Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeContact

The text of a manual · part 2 of 23

SYSMAC C200HS Programmable Controllers Installation Guide, pages 11 to 20

Pages 11 to 20 of 221

The original document is the PDF (2.5 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the Omron C200H-OC225 and Omron C200HW-SLK23

Page 11

Application Precautions ! Caution

5

5 The operating environment of the PC System can have a large effect on the longevity and reliability of the system. Improper operating environments can lead to malfunction, failure, and other unforeseeable problems with the PC System. Be sure that the operating environment is within the specified conditions at installation and remains within the specified conditions during the life of the system.

Application Precautions Observe the following precautions when using the PC. ! WARNING Failure to abide by the following precautions could lead to serious or possibly fatal injury. Always heed these precautions. • Always ground the system to 100 Ω or less when installing the system to protect against electrical shock. • Always turn off the power supply to the PC before attempting any of the following. Performing any of the following with the power supply turned on may lead to electrical shock: • Mounting or removing any Units (e.g., I/O Units, CPU Unit, etc.) or memory cassettes. • Assembling any devices or racks. • Connecting or disconnecting any cables or wiring. ! Caution

Failure to abide by the following precautions could lead to faulty operation or the PC or the system or could damage the PC or PC Units. Always heed these precautions. • Use the Units only with the power supplies and voltages specified in the operation manuals. Other power supplies and voltages may damage the Units. • Take measures to stabilize the power supply to conform to the rated supply if it is not stable. • Provide circuit breakers and other safety measures to provide protection against shorts in external wiring. • Do not apply voltages exceeding the rated input voltage to Input Units. The Input Units may be destroyed. • Do not apply voltages exceeding the maximum switching capacity to Output Units. The Output Units may be destroyed. • Always disconnect the LG terminal when performing withstand voltage tests. • Install all Units according to instructions in the operation manuals. Improper installation may cause faulty operation. • Provide proper shielding when installing in the following locations: • Locations subject to static electricity or other sources of noise. • Locations subject to strong electromagnetic fields. • Locations subject to possible exposure to radiation. • Locations near to power supply lines. • Be sure to tighten Backplane screws, terminal screws, and cable connector screws securely. • Do not attempt to take any Units apart, to repair any Units, or to modify any Units in any way.

! Caution

The following precautions are necessary to ensure the general safety of the system. Always heed these precautions. • Provide double safety mechanisms to handle incorrect signals that can be generated by broken signal lines or momentary power interruptions. • Provide external interlock circuits, limit circuits, and other safety circuits in addition to any provided within the PC to ensure safety.

xiii

Page 12

Conformance to EC Directives

6

6

Conformance to EC Directives Observe the following precautions when installing the C200HS-CPU01-EC and C200HS-CPU21-EC that conform to the EC Directives. 1, 2, 3...

xiv

1. Since the C200HS PC is defined as an open type, be sure to install it inside a panel. 2. Provide reinforced insulation or double insulation for the DC power source connected to the DC I/O Unit and for the CPU with a DC power source. 3. The C200HS PC that conforms to the EC Directives also conforms, as an individual unit, to the Common Emission Standard (EN50081-2) of the EC Directives. When incorporated into a device, however, the C200HS PC may not satisfy this Standard due to the noise produced by the contact output when it switches on and off. In such a case, it will be necessary to take countermeasures such as connecting a surge or arc killer, or providing an external means of protection for the PC. The countermeasures taken to satisfy the Standard vary depending on the load devices, wiring, machinery configuration, etc. Described on page 130 are examples of countermeasures to be taken to reduce the noise. Criteria for Taking Countermeasures (Refer to EN50081-2 for details.) Countermeasures are not required if the frequency of load switching for the whole system with the PC included is less than 5 times per minute. Countermeasures are not required if the frequency of load switching for the whole system with the PC included is more than 5 times per minute.

Page 13

SECTION 1 Introduction This section provides general information about Programmable Controllers (PCs) and how they fit into a Control System. It also provides an overview of the new features of the C200HS and the major differences between the C200HS and the C200H. 1-1 1-2

1-3 1-4

1-5 1-6

What is a Control System? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . The Role of the PC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2-1 Input Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2-2 Output Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . How Does a PC Work? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . New C200HS Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4-1 Improved Memory Capabilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4-2 Faster Execution Times . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4-3 Larger Instruction Set . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4-4 Expanded Number of I/O Points . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4-5 Wide Selection of Special I/O Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4-6 Improved Interrupt Functions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4-7 SYSMAC NET Link and SYSMAC LINK Capabilities . . . . . . . . . . . . . . . . . . . . 1-4-8 Built-in RS-232C Connector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4-9 More Flexible PC Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4-10 Debugging and Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4-11 Peripheral Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Comparisons Between C200HS and C200H . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Compatibility of C200HS and C200H Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2 4 4 4 5 8 8 9 9 9 9 9 10 10 10 10 10 11 13

1

Page 14

Section 1-1

What is a Control System?

