SYSMAC CJ Series CJ2H-CPU6_-EIP, CJ2H-CPU6_, CJ2M-CPU_ CJ2 CPU Unit Hardware User's Manual: Section 5 Installation, pages 145 to 153

Pages 145 to 153 of 422, from SYSMAC CJ Series CJ2H-CPU6_-EIP, CJ2H-CPU6_, CJ2M-CPU_ CJ2 CPU Unit Hardware User's Manual

The original document is the PDF (14 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

Filed in the catalog under the Omron C200H-OD21A, Omron CQM1-ID211, Omron CQM1-ID213, Omron CQM1-OD211 and Omron CQM1-OD213

Page 145

Installation This section describes how to install and wire a CJ2 PLC.

5-1 Fail-safe Circuits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2 5-2 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 5-2-1 5-2-2 5-2-3 5-2-4 5-2-5 5-2-6

Installation and Wiring Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 Installation in a Control Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6 Assembled Appearance and Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8 Connecting PLC Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-13 DIN Track Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-15 Connecting CJ-series Expansion Racks . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-17

5-3 Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-20 5-3-1 5-3-2 5-3-3 5-3-4 5-3-5 5-3-6 5-3-7

Power Supply Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-20 Wiring CJ-series Basic I/O Units with Terminal Blocks . . . . . . . . . . . . . . . . . 5-27 Wiring Basic I/O Units with Connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-29 Connecting to Connector-Terminal Block Conversion Units or I/O Relay Terminals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-33 Connecting Pulse I/O Modules to External I/O Devices (CJ2M CPU Unit Only) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-33 Connecting I/O Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-35 Connecting through an Ethernet Cable (CJ2H-CPU6@-EIP and CJ2M-CPU3@ Only) . . . . . . . . . . . . . . . . . . . . . . . . 5-39

5-4 Control Panel Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-42 5-4-1 5-4-2 5-4-3 5-4-4 5-4-5 5-4-6

CJ2 CPU Unit Hardware User’s Manual

Temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-42 Humidity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-44 Vibration and Shock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-44 Atmosphere . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-44 Electrical Environment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-45 Grounding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-50

5-1

5

Page 146

5 Installation

5-1

Fail-safe Circuits Be sure to set up safety circuits outside of the PLC to prevent dangerous conditions in the event of errors in the PLC or external power supply.

Order of Powering Up the CPU Unit and Controlled System Outputs from Units such as DC Output Units may malfunction momentarily when the power to the PLC is turned ON. This may cause problems in the system if the PLC's power supply is turned ON after the controlled system's power supply. To prevent possible malfunctions, add an external circuit that prevents the power supply to the controlled system from going ON before the power supply to the PLC itself.

Managing CPU Unit Errors When any of the following errors occurs, PLC operation will stop and all outputs from Output Units will be turned OFF. • Operation of the Power Supply Unit's overcurrent protection circuit • A CPU error (watchdog timer error) or CPU on standby • A fatal error (memory error, Memory Card transfer error, I/O bus error, Unit/Rack number duplication error, too many I/O points error, I/O setting error, program error, cycle time exceeded error, or FALS(007) error)*1 Be sure to add any circuits necessary outside of the PLC to ensure the safety of the system in the event of an error that stops PLC operation. *1 When a fatal error occurs, all outputs from Output Units will be turned OFF even if the IOM Hold Bit has been turned ON to protect the contents of I/O memory. (When the IOM Hold Bit is ON, the outputs will retain their previous status after the PLC has been switched from RUN/MONITOR mode to PROGRAM mode.)

Managing Output Malfunctions It is possible for an output to remain ON due to a malfunction in the internal circuitry of the Output Unit, such as a relay or transistor malfunction. Be sure to add any circuits necessary outside of the PLC to ensure the safety of the system in the event that an output fails to go OFF.

