The text of a spec sheet · part 2 of 3
RM7890; RM7895 100 Vac 7800 SERIES Relay Modules Product Data, pages 11 to 20
Pages 11 to 20 of 28
The original document is the PDF (2.0 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Honeywell RM7890
Page 11
RM7890; RM7895 100 VAC 7800 SERIES RELAY MODULES
Q7800
120V ALARM
BURNER CONTROLLER/LIMITS
INTERMITTENT PILOT/IGNITION
G
12
L2
13
3 (L1)
14
4
15
5
16
6
17
7
18
8
19
MAIN FUEL VALVE(S)
9
20
IGNITION
10
21
F
22
2
FOR DIRECT SPARK IGNITION (OIL OR GAS) 10
IGNITION TRANSFORMER
8
MAIN VALVE
L2
9
RECTIFYING FLAME ROD
L1 (HOT)
1 100V, 50/60 Hz POWER SUPPLY. PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION AS REQUIRED.
L2
MASTER SWITCH
1
M32662
2 DO NOT CONNECT ANY WIRES TO UNUSED TERMINALS.
Fig. 5. Wiring the RM7890 Relay Module. Table 6. Recommended Wire Sizes and Part Numbers. Application
Recommended Wire Size
Recommended Part Numbers
Line voltage terminals
14, 16 or 18 AWG copper conductor, 600 volt insulation, moisture-resistant wiring.
TTW60C, THW75C, THHN90C.
KDM
22 AWG two-wire twisted pair with ground, Belden® 8723 shielded cable (two-wire) or or five-wire communications wire. Belden® 8771 shielded cable (five-wire) or equivalent.
Data ControlBus™ Module
22 AWG two-wire twisted pair with ground or five-wire communications wire.
Remote Reset Module
22 AWG two-wire twisted pair, insulated for, low voltage.
Modbus™ Module
22 AWG two-wire twisted pair with ground. Belden® 8723 shielded cable or equivalent.
13 Vdc full-wave rectified transformer power input.
18 AWG wire insulated for voltages and temperatures for given application.
Belden® 8723 shielded cable (two-wire) or Belden® 8771 shielded cable (five-wire) or equivalent.
TTW60C, THW75C, THHN90C.
modules on the closest and farthest end of the daisy chain configuration string require a 120 ohm (1/4 watt minimum) resistor termination across terminals 1 and 2 of the electrical connectors for connections longer than 100 feet (30 meters).
The KDM, and (for remote mounting or communications) Data ControlBus™ Module or Modbus™ Module must be wired in a daisy chain configuration, (1(a)-1(a), 2(b)-2(b), 3(c)-3(c)). The order of interconnection of all the devices listed above is not important. Be aware that
11
66-1195 - 01
Page 12
RM7890; RM7895 100 VAC 7800 SERIES RELAY MODULES
Q7800 G
12
L2
13
120V ALARM
3
14
BURNER MOTOR (BLOWER)
4
15
5
(L1)
2
16
BURNER CONTROLLER/LIMITS
6
17
AIRFLOW INTERLOCK
7
18
INTERMITTENT PILOT/IGNITION
8
19
FOR DIRECT SPARK IGNITION (OIL OR GAS) 10
IGNITION TRANSFORMER L2
8
MAIN FUEL VALVE(S)
9
20
IGNITION
10
21
F
22
MAIN VALVE
RECTIFYING FLAME ROD 1 100V, 50/60 Hz POWER SUPPLY. PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION AS REQUIRED.
MASTER SWITCH
2 DO NOT CONNECT ANY WIRES TO UNUSED TERMINALS.
L1 (HOT) 1 L2
M32663
Fig. 6. Wiring the RM7895E,F Relay Module. 6.
For recommended grounding practices, see Table 7. Table 7. Recommended Grounding Practices. Ground Type
Earth ground (subbase and relay module).
Recommended Practice 1. Use to provide a connection between the subbase and the control panel of the equipment. Earth ground must be capable of conducting enough current to blow the 15A fuse (or breaker) in the event of an internal short circuit. 2. Use wide straps or brackets to provide minimum length, maximum surface area ground conductors. If a lead wire must be used, use 14 AWG copper wire. 3. Make sure that mechanically tighted joints along the ground path are free of nonconductive coatings and protected against corrosion on mating surfaces.
Signal ground (KDM, Data ControlBus™ Module, Modbus™ Module 7.
Connect the shield at both ends of the daisy chain to earth ground. instructions. b. Data ControlBus™ or Modbus™ Module: (1) Do not run high voltage ignition transformer wires in the same conduit with, or in close proximity to, the Data ControlBus Module wiring. (2) Do not route Data ControlBus™ or Modbus Module wires in conduit with line voltage circuits.
