Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeContact

The text of a manual · part 5 of 7

SIMATIC S5 S5-100U Programmable Controller System Manual, CPU 100/102/103, pages 41 to 50

Pages 41 to 50 of 69

The original document is the PDF (878 KB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

Filed in the catalog under the Siemens 6ES5-095-8MC01, Siemens 6ES5-431-8MA11, Siemens 6ES5-451-8MA11 and Siemens 6ES5-452-8MR11

Page 41 read from a scan by OCR; it may hold reading errors

S5-100U Installation Guidelines

3.1.2 Multi-Tier Expansion

If it is not possible to have all of the modules located on one tier, you can expand the configuration up to four tiers. You may use a maximum of 16 bus units. It does not matter how many bus units are mounted on a tier. You need one interface module per tier to interconnect the tiers.

Install an interface module as you would install a bus unit. You must connect each interface module to the last bus unit via the ribbon cable.

Use the IM 315 interface module for two-tier configurations. The IM 315 consists of two modules permanently connected to each other via a 0.5-m (20-in.) cable.

Use the IM 316 interface modules for multi-tier configurations. Use the 712-8 connecting cable to connect the IM 316 interface modules (Order No. 6ES5 712-8...).

The standard mounting rails must have a common reference potential if they are mounted in different cabinets.

eoa0o000000

° o0000000

00000000 o

@ oo 000000 o

Figure 3-4. Interconnecting Tiers with Interface Modules (6ES5 316-8MA12)

EWA 4NEB 812 6120-02b 3-5

Page 42

Installation Guidelines

S5-100U

Installing an Interface Module 1. 2. 3. 4. 5.

Hook the interface module to the standard mounting rail. Swing the interface module back until the slide on the bottom snaps into place on the rail. Use the ribbon cable to connect the module to the last bus unit. Use connecting cable 712-8 to join the two interface modules. Connect the cable to the “out” socket on the programmable controller tier and to the “in” socket on the expansion tier. 6. Securely screw the connecting cable plugs in place. Use two screws for each connecting cable plug.

Removing an Interface Module 1. Only for the IM 316: Remove the hold-down screws from the plugs and remove the connecting cable. 2. Remove the connecting ribbon cable from the adjacent bus unit. 3. Use a screwdriver to press down on the slide located on the bottom of the interface module. 4. Swing the module up and out of the standard mounting rail.

3-6

EWA 4NEB 812 6120-02b

Page 43

S5-100U

3.1.3

Installation Guidelines

Cabinet Mounting

Make sure that the S5-100U, the power supply, and all modules are well grounded. Mount the S5-100U on a metal plate to help prevent noise. There should be electrical continuity between the grounded enclosure and the mounting rails. Make sure that the system is bonded to earth. You can use the 8LW system or the 8LX system mounting plates (see Catalog NV 21). Adequate ventilation and heat dissipation are important to the proper operation of the system. You must have at least 210 mm (8.3 in.) between each mounting rail (see Figures in Appendix B) for proper ventilation. Always locate the power supply and the CPU on the lowest tier to ensure better heat dissipation. To measure cabinet ventilation, define the total heat loss by calculating the sum of all typical heat losses (see Catalog ST 52.1). IM 316 interface module

Metal plate

At least 210 mm (8.3 in.)

CPU

Figure 3-5.

EWA 4NEB 812 6120-02b

At least 210 mm (8.3 in.)

Multi-Tier Configuration in a Cabinet with the IM 316 Interface Module (6ES5 316-8MA12)

3-7

Page 44

S5-100U

Installation Guidelines

At least 45 mm (1.77 in.)

210 mm+a (8.3 in.+a) CPU a

Wiring devices and/or cable duct

Figure 3-6. Cabinet Mounting with a Series of Devices

3.1.4

Vertical Mounting

You can also mount the standard mounting rails vertically and then attach the modules one over the other. Because heat dissipation by convection is less effective in this case, the maximum ambient temperature allowed is 40 °C (104 °F). Use the same minimum clearances for a vertical configuration as for a horizontal configuration. You must install a clamp (see Catalog SA 2) on the lower end of the programmable controller tier to hold the modules mechanically in position.