5-2

CJ2 CPU Unit Hardware User’s Manual

Page 147

5 Installation

Emergency Stop Circuit The following emergency stop circuit controls the power supply to the controlled system so that power is supplied to the controlled system only when the PLC is operating and the RUN output is ON. An external relay (CR1) is connected to the RUN output from the Power Supply Unit*1 as shown in the following diagram. *1 A RUN output is provided only on the CJ1W-PA205R Power Supply Unit. When a Power Supply Unit without a RUN output is used, program the Always ON Flag (A1) as the execution condition for an output point from an Output Unit.

z Electrical Diagram MCB1 5-1 Fail-safe Circuits

Power supply MCB2 CR1

Controlled system Transformer or noise filter

5

Twisted-pair wires

CJ-series PLC

DC voltage regulator DC input/output

PLC RUN output CR1

Surge suppressor

Interlock Circuits When the PLC controls an operation such as the clockwise and counterclockwise operation of a motor, provide an external interlock such as the one shown in the following example to prevent both the forward and reverse outputs from turning ON at the same time. Interlock circuit 000501

MC2 MC1 Motor clockwise

CJ-series PLC

000502

MC1 MC2 Motor counterclockwise

This circuit prevents outputs MC1 and MC2 from both being ON at the same time even if both CIO 000501 and CIO 000502 are ON, so the motor is protected even if the PLC is programmed improperly or malfunctions.

CJ2 CPU Unit Hardware User’s Manual

5-3

Page 148

5 Installation

5-2

Installation

5-2-1

Installation and Wiring Precautions

Installation in Cabinets or Control Panels When the PLC is being installed in a cabinet or control panel, be sure to provide proper ambient conditions as well as access for operation and maintenance.

z Temperature Control The ambient temperature within the enclosure must be within the operating range of 0 to 55°C. When necessary, take the following steps to maintain the proper temperature. • Provide enough space for good air flow. • Do not install the PLC above equipment that generates a large amount of heat such as heaters, transformers, or high-capacity resistors. • If the ambient temperature exceeds 55°C, install a cooling fan or air conditioner. Fan

Control panel

CJ-series PLC

Louver z Accessibility for Operation and Maintenance • To ensure safe access for operation and maintenance, separate the PLC as much as possible from high-voltage equipment and power machinery. • The PLC will be easiest to install and operate if it is mounted at a height of 1.0 to 1.6 m above the floor.

z Improving Noise Resistance • Do not mount the PLC in a control panel containing high-voltage equipment. • Install the PLC at least 200 mm from power lines. Power lines

200 mm min. CJ-series PLC

200 mm min.

• Ground the mounting plate between the PLC and the mounting surface. • When I/O Connecting Cables are 10 m or longer, connect the control panels in which Racks are mounted with heavier power wires (3 wires at least 2 mm2 in cross-sectional area). 5-4

CJ2 CPU Unit Hardware User’s Manual

Page 149

5 Installation z PLC Orientation • Each Rack must be mounted in an upright position to provide proper cooling.

• Do not install a Rack in any of the following positions.

5-2 Installation

5 5-2-1 Installation and Wiring Precautions

Precautions for Safe Use Always use the standard installation method. A nonstandard installation will decrease heat dissipation, and may delay the replacement notification signal (in particular for Power Supply Units with Replacement Notification (CJ1W-PA205C)), or degrade or damage the internal elements.

CJ2 CPU Unit Hardware User’s Manual

5-5

Page 150

5 Installation

5-2-2

Installation in a Control Panel

Control Panel Installation Dimensions A CJ-series PLC must be mounted inside a control panel on DIN Track. Normally the CPU Rack is installed on top and the Expansion Racks under it. DIN Track

• Consider the width of wiring ducts, wiring, ventilation, and Unit replacement when determining the space between Racks. Additional Information A CJ-series PLC must be mounted on DIN Track. It cannot be mounted with screws. • Whenever possible, route I/O wiring through wiring ducts or raceways. Install the duct so that it is easy to fish wire from the I/O Units through the duct. It is handy to have the duct at the same height as the Racks. Duct 20 mm min.

Unit

DIN Track

20 mm min. Duct

5-6

CJ2 CPU Unit Hardware User’s Manual

Page 151

5 Installation z Wiring Ducts 81.6 to 89 mm

CPU Rack

30 mm

30 mm 40 mm Duct

Expansion Rack

Mounting bracket

Precautions for Correct Use Tighten terminal block screws and cable screws to the following torques.

5-2 Installation

Terminal Screws M4: 1.2 N·m M3: 0.5 N·m Cable Connector Screws M2.6: 0.2 N·m z Routing Wiring Ducts Install the wiring ducts at least 20 mm between the tops of the Racks and any other objects, (e.g., ceiling, wiring ducts, structural supports, devices, etc.) to provide enough space for air circulation and replacement of Units. Output duct

5-2-2 Installation in a Control Panel

Input duct

Power duct 200 mm min.