Recommended wire routing: a. For flame detector leadwires: (1) Do not run high voltage ignition transformer wires in the same conduit with the flame detection wiring. (2) Do not run scanner wires in a conduit with line voltage circuits. (3) Enclose scanner wires without armor cable in metal cable or conduit. (4) Follow directions given in the flame detector
66-1195 - 01
12
Page 13
RM7890; RM7895 100 VAC 7800 SERIES RELAY MODULES c. KDM: The KDM is powered from a low voltage, energy-limited source, so it can be mounted outside of the control panel if it is protected from mechanical damage. NOTE: Use a separate 13 Vdc power supply any time more than two Data ControlBus™ Modules or KDM are used or when placed more than 100 feet (30 meters) from the relay module.
8.
9. 10.
11. 12. 13.
3.
d. Remote Reset Module: (1) Do not run high voltage ignition transformer wires in the same conduit with the Remote Reset Module wiring. (2) Do not route Remote Reset Module wires in conduit with line voltage circuits. Maximum wire lengths: a. For the relay module, the maximum length of leadwire to the control terminal input is 300 feet (91 meters). b. For the flame detector leadwires, the maximum flame sensor leadwire length is limited by the flame signal strength. c. Remote Reset Module leadwires: The maximum length of wire is 1000 feet (305 meters) to a Remote Reset Module pushbutton. d. Data ControlBus™ or Modbus™ Module: The maximum cable length depends on the number of system modules connected, the noise conditions, and the cable used. The maximum length of all interconnecting wires is 1000 feet (305 meters). Make sure loads do not exceed the terminal ratings. Refer to the label on the relay module or to the ratings in the Specifications section. See Table 1. Check the power supply circuit to be sure the voltage and frequency tolerance match those of the relay module. A separate power supply circuit can be required for the relay module with the required disconnect means and overload protection added. Check all wiring circuits and complete the Static Checkout, see Table 8, before installing the relay module on the wiring subbase. Install all electrical connectors. Restore power to the panel.
IMPORTANT The relay module must be installed with a plug-in motion rather than a hinge action. 4.
1. 2. 3.
Align the interlocking ears of the dust cover with the two mating slots in the relay module, see Fig. 9. Insert the two interlocking ears into the two mating slots, and with a hinge action, push on the upper corners of the dust cover to secure it to the relay module. Be sure the dust cover is firmly in place.
Installing ST7800 Purge Card (RM7895 Only) 1. 2. 3. 4.
Remove the dust cover, KDM, Data ControlBus™ Module, or extension cable assembly. Remove the current ST7800 Purge Card from the relay module by pulling upward on the plastic support cover. See Fig. 10. Make sure that the ST7800 Purge Card selected has the desired purge timing. Insert the ST7800 Purge Card into the opening of the relay module purge card compartment. See Fig. 10.
Installing Plug-In Flame Signal Amplifier 1.
Mounting RM7890; RM7895
2.
NOTE: For installation dimensions, see Fig. 1 or 2.
Relay Module Mounting
2.
Mount the relay module by aligning the four L-shaped corner guides and knife blade terminals with the bifurcated contacts on the wiring subbase and securely tightening the two screws without deforming the plastic.
Dust Cover Mounting
ASSEMBLY
1.
a. Allow an additional two inches (51 mm) below the relay module for the flame amplifier mounting. b. Allow an optional three-inch (76 mm) minimum to both sides of the relay module for electrical signal voltage probes. Make sure subbase wiring does not project beyond the terminal blocks. Tuck in wiring against the back of the subbase so it does not interfere with the knife blade terminals or bifurcated contacts.
3.
Mount the relay module vertically, see Fig. 7 or 8, or mount horizontally with the knife blade terminals pointing downward. When mounting on the Q7800A Wiring Subbase, the relay module must be in an electrical enclosure. Select the location in the electrical enclosure. Be sure to allow adequate clearance for servicing, installation and removal of the relay module, dust cover, flame amplifier, flame amplifier signal voltage probes, electrical signal voltage probes and electrical connections.
4. 5.
Disconnect the power supply before beginning installation to prevent electrical shock and equipment damage. More than one disconnect can be involved. Align the amplifier circuit board edge connector with the keyed receptacle on the relay module. Verify that the amplifier nameplate faces away from the relay module. See Fig. 11. Push in the amplifier until the circuit board is fully inserted into the receptacle and then push the amplifier toward the relay module retaining clasp. Verify the amplifier is firmly in place. Perform all required checkout tests.