CPU Clamp Figure 3-7. Vertically Mounting a Programmable Controller

3-8

EWA 4NEB 812 6120-02b

Page 45

S5-100U

Installation Guidelines

3.2

Wiring

3.2.1

Connection Methods: Screw-Type Terminals and Crimp Snap-in

SIGUT Screw-Type Terminal When using screw-type terminals, you can clamp two cables per terminal. It is best to use a 3.5-mm screwdriver to tighten the screws. Permissible cable cross-sections are:

A stranded conductor with a core end sleeve: A solid conductor:

• •

2 x 0.5 to 1.5 mm2 2 x 0.5 to 2.5 mm2

M3 screw Wire clamp Cables

Figure 3-8. SIGUT/Screw-Type Connection Method

EWA 4NEB 812 6120-02b

3-9

Page 46 read from a scan by OCR; it may hold reading errors

Installation Guidelines $5-100U

Crimp Snap-in Terminals Bus units using the crimp snap-in connection method have the same height as the CPU.

You can connect stranded conductors with a cross-section of 0.5 to 1.5-mmz2 to these terminals.

Connecting the Contact to the Terminal Biock Refer to Figure 3-9 and perform the following steps to connect the contact to the terminal block.

1. Remove the module that is plugged into the bus unit.

2. Use a screwdriver to press down on the terminal block (1).

3. Swing the terminal block up. The rear side is now visible (2).

4. Push the contact into the desired opening until the locating spring engages. - Caution: The spring must point into the slot.

Pull lightly on the cable to make certain that the contact is properly engaged. Swing the terminal block back into its original position.

Press up on the terminal block until it snaps into position.

NO

Figure 3-9. Mounting the Crimp Snap-In Terminal

3-10 EWA 4NEB 812 6120-02b

Page 47 read from a scan by OCR; it may hold reading errors

S5-100U Installation Guidelines

Disconnecting a Terminal

1. Position the terminal block as is shown in Figure 3-10.

2. Insert the extraction tool into the slot beside the terminal so that you can compress the barb. 3. Position the cable in the groove on the extraction tool and pull out both the tool and the cable. 4. Realign the deformed barb so that you can use the terminal again.

Figure 3-10. Disconnecting a Terminal

EWA 4NEB 812 6120-02b 3-11

Page 48 read from a scan by OCR; it may hold reading errors

Installation Guidelines S5-100U

3.2.2 Connecting the Power Supply to the S5-100U

Power Supply Module

1. Set the voltage selector to the supply voltage you are using.

2. Swing up the protective cover.

3. Connect the supply cable to terminals L1,N and, L-(see Figure 3-11). 4. Close the protective cover.

Figure 3-11. Connecting a Power Supply Module and a CPU

115/230 V AC power supply modules can be operated with a load voltage of 120/230 V AC.

CPU

1. Connect the L+ and M terminals of the PS 931 power supply module to the corresponding terminals on the CPU (see Figure 3-23).

2. Connect the L terminal of the CPU to the standard mounting rail.

3-12 EWA 4NEB 812 6120-02b

Page 49

S5-100U

3.2.3

Installation Guidelines

Connecting Digital Modules

All I/O modules are plugged into bus units. Connect the I/O modules to the terminal blocks of the bus units. The connections illustrated in this section are of the screw terminal type (SIGUT connection method). You can also use the crimp snap-in connection method described in section 3.2.1. In both cases, the terminal assignments are marked on the terminal blocks.

The assignments listed in Table 3-2 always apply for connecting the load voltage. Table 3-2. Connecting the Load Voltage

*

Load Voltage

Terminal 1

Terminal 2

24 V DC

L+

M

115/230 V AC

L1

N

115/230 V AC digital modules can be operated with a load voltage of 120/230 V AC.

Note For digital outputs, energy is temporarily stored in an internal capacitor for about 100 ms after the L+ supply is switched off. Please note that this energy may be sufficient to activate low-rating loads (e.g., pulse valves) for a triggered output.

EWA 4NEB 812 6120-02b

3-13

Page 50

Installation Guidelines

S5-100U

Connecting Four-Channel Digital Modules All of these modules are designed for a two-wire connection. You can therefore wire directly to the sensor or output field device. An external distribution block is not required. The four channels of a module are numbered from .0 through .3. (Numbers .4 through .7 are only significant for the ET 100 distributed I/O system.) Each channel has a pair of terminals on the terminal block. The terminal assignments and the connection diagram are printed on the front plate of the module. Connecting Four-Channel Input Modules

.0 .4

.1 .5

.2 .6

Example: Connecting a sensor to channel 2 (address I 3.2) on the input module in slot 3 (see Figure 3-12)

L+ M

1

4

5 6

7 8

5

3

7

9

1

10

9

.3 .7

2 3

F

8

6

4

10

2

4

DIGITAL INPUT 4 x 24 - 60 V DC 6ES5 430-8MB11 4

5

6

L+

M

3

2

1

Sensor

Figure 3-12. Two-Wire Connection of a Sensor to Channel 2

3-14

EWA 4NEB 812 6120-02b