Therefore, start with the first and continue programming until the last one. If you get lost or concerned that some of the other parameters settings may be incorrect, refer to “Restoring Factory Default Settings” on page 6–8. CAUTION: If you operate a motor at a frequency higher than the inverter standard default setting (50Hz/60Hz), be sure to check the motor and machine specifications with the respective manufacturer. Only operate the motor at elevated frequencies after getting their approval. Otherwise, there is the danger of equipment damage. Setting the Motor Base Frequency -The motor is designed to operate at a specific AC frequency. Most commercial motors are designed for 50/60 Hz operation. First, check the motor specifications. Then follow the steps in the table below to verify the setting or correct for your motor. DO NOT set it for greater than 50/60 Hz unless the motor manufacturer specifically approves operation at the higher frequency. Action Press the FUNC. key. Press the

1 or

2 keys until ->

Press the FUNC. key. Press the

1 key twice.

Display d 01

Monitor functions d 01

“A” Group selected

A 01

First “A” parameter

A 03

Base frequency setting

60

Press the FUNC. key.

Func./Parameter

Default value for base frequency. US = 60 Hz, Europe = 50 Hz.

or

50 Press the

1 or

2

Press the STR key.

key as needed.

60 A 03

Set to your motor specs (your display may be different) Stores parameter, returns to “A” Group list

TIP: If you need to scroll through a function or parameter list, press and hold the 1 or 2 key to auto-increment through the list.

Page 69

L100 Inverter

2–25

Select the Potentiometer for Speed Command - The motor speed may be controlled from the following sources: • Potentiometer on front panel keypad • Control terminals • Remote panel Then follow the steps in the table below to select the potentiometer for the speed command (the table resumes action from the end of the previous table). Display

Func./Parameter key twice.

A 01

Speed command source setting

Press the FUNC. key.

01

0 = potentiometer 1 = control terminals (default) 2 = keypad key.

00

0 = potentiometer (selected)

Press the STR key.

A 01

Press the

Press the

2

2

Stores parameter, returns to “A” Group list

Select the Keypad for the RUN Command - The RUN command causes the inverter to accelerate the motor to the selected speed. You can program the inverter to respond to either the control terminal signal or the keypad RUN key. Follow the steps in the table below to select the front panel RUN key as the source for the RUN Command (the table resumes action from the end of the previous table). Action

Display key.

A 02

Press the FUNC. key.

01

1 = control terminals (default) 2 = keypad key.

02

2 = keypad (selected)

Press the STR key.

A 02

Press the

Press the

1

1

Func./Parameter Run command source

Stores parameter, returns to “A” Group list

NOTE: When you press the STR key in the last step above (and the display = 02), the Run Enable LED above the RUN switch on the keypad will turn ON. This is normal, and does not mean the motor is trying to run. It means that the RUN key is now enabled. DO NOT press the RUN key at this time - finish out the programming exercise first. TIP: If you became lost during any of these steps, first observe the state of the PRG LED. Then study the “Keypad Navigational Map” on page 2–23 to determine the current state of the keypad controls and display. As long as you do not press the STR key, no parameters will be changed by keypad entry errors.

Inverter Mounting and Installation

Action

Page 70

2–26

Using the Front Panel Keypad

Monitoring Parameters with the Display

Inverter Mounting and Installation

After using the keypad for parameter editing, it’s a good idea to switch the inverter from Program Mode to Monitor Mode and close the panel door (puts the keys for parameter editing out of sight). This will also turn out the PRG LED, and the Hertz or Ampere LED indicates the display units.

HITACHI RUN PRG

RUN

POWER

5 0.0

Hz A

STOP

RESET MIN

MAX

For the powerup test, monitor the motor speed indirectly by viewing the inverter’s output frequency. The output frequency must not be confused with base frequency (50/60 Hz) of the motor, or the carrier frequency (switching frequency of the inverter, in the kHz range). The monitoring functions are in the “D” list, located near the top left of the “Keypad Navigational Map” on page 2–23. Output frequency (speed) monitor - Resuming the keypad programming from the previous table, follow the steps in the table below. Action Press the FUNC. key. Press the

1 key three times.