1-1

What is a Control System? A Control System is the electronic equipment needed to control a particular process. It may include everything from a process control computer, if one is used, to the factory computer, down through the PCs (and there may be many of them networked together) and then on down through the network to the control components: the switches, stepping motors, solenoids, and sensors which monitor and control the mechanical operations.

Process Control Computer

Factory Computer

PCs PC

PC

PC

Control Components A Control System can involve very large applications where many different models of PC are networked together or it could be an application as small as a single PC controlling a single output device.

2

Page 15

Section 1-1

What is a Control System? A Position Control System

Position Control Unit

Input Unit

PC

Signal line for Servomotor driver control

Power source

Hand-held Programming Console

Control panel Control switch DC Servomotor Driver

Power source

DC Servomotor

DC Servomotor Driver

DC Servomotor

In the typical Control System example shown above, a PC controls the movement of the workpiece bed across two horizontal axes using Limit Switches and Servomotors to monitor and control movement.

3

Page 16

Section 1-2

The Role of the PC

1-2

The Role of the PC The Programmable Controller, or PC, is the part of the Control System that directly controls the manufacturing process. According to the program stored in its memory, the PC accepts data from the input devices connected to it, and uses this data to monitor the controlled system. When the program calls for some action to take place, the PC sends data to the output devices connected to it, to cause that action to take place. The PC may be used to control a simple, repetitive task, or it may be connected to other PCs, or to a host computer in order to integrate the control of a complex process.

1-2-1 Input Devices PCs can receive input from either automated or manual devices. The PC could receive data from the user via a pushbutton switch, keyboard, or similar device. Automated input could come from a variety of devices: microswitches, timers, encoders, photosensors, and so on. Some devices, like the Limit Switch shown below, turn ON or OFF when the equipment actually makes contact with it. Other devices, like the Photoelectric Switch and Proximity Switch shown below, use other means, such as light or inductance, in order to get information about the equipment being monitored.

Photoelectric switch

Limit switch

Proximity switch

1-2-2 Output Devices A PC can output to a myriad of devices for use in automated control. Almost anything that you can think of could be controlled (perhaps indirectly) by a PC. Some of the most common devices are motors, Solenoids, Servomotors, Stepping Motors, valves, switches, indicator lights, buzzers, and alarms. Some of these output devices; such as the motors, Solenoids, Servomotors, Stepping Motors,

4

Page 17

Section 1-3

How Does a PC Work?

and valves; affect the controlled system directly. Others; such as the indicator lights, buzzers, and alarms; provide output to notify personnel.

Solenoid

Servomotor

Stepping motor

1-3

How Does a PC Work? PCs operate by monitoring input signals and providing output signals. When changes are detected in the signals, the PC reacts, through the user-programmed internal logic, to produce output signals. The PC continually scans the program in its memory to achieve this control.

Block Diagram of PC

Power Supply

Memory

Signals from switches, sensors, etc.

Input

CPU

Output

Signals to Solenoids, motors, etc.

Programming Device

A program for your applications must be designed, and stored in the PC. This program is then executed as part of the cycle of internal operations of the PC.

5

Page 18

How Does a PC Work? Cycle

When a PC operates, that is, when it executes its program to control an external system, a series of operations are performed inside the PC. These internal operations can be broadly classified into the following four categories: 1, 2, 3...

Cycle Time

6

Section 1-3

1. Common (or overseeing) processes, such as watchdog timer operation and testing the program memory. 2. Data input and output. 3. Instruction execution. 4. Peripheral device servicing. The total time required for a PC to perform all these internal operations is called the cycle time. The flowchart and diagram on the following page illustrate these internal operations for a typical PC. Timing is one of the most important factors in designing a Control System. For accurate operations, it is necessary to have answers to such questions as these: • How long does it take for the PC to execute all the instructions in its memory? • How long does it take for the PC to produce a control output in response to a given input signal? The cycle time of the PC can be automatically calculated and monitored, but it is necessary to have an understanding of the timing relationships within the PC for effective system design and programming.