Installing Flame Detector NOTE: See Table 4 for the flame detection system available for use with the relay module. Make sure the correct combination of amplifier and flame detector is used.
13
66-1195 - 01
Page 14
RM7890; RM7895 100 VAC 7800 SERIES RELAY MODULES
Proper flame detector installation is the basis of a safe and reliable flame safeguard installation. Refer to the instructions packed with the flame detector and the equipment manufacturer instructions. Keep the flame signal leadwires as short as possible from the flame detector to the wiring subbase. Capacitance increases with leadwire length, reducing the signal strength. The maximum permissible leadwire length depends on the type of flame detector, leadwire and conduit. The ultimate limiting factor in the flame detector leadwire is the flame signal. See Table 10.
Fig. 9. Dust cover mounting.
Fig. 7. Electrical panel installation.
Fig. 10. ST7800 Purge Card installation (RM7895 only).
Fig. 8. Wall or burner installation. Fig. 11. Flame signal amplifier mounting.
66-1195 - 01
14
Page 15
RM7890; RM7895 100 VAC 7800 SERIES RELAY MODULES
SAFESTART
00 10 PFEP RUN 4 or 10 SEC
POWER
POWER
POWER
PILOT
PILOT
FLAME
FLAME
MAIN
MAIN
ALARM
ALARM
00 INITIATE LED DISPLAY
STANDBY
POWER
POWER
IGNITION
BURNER START
STANDBY POWER
10
INTERMITTENT PILOT
8
MAIN VALVE
OPERATING CONTROLLER AND LIMITS
1
9
LIMITS AND BURNER CONTROL CLOSED L1 TO 6
FLAME SIGNAL
SAFE START CHECK
FLAME PROVING
SSC
1 MAIN FUEL VALVE WILL BE ENERGIZED DURING PFEP IF FLAME IS PROVEN.
M32664
Fig. 12. RM7890 sequence. 00
LED DISPLAY
INITIATE
00
STANDBY
START
POWER
POWER
POWER
TIMED PURGE
00
PFEP 4 OR 10 SEC
RUN
POWER
POWER
PILOT
PILOT
PILOT
FLAME
FLAME
FLAME
MAIN
MAIN
MAIN
ALARM
ALARM
ALARM
BURNER/BLOWER MOTOR
BURNER START
STANDBY
POWER
10
4
IGN. 8
IGN./ PILOT
MAIN VALVE OPERATING CONTROLS AND INTERLOCKS FLAME SIGNAL
LIMITS AND BURNER CONTROLLER CLOSED AIRFLOW SW. CHECK
POWER
AIRFLOW INTERLOCK CLOSED
SAFE START CHECK
9
L1 TO 6
6 TO
7
AFSC
FLAME PROVING
SSC M32665
Fig. 13. RM7895 sequence.
OPERATION CAPTIVE MOUNTING SCREW
Sequence of Operation
DUST COVER
The relay modules have operating sequences as shown in Fig. 12 through 14.
SEQUENCE STATUS LEDs
RELAY MODULE
RESET PUSHBUTTON
FLAME AMPLIFIER
FLAME SIMULATOR INPUT
INITIATE The relay module enters the INITIATE sequence if the relay module verifies voltage fluctuations of +10%/-15% or frequency fluctuations of ±10% during any part of the operating sequence. The INITIATE sequence lasts for ten seconds unless the voltage or frequency tolerances are not met. When the tolerances are not met, a hold condition is initiated and displayed on the optional KDM for at least five seconds. When the tolerances are met, the INITIATE
FLAME CURRENT TEST JACKS
M8995
Fig. 14. Sequence status LED. 15
66-1195 - 01
Page 16
RM7890; RM7895 100 VAC 7800 SERIES RELAY MODULES sequence restarts. If the condition is not corrected and the hold condition exists for four minutes, the relay module locks out. Causes for hold conditions in the INITIATE sequence are: 1. 2. 3. 4.
3.
Ac line dropout is detected. Ac line frequency error. Ac line noise occurred that prevents a sufficient reading of the line voltage inputs. Brownout occurred caused by a low line voltage.
shutdown occurs. For the RM7890 only: if the flame is established within the PFEP, the system immediately goes to the RUN state. With flame proven (RM7895 reaches the end of the PFEP), the ignition, terminal 10, is de-energized and the main valve, terminal 9, is energized.
Run The relay module is now in RUN and remains in RUN until terminal 6, the controller input, opens, indicating that the call for heat demand is satisfied or that a limit has opened.
The INITIATE sequence also delays the burner motor starter from being energized and de-energized from an intermittent ac line input or control input.
