The text of a manual · part 2 of 3
Andover Continuum Power Supply Reference, pages 11 to 20
Pages 11 to 20 of 30
The original document is the PDF (229 KB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Andover Controls PS 120/240 AC 50-U and Schneider PS 120/240 AC 50-U
Page 11
Once the module is in the desired position, it is locked to the rail by pushing the bottom clamps inward. After the bottom is secure, press the top clamp inward to complete the operation.
These clamps, when extended, provide an alternative method of mounting to the DIN rail. You can mount the module directly to a panel using the reinforced mounting holes provided on each of the clamps.
Andover Continuum Power Supply Reference
5
Page 12
Overall Dimensions The overall dimensions of the power supply unit are as shown:
6.70'' (170.2 mm)
2.50 '' (63.5 mm)
6
Schneider Electric
9.0 '' (228.7 mm)
Page 13
Input Power Connection AC Input Power Connection AC 50, AC 65, AC 85, AC 50-U, AC 65-U, AC 85-U, PS 120/240 AC 25 All the PS 120/240 power supply modules are powered by an external AC source. This source is connected via three screw terminals located inside the cover at the bottom of the unit as shown below. The module should receive power from its own independent, 120-240 VAC, 50 or 60 Hz, 150 VA, unswitched circuit. In order to access the connector you must remove the plastic cover from the case. Press both cover removal tabs inward simultaneously: 3XOO&RYHU8SZDUG ZLWK7DEV'HSUHVVHG
3UHVV7KHVH7DEV
Bottom of Case
*1' GND JUHHQ (See next page)
+27 %ODFN
$& 32:(5 1(875$/ ZKLWH
Andover Continuum Power Supply Reference
7
Page 14
Connect incoming power line Ground And Power Supply Ground to this point.
Do not apply excessive force when connecting the AC wires to the terminals. Be careful not to twist the wire bundle after it is connected. This connector cannot be used as a strain relief! The AC connection consists of both terminals (Hot and Neutral) from the power-line and a third wire tied to a common Earth ground. •
High voltage AC Power wiring should be routed to the conduit opening nearest the AC power terminals.
•
Do not bundle or route AC Power wiring with low voltage input or output wiring.
•
Be absolutely certain that your USA installation complies with all aspects of the National Electric Code, NFPA 70. Be especially sure that your system is properly grounded. DANGER! ELECTRIC SHOCK HAZARD Make sure that AC power is not applied to the power cable while you are wiring the module, or you could receive an electrical shock that is life-threatening. Failure to observe these instructions will result in death or serious injuries.
Connecting Grounds The power supply must be connected to true Earth ground. When used in an enclosure, be sure to connect the enclosure to Earth ground as well. The Continuum enclosure includes a special Chassis Ground stud that can be found at the lower left bottom of the inside as shown on the next page. Connect your grounds at that point. 8
Schneider Electric
Page 15
Building Ground Requirements Be sure that all equipment from Schneider Electric is grounded to true Earth ground. True Earth ground protects the equipment from transients and other power surges in the area. We cannot guarantee that the controller system will operate as documented without a properly grounded installation. An example of a sub-standard ground is a galvanized steel cold water pipe. As the pipe corrodes, it does not act as a true ground. The corrosion acts as an insulator, raising the potential of the pipe with respect to the ground. When lightning strikes in the area of the installation, it drastically changes the potential of the Earth. Since properly grounded Schneider Electric units respond to changes in potential more rapidly than poorly grounded electrical systems, a poorly grounded building tries to reach ground through the Schneider Electric system. The surge of current can destroy electronic components on the controller board. Surges of much lower potential than lightning also impact the reliability of the equipment. Inspecting the Ground Be sure to have your grounds inspected before you begin the installation process to be sure your municipality follows the National Electrical Code. Many municipalities do not follow the code and often have substandard electrical grounds. Check your ground as follows: Inspect the building power distribution panel for Earth-ground termination. If the ground termination is any of the following, it is not adequate and must be corrected: • Does not exist. • Is connected to a corroded or galvanized pipe. • Is connected using a small gauge wire (less than 14 AWG). Be sure your Schneider Electric cabinet is connected to the ground with a copper conductor that terminates at the distribution panel. Lightning Protection Metal oxide varistors are built into the power supply to protect against power line transients.