Press the FUNC. key.

Display

Func./Parameter

A --

“A” Group selected d 01

Output frequency selected

0.0

Output frequency displayed

When the d 0 1 function code appeared, the PRG LED went OFF. This confirms the inverter is no longer in programming mode, even while you are selecting the particular monitoring parameter. After pressing the Function key, the display shows the current speed (is zero at this point).

Running the Motor If you have programmed all the parameters up to this point, you’re ready to run the motor! First, review this checklist: 1. Verify the Power LED is ON. If not, check the power connections. 2. Verify the Run Key Enable LED is ON. If not, review the programming steps to find the problem. 3. Verify the PRG LED is OFF. If it is ON, review the instructions above. 4. Make sure the motor is disconnected from any mechanical load. 5. Turn the potentiometer to the MIN position (completely counterclockwise). 6. Now, press the RUN key on the keypad. The RUN LED will turn ON. 7. Slowly increase the potentiometer setting in clockwise fashion. The motor should start turning when the indicator is in the 9:00 position and beyond. 8. Press the STOP key to stop the motor rotation.

Page 71

L100 Inverter

2–27

Powerup Test Observations and Summary Step 10: Reading this section will help you make some useful observations when first 10 running the motor. Error Codes - If the inverter displays an error code (format is “E x x”), see “Monitoring Trip Events, History, & Conditions” on page 6–5 to interpret and clear the error. Acceleration and Deceleration - The L100 inverter has programmable acceleration and deceleration values. The test procedure left these at the default value, 10 seconds. You can observe this by setting the potentiometer at about half speed before running the motor. Then press RUN, and the motor will take 5 seconds to reach a steady speed. Press the STOP key to see a 5 second deceleration to a stop.

Interpreting the Display - First, refer to the output frequency display readout. The maximum frequency setting (parameter A_04) defaults to 50 Hz or 60 Hz (Europe and United States, respectively) for your application. Example: Suppose a 4-pole motor is rated for 60 Hz operation, so the inverter is configured to output 60 Hz at full scale. Use the following formula to calculate the RPM. × 60 = Frequency × 120 = 60 × 120 = 1800RPM Speed in RPM = Frequency ----------------------------------------------------------------------------------------------------Pairs of poles # of poles 4 The theoretical speed for the motor is 1800 RPM (speed of torque vector rotation). However, the motor cannot generate torque unless its shaft turns at a slightly different speed. This difference is called slip. So it’s common to see a rated speed of approximately 1750 RPM on a 60 Hz, 4-pole motor. Using a tachometer to measure shaft speed, you can see the difference between the inverter output frequency and the actual motor speed. The slip increases slightly as the motor’s load increases. This is why the inverter output value is called “frequency,” since it is not exactly equal to motor speed. You can program the inverter to display output frequency in units more directly related to the load speed by entering a constant (discussed more in depth on page 3–29). Run/Stop Versus Monitor/Program Modes – The Run LED on the inverter is ON in Run Mode, and OFF in Stop Mode. The Program LED is ON when the inverter is in Program Mode, and OFF for Monitor Mode. All four mode combinations are possible. The diagram to the right depicts the modes and the mode transitions via keypad.

STOP

RESET

Run

RUN

Stop

FUNC.

Monitor

Program

NOTE: Some factory automation devices such as PLCs have alternate Run/Program modes; the device is in either one mode or the other. In the Hitachi inverter, however, Run Mode alternates with Stop Mode, and Program Mode alternates with Monitor Mode. This arrangement lets you program some values while the inverter is operating - providing flexibility for maintenance personnel.

Inverter Mounting and Installation

State of Inverter at Stop - If you adjust the motor’s speed to zero, the motor will slow to a near stop, and the inverter turns the outputs OFF. The high-performance L100 can rotate at a very slow speed with high torque output, but not zero (must use servo systems with position feedback for that feature). This characteristic means you must use a mechanical brake for some applications.