Selectable Site-Configurable Jumpers
STANDBY
The RM7890 has two site-configurable jumper options and the RM7895 has three. See Fig. 15 and Tables 8 and 9. The siteconfigurable jumpers should be clipped with side cutters and the resistors removed from the relay module.
The relay module is ready to start an operating sequence when the operating control input determines a call for heat is present. The burner switch, limits, operating limit control and all microcomputer monitored circuits must be in the correct state for the relay module to continue into the SAFE-START CHECK (RM7890) or the PREPURGE (RM7895) sequence.
SERVICE NOTE:For RM7890 when using a 3-second amplifier, clip and remove site-configurable jumper JR2. If not removed, an F46 Lockout occurs.
Normal Startup
IMPORTANT Clipping jumpers after 200 hours of operation will result in a hard lockout (Fault Code 110).
Safe-Start Check The RM7890, RM7895 verify that a flame does not exist and proceeds into the Ignition Trial. If a flame is present, the relay module recycles to the STANDBY period. If the critical loads are not in the correct state, a safety shutdown occurs.
SELECTABLE SITE-CONFIGURABLE JUMPERS
Prepurge (RM7895) The RM7895 provides a selectable PREPURGE timing from two seconds to thirty minutes (using the ST7800 Plug-in Purge Timer) with power applied and the RM7895 operating control indicating a call for heat. 1. 2. 3.
10
Airflow Interlock, burner switch and all microcomputer monitored circuits must be in the correct operating state. The blower motor output, terminal 4, is powered to start the PREPURGE sequence. The Airflow Interlock input must close ten seconds into PREPURGE or within the specified purge card timing; otherwise, a recycle to the beginning of PREPURGE or lockout occurs depending on how the airflow switch selectable jumper is configured.
4
Ignition Trials
M32667
Pilot Flame Establishing Period (PFEP): 1. 2.
Fig. 15. Selectable site-configurable jumpers (RM7895 shown).
The pilot valve and ignition transformer, terminals 8 and 10, are energized. The relay module has an intermittent pilot valve, terminal 8. Flame must be proven by the end of the 4- or 10-second PFEP to allow the sequence to continue. If flame is not proven by the end of PFEP, a safety
Table 8. Site-Configurable Jumper Options (RM7890). Jumper Number
Description
Intact
Clipped
JR1
Pilot Flame Establishing Period
10 seconds
4 seconds
JR2
Flame Failure Action
Relighta
Lockout aThe Relight feature (JR2) requires a 0.8 second FFRT flame amplifier. 66-1195 - 01
16
Page 17
RM7890; RM7895 100 VAC 7800 SERIES RELAY MODULES
Table 9. Site-Configurable Jumper Options (RM7895). Jumper Number
Description
Intact
Clipped
JR1
Pilot Flame Establishing Period
10 seconds
4 seconds
JR2
Flame Failure Action
Recycle
Lockout
JR3
Airflow Switch (ILK) Failure
Recycle
Lockout
STATIC CHECKOUT
Equipment Recommended 1.
WARNING
2.
Electrical Shock Hazard. Can cause severe injury, death or property damage. Open the master switch before installing or removing a jumper on the wiring subbase.
Voltmeter (one megohm/volt minimum sensitivity), set on the 0 to 300 Vac scale. Two jumper wires, no. 14 wire, insulated, 12 in. (305 mm) long with insulated alligator clips at both ends. An ammeter can replace one of the jumper wires when checking operation of terminals 8, 9, or 10. Verify amp draw to the device nameplate.
General Instructions
1.
Use extreme care when testing the system because line voltage is present on most terminal connections when power is on. 2. Before continuing to the next test, be sure to remove the test jumper(s) used in the previous test. 3. Replace all limits and interlocks not operating properly. Do not bypass limits and interlocks. 4. Close all manual fuel shutoff valves before starting the tests. After checking all wiring, perform this checkout before installing the relay module on the wiring subbase. These tests verify that the Q7800 Wiring Subbase is wired correctly and that the external controllers, limits, interlocks, actuators, valves, transformers, motors and other devices are operating properly.
1. 2. 3. 4. 5. 6. 7. 8.
CAUTION Equipment Damage Hazard.
9.
High voltage dielectric test can cause equipment damage. Do not perform dielectric test with the relay module installed. Internal surge protectors break down and conduct a current, causing dielectric test failure and destruction of the internal lightning and high current protection.
10. 11. 12.
17
Perform all applicable tests listed in Static Checkout, Tables 10 and 11, in the order listed. Make sure that all manual fuel shutoff valves are closed. Perform only those tests designated for the specific relay module model being