Andover Continuum Power Supply Reference
9
Page 16
DC Input Power Connection (PS –48 DC 50, DC 50-U) The PS –48 DC 50 and 50-U power supply modules are powered by an external 2 Amp -48VDC Nominal Input voltage -15% / +10% UL listed source. This source is connected via three screw terminals located at the bottom of the unit as shown below. ATTENTION: For all applications, the external power source must be listed for to UL1481. In order to access the connector you must remove the plastic cover from the case. Press both cover removal tabs inward simultaneously: 3XOO&RYHU8SZDUG ZLWK7DEV'HSUHVVHG
3UHVV7KHVH7DEV
Earth Ground
VIN ( ) VIN (+)
48VDC System
10
Schneider Electric
GND (See page 7)
Page 17
UPS Connections The following information pertains to the AC 50-U, AC 65-U, AC 85-U and DC 50-U models only.
Backup Battery Connection The PS 120/240 AC 50-U, AC 65-U, AC 85-U and PS –48 DC 50-U power supplies include provisions for connecting an external lead-acid battery supply to power the system in the event of a main AC power failure. An external 24 Volt battery pack may be sized to provide the hold-up time specified by system requirements. Using standard 12V or 24V batteries, (120 to 160 W•Hr), the built-in UPS circuitry provides a backup time of 60 minutes @ 35 Watts power consumption. The integral battery charger has a worst case charging time of 48 hours with two (2) 12V, 7.0 Ahr batteries. For UL 1076 applications, two 12 VDC 40Ahr batteries insures a supply that will power approximately 5 hours of back-up operation. For more information, obtain the Andover Continuum UL 1076 Burglar Alarm System Guide 30-3001-800. To protect the batteries, the battery cutoff circuitry will activate at 20.4 volts. The external battery pack connects to the module through a two-position screw terminal connector. Replacement of the external battery for maintenance purposes may be performed while the unit is AC powered without interruption of service. Connect the battery pack as follows: Bottom of Case
BAT (+)
BAT ( )
24VDC Battery Supply
12V Battery
( )
( )
(+)
(+)
12V Battery
Andover Continuum Power Supply Reference
11
Page 18
External Power Indicator Connection All Andover Continuum power supply modules include a connector for an external LED power-on indicator. The signal from this connector is active when the power supply is turned on and receiving input power (AC or DC). Connection is via a two pin removable female Molex connector # 14-56-7022 (not supplied). Wire the external LED as follows:
Bottom of Case
LED (+)
LED ( )
External LED
An optional cable assembly is available. Schneider Electric part number 01-0010-422 is a 2 foot (60 cm) cable that includes the LED and connector.
12
Schneider Electric
Page 19
Output Power Connection The power output connector is a five pin male assembly that is designed to easily insert directly into the left side (input) connector of any CPU or I/O module. The signals within that connector are as follows: PIN 5
Function +VDC
4
VDC Return
3
No Connection
2
Low Battery *
1
AC Power *
5 4 3 2 1
* Only on PS 120/240 AC 50-U, AC 65-U, AC 85-U and DC 50-U
All the Andover Continuum power supply modules (except the AC 25 model) generate a +24 VDC source for all other modules in the system. The PS 120/240 AC 25 power supply generates +5 VDC. This power source is located on pins 4 and 5. The UPS versions of these supplies include two power status signals on pins 1 and 2. Their function is as follows: •
AC Power is a logic signal that is intended to communicate to an attached CPU module that AC power is available. When AC is interrupted and the power supply has switched to UPS battery mode, this signal presents a logic low to the CPU. The CPU can use this signal to start an orderly system shutdown. For more information on the use of this signal refer to the Andover Continuum CPU Reference #30-3001-703.
•
Low Battery is a logic signal that is intended to communicate to an attached CPU module that the voltage of the battery has dropped below 22 Volts. When the power supply is in UPS battery mode, this signal presents a logic high to the CPU. Should the battery voltage drop, this signal switches to a logic low. The CPU uses this signal to start an orderly system shutdown. For more information on the use of this signal refer to the Andover Continuum CPU Reference #30-3001-703.
Andover Continuum Power Supply Reference
13
Page 20
Output Connections PS 120/240 AC 50(U), AC 65(U), AC 85(U), -48 DC 50(U) The PS 120/240 AC-50(U), AC 65(U), AC 85(U) and –48 DC 50(U) power supply modules directly connect to others without the use of cables through a system of built-in plugs and jacks. All modules except the power supply include two complementary module inter-connectors. The power supply becomes the first module feeding the CPU. All other modules are then connected to the CPU. Important: When powering a CPU, the power supply connects directly to the left side of the CPU. Do not place any I/O modules between the power supply and the CPU. Creating a system is as simple as physically plugging the modules together into a stack.
Power Supply
CPU
Power Supply
I/O
CPU
I/O
I/O
I/O
In vertical extended systems, I/O modules may be located above or below other modules. In this case, cable assemblies bridge the I/O modules together.
Power Supply
14
Schneider Electric
CPU