Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeContact
Page 1 of Andover Continuum Power Supply Reference

Manual · Schneider

Andover Continuum Power Supply Reference

Manual30 pagesPDF 229 KB

Reference for Andover Continuum power supply modules (PS 120/240 AC 50-U and others): installation, wiring, UPS use, troubleshooting.

Download the PDF229 KB

Covers · 2 models

The models it covers

Summary

What is in it

Schneider Electric reference for the Andover Continuum power supply modules used with the Andover Continuum Ethernet-based intelligent building system. It lists each model's input voltage and power output (including the PS 120/240 AC 50-U UPS model), UL smoke control, access control and burglar alarm listings, DIN rail and panel mounting, dimensions, input, ground, DC, UPS, indicator, output and auxiliary power connections, operation and troubleshooting.

Its parts

  1. Introduction
  2. Power Module Characteristics
  3. Special System Characteristics
  4. Mechanical Installation
  5. Input Power Connection
  6. Building Ground Requirements
  7. DC Input Power Connection
  8. UPS Connections
  9. External Power Indicator Connection
  10. Output Power Connection
  11. Output Connections
  12. Auxiliary Power Connection
  13. Auxiliary Supply Conversion
  14. Operation
  15. Troubleshooting

From the manual · read page by page

Key facts from this manual

Each line names its page in the PDF.

This is the Schneider Electric Andover Continuum Power Supply Reference, for the DIN rail power supply modules PS 120/240 AC 25, AC 50, AC 65 and AC 85, the UPS versions AC 50-U, AC 65-U and AC 85-U, and the PS -48 DC 50 and DC 50-U. It explains mounting, input and output wiring, backup battery connection, use as an auxiliary supply, operation and troubleshooting.

Device
UPS version Andover Continuum power supply module: 120-240 VAC input, 35 W output for the CPU and I/O modules p. 8
Input power
120-240 VAC, 50 or 60 Hz, 150 VA, from its own unswitched circuit, on three screw terminals p. 13
Output
+24 VDC on pins 4 and 5 of a five pin connector that plugs into the left side of a CPU or I/O module p. 19
Backup battery
External 24 Volt lead-acid battery pack, 12V or 24V batteries (120 to 160 W•Hr), on a two-position screw terminal p. 17
Backup time
Full UPS with all I/O for up to 60 minutes at 35 watts; CPU only for 4 hours; DRAM and real-time clock only for 72 hours p. 8, 17
Charger
Built-in; worst case charging time 48 hours with two 12V, 7.0 Ahr batteries; battery cutoff at 20.4 volts p. 17
Status signals
Pin 1 AC Power and pin 2 Low Battery logic signals to the CPU; Low Battery reports the battery below 22 Volts p. 19
Mounting
Standard DIN rail with built-in clamps, or panel mount with screws; natural convection cooling p. 7, 10
Dimensions
6.70 in (170.2 mm), 2.50 in (63.5 mm) and 9.0 in (228.7 mm) overall p. 12
Power LED option
External LED on a two pin Molex connector # 14-56-7022 (not supplied); cable with LED, part number 01-0010-422, 2 foot (60 cm) p. 18
Indicators
Green Main Power indicator; yellow indicator in UPS backup mode p. 25
Auxiliary use
Can serve as an auxiliary supply after conversion: Mode switch to AUX on newer boards, two jumper components cut on older ones p. 21, 22, 23
Battery swap
The external battery can be replaced while the unit is AC powered, without interrupting service p. 17
Listings
The manual states the PS 120/240 AC 50-U is listed with UL for Smoke Control (UL 864), Access Control (UL 294) and Burglar Alarm (UL 1076) applications p. 9

What this manual walks you through

  • Mounting the module on a DIN rail or a panel p. 10, 11
  • Wiring AC input power and grounds p. 13, 14
  • Checking the building ground p. 15
  • Connecting the backup battery pack p. 17
  • Wiring an external power-on LED p. 18
  • Plugging the power supply, CPU and I/O modules together p. 20
  • Using and converting a UPS model as an auxiliary supply p. 21, 22, 23
  • Turning the power on and reading the indicators p. 25
  • Troubleshooting no response to the power switch p. 26

Good to know

  • No I/O module may sit between the power supply and the CPU. p. 20
  • The battery cutoff circuit activates at 20.4 volts to protect the batteries. p. 17
  • The AC connector cannot be used as a strain relief. p. 14
  • AC power wiring is kept apart from low voltage input or output wiring. p. 14
  • A ground connected with wire smaller than 14 AWG is not adequate. p. 15

Questions this manual answers

How long does the PS 120/240 AC 50-U run on battery?

Up to 60 minutes with all I/O at 35 watts, 4 hours for the CPU only, or 72 hours for DRAM and the real-time clock only. p. 8

What battery does the PS 120/240 AC 50-U use?

An external 24 Volt lead-acid battery pack made of standard 12V or 24V batteries (120 to 160 W•Hr). p. 17

What input power does the PS 120/240 AC 50-U need?

120-240 VAC, 50 or 60 Hz, 150 VA, from its own independent unswitched circuit. p. 13

How much power does the PS 120/240 AC 50-U supply?

35 W, as a +24 VDC source for the other modules. p. 8, 19

Can a UPS power supply be used as an auxiliary supply?

Yes, after its status signals are disabled: slide the Mode switch to AUX on newer boards, or cut two jumper components on older ones. p. 21, 22, 23

Contents

Chapters and sections

Each line opens the PDF at its page.

  1. Front Cover1
  2. Regulatory Notices3
  3. Introduction7
  4. Power Module Characteristics8
  5. Special System Characteristics9
  6. Mechanical Installation10
  7. Input Power Connection13
  8. Building Ground Requirements15
  9. DC Input Power Connection16
  10. UPS Connections17
  11. External Power Indicator Connection18
  12. Output Power Connection19
  13. Output Connections20
  14. Auxiliary Power Connection21
  15. Auxiliary Supply Conversion22
  16. Operation25
  17. Troubleshooting26

From the PDF’s own bookmarks.

The whole text · 3 parts

Read the manual here as text

Its text as extracted from the PDF, unedited, in parts; each page opens the PDF at that page.

  1. Pages 1 to 101-10
  2. Pages 11 to 2011-20
  3. Pages 21 to 3021-30

The file

Revision and size

RevisionRev. G, March 2010, part number 30-3001-702
PublisherSchneider Electric
Pages30
PDF229 KB
TextText from the PDF itself; page 1 is a scan, read by OCR, which may hold reading errors.

The first pages · 3 of 30

Look before you download

Each page opens the PDF at that page.

Page 1
Page 1of 30
Page 2
Page 2of 30
Page 3
Page 3of 30