CPU Rack

Breakers, fuses

Expansion Rack Power equipment such as transformers and magnetic relays

Fuses, relays, timers, etc. (NOT heat-generating equipment, power equipment, etc.)

CJ2 CPU Unit Hardware User’s Manual

Terminal blocks for PLC

5

Terminal blocks for power equipment

5-7

Page 152

5 Installation

5-2-3

Assembled Appearance and Dimensions The CJ-series Units, including the Power Supply Unit, the CPU Unit, and I/O Units, are connected to each other and an End Cover is connected to the right end.

Dimensions (Unit: mm) Power Supply Unit Name

Model number

Power Supply Unit

Specifications

Unit width

CJ1W-PA205R

100 to 240 VAC, 25 W

80 mm

CJ1W-PA205C

100 to 240 VAC, 25 W

80 mm

CJ1W-PA202

100 to 240 VAC, 14 W

45 mm

CJ1W-PD025

24 VDC, 25 W

60 mm

CJ1W-PD022

24 VDC, 19.6 W

27 mm

CPU Unit Name CPU Unit

5-8

Model number

Specifications

CJ2H-CPU68-EIP

I/O points: 2,560 Program capacity: 400 Ksteps

CJ2H-CPU67-EIP

I/O points: 2,560 Program capacity: 250 Ksteps

CJ2H-CPU66-EIP

I/O points: 2,560 Program capacity: 150 Ksteps

CJ2H-CPU65-EIP

I/O points: 2,560 Program capacity: 100 Ksteps

CJ2H-CPU64-EIP

I/O points: 2,560 Program capacity: 50 Ksteps

CJ2H-CPU68

I/O points: 2,560 Program capacity: 400 Ksteps

CJ2H-CPU67

I/O points: 2,560 Program capacity: 250 Ksteps

CJ2H-CPU66

I/O points: 2,560 Program capacity: 150 Ksteps

CJ2H-CPU65

I/O points: 2,560 Program capacity: 100 Ksteps

CJ2H-CPU64

I/O points: 2,560 Program capacity: 50 Ksteps

Unit width 79.8 mm

48.8 mm

CJ2 CPU Unit Hardware User’s Manual

Page 153

5 Installation

Name

Model number

CPU Unit

Specifications I/O points: 2,560 Program capacity: 60 Ksteps

CJ2M-CPU34

I/O points: 2,560 Program capacity: 30 Ksteps

CJ2M-CPU33

I/O points: 2,560 Program capacity: 20 Ksteps

CJ2M-CPU32

I/O points: 2,560 Program capacity: 10 Ksteps

CJ2M-CPU31

I/O points: 2,560 Program capacity: 5 Ksteps

CJ2M-CPU15

I/O points: 2,560 Program capacity: 60 Ksteps

CJ2M-CPU14

I/O points: 2,560 Program capacity: 30 Ksteps

CJ2M-CPU13

I/O points: 2,560 Program capacity: 20 Ksteps

CJ2M-CPU12

I/O points: 2,560 Program capacity: 10 Ksteps

CJ2M-CPU11

I/O points: 2,560 Program capacity: 5 Ksteps

62 mm*

31 mm*

5-2 Installation

CJ2M-CPU35

Unit width

* The width of the CPU Rack will increase by 20 mm for each CJ2M-MD21@ Pulse I/O Module that is connected to the CJ2M CPU Unit.

20-mm-wide Units Name

Model number

I/O Control Unit

CJ1W-IC101

32-point Basic I/O Units

CJ1W-ID231/ID232/ID233

Unit width 20 mm

CJ1W-OD231/OD232/OD233/OD234 B7A Interface Units

CJ1W-B7A22 CJ1W-B7A14 CJ1W-B7A04

CompoBus/S Master Unit

CJ1W-SRM21

Space Unit

CJ1W-SP001

CJ2 CPU Unit Hardware User’s Manual

5 5-2-3 Assembled Appearance and Dimensions

Other than the CPU Units and Power Supply Units, CJ-series Units come in four widths: 20 mm, 31 mm, 51 mm, and 79.8 mm.

5-9