Page 185
Periodical check
After all connections to and within the PC have been completed, go through the following checklist before powering-up:
Check power connections.
jtem :
¥
Check I/O cable connections.
¥
Power and I/O line connection check
-Are all cable connections correct?
-Are all terminal screws firmly tightened? -Are all cables firmly secured to the rack panels?
‘Are power supply wires twisted together? -Do wire sizes meet the specifications?
Check /O expansion cable connections.
¥
/O expansion cable connection check
‘Are all expansion cables interconnecting the rack panels properly connected and clamped?
Check ground
Ground check
-Is the PC frame properly grounded to class-3 grounding?
-Verify that it does not share the same ground with high-power equipment.
connections.
¥
Check power supply module's line voltage selection.
¥.
Check installation of battery or battery-
Power supply module's primary voltage selection check
-Is the power supply module's primary voltage selector set to the position that corresponds to the primary supply voltage?
Memory module installation check
-Is the memory module instailed in the control module?
-Is the ROM chip for ROM operation installed?
free operation plug.
|
| Check fuses. | vv
Check primary AC and DC (24V) supply voltages.
¥
Check halt output circuit operation.
Power ON.
Battery or battery- free operation plug installation check
‘Is a battery cell installation in control module's battery holder and properly connected? (for RAM operation)
-Is the battery-free operation plug installed on the CPU board battery connector? (for battery-free operation)
Fuse check
-Verify that none of the fuses in the power supply and I/O modules are burnt through or damaged.
Halt output circuit check
‘Is the HALT signal properly included in the shut-off sequence external to the PC?
Supply voltage check
-Verify that the primary source voltages are within the following ranges: {AC line power) 100 VAC: 85 to 132 VAC 200 VAC: 170 to 264 VAC (DC power supply} 24 VDC: 20.4 to 32.0 VDC (I/O module's a external power source) Check the voltage of the external power source used for DC or conatct output modules (ZW-16S2, etc.)
Note: The tolerance of the supply voltage for the expansion power supply module is 100 VAC + 10% to 15% or 200 VAC +10% to 15%.
9-1
Page 186
9-2 Test run procedure
After all checks described in the previous section are completed, start a test run in the following manner :
Power ON.
¥
4) Check the primary supply voltage.
2) Check the voltages of external power sources for I/O modules.
3) Set the control module's memory protect switch OFF.
4) Connect the support tool to the control module or the I/O bus extension adapter.
5} Power-up the system.
6) Verify that the power supply module's "POWER"LED's indicator comes ON.
System memoy seiting and memory clear
See the programming manual, section 2-6, "System memory setting and memory clear."
¥
/O cabling check.
¥
1) To check output connections, forcibly turn the output circuits ON and OFF using the hand-held programmer in the change mode.
2) To check input connections, use the indicator lights on the input modules or the programmer's monitor feature.
When forcibly turning output circuits ON or OFF, set the setting value change switch (07365) to ON.
| Always open yc Setting value change switch AMI O 07365
07366
Programming
Test run
¥
1) Program the CPU board from the hand-held programmer. 2) If your progam is already stored in the multi-purpose programmer and the like, transfer it to the CPU board.
All programming should be done with the backup battery installed in the control module.
1) Verify that the "RUN" indicator comes ON. 2) Check the operation sequence.
Program debugging
1) Correct the program if needed.
Y
|
Program saving
1) Save the program to a cassette tape or floppy disk or write it into ROM (EPROM or EEPROM). 2) List the program (ladder diagram and list) on the printer.
End
Be sure to label the saving medium with the PC model, program capacity, facility name, data, and other necessary information.
9-2
Page 187
9-3 Live I/O replacement
The PC's "Live I/O replacement" feature allows you to replace I/O modules with th system power left ON.
[1] Entering the live I/O replacement mode With the hand-held programmer connected to th support tool port of the control module or I/O bus extension adapter (JW-2EA), key in:
J Le} bs)
The PC has now entered the live I/O replacement mode, wherein:
*« The PC stops all [/O and operational processing.
¢ The halt output circuit is left turned ON. (closed).
¢ The RUN indicator alternately flashes (for approx. 0.8 sec.) and comes on (for approx. 0.8 sec.).
You can now replace any I/O module.
Note : Special I/O modules cannot be replaced in the live I/O replacement mode.
[2] Resuming system operation After compieting I/O module replacement, resume system operation from the support tool by typing:
CRER ees
The support tool returns to the monitor mode.
Note : Only one support too! can be connected to the system, even if more than one rack panel is used in the system.
[3] Usable support tool eS Type | Hand-held programmer