Page 19

Section 1-3

How Does a PC Work? Flowchart of CPU Operation

Power application

Clears IR area and resets all timers Initialization on power-up Checks I/O Unit connections

Resets watchdog timer

Checks hardware and Program Memory

Overseeing processes

NO Check OK?

YES Resets watchdog timer and program address counter

Sets error flags and turns ON or flashes indicator

ERROR (Solid ON)

Program execution

Executes program

ALARM/ERROR ALARM (Flashing)

End of program?

NO

YES SCAN(18) executed?

NO

YES Resets watchdog timer and waits until the set cycle time has elapsed

Cycle time calculation

PC cycle time

Calculates cycle time

Resets watchdog timer I/O refreshing Refreshes input bits and output signals

Services RS-232C connector

RS-232C connector servicing

Services Host Link Units

Host Link Unit servicing

Services Peripheral devices

Peripheral device servicing

Services SYSMAC LINK and SYSMAC NET Link Units

SYSMAC LINK and SYSMAC NET Link Unit servicing

7

Page 20

Section 1-4

New C200HS Features

1-4

New C200HS Features The C200HS CPUs (C200HS-CPU01-E, C200HS-CPU01-EC, C200HSCPU03-E, C200HS-CPU21-E, C200HS-CPU23-E, C200HS-CPU31-E, and C200HS-CPU33-E) have a number of new features that the C200H CPUs lacked. The new C200HS features are described briefly in this section. The C200HS-CPU01-E, C200HS-CPU01-EC, C200HS-CPU21-E, and C200HSCPU31-E use an AC power supply and the C200HS-CPU03-E, C200HSCPU23-E, and C200HS-CPU33-E use DC. In addition, the C200HS-CPU21-E, C200HS-CPU23-E, C200HS-CPU31-E, and C200HS-CPU33-E CPUs have an RS-232C connector. The C200HSCPU31-E and C200HS-CPU33-E CPUs support the SYSMAC NET Link Unit and SYSMAC LINK Unit. The C200HS-CPU01-EC CPU and C200HSCPU03-E CPU with lot number jjZ5 (Dec. 1995) or later conform to EC directives. The C200HS-CPU21-EC CPU conforms to EC directives.

1-4-1 Improved Memory Capabilities Internal Memory (UM)

The C200HS CPUs come equipped with 16 KW of RAM in the PC itself, so a very large memory capacity is available without purchasing a separate Memory Unit. Furthermore, the program capacity has been increased to 15.2 KW.

Memory Cassettes

Two types of Memory Cassettes are available for storage of data such as the program. The PC can be set to transfer data from the Memory Cassette to UM automatically when the PC is turned on. Model

Specifications

C200HS-ME16K

16-KW EEPROM

C200HS-MP16K

16-KW EPROM

Note C200H Memory Cassettes cannot be used in the C200HS. Clock Function

The C200HS CPUs have a built-in clock. It is not necessary to purchase a Memory Unit equipped with a clock, as it was with the C200H-CPU21-E.

Increased SR and IR Areas

The SR area has been increased substantially to provide more work words and words dedicated to new instructions. The SR area now ranges from SR 236 to SR 299. (The SR area ends at SR 255 in C200H CPUs.) The number of operands and instruction execution time will be increased when SR 256 to SR 299 are used in basic instructions. I/O and work words previously ranged from 000 to 255. Words 256 to 511 have been added for the C200HS.

Increased DM Area

The Read/Write DM area has been increased substantially, too. It now ranges from DM 0000 to DM 6143, compared to DM 0000 to DM 0999 in C200H CPUs. The 6000 words from DM 0000 to DM 5999 are available for use in the program. (DM 6000 to DM 6143 are used for the History Log and other functions.)

Fixed DM and Expansion DM Areas

The Fixed DM Area, used to store initializing data for Special I/O Units, has been decreased in size. It now contains the 512 words from DM 6144 to DM 6655, compared to 1000 words (DM 1000 to DM 1999) in C200H CPUs. In addition, up to 3000 words of UM can be allocated as expansion DM. Expansion DM is allocated in 1000-word units in DM 7000 to DM 9999. C200H data stored in words DM 1000 to DM 1999 can be used in C200HS PCs by converting these 1000 words to ROM in the C200HS’s DM area (DM 7000 to DM 7999) and then automatically transferring them to DM 1000 to DM 1999 when the C200HS is turned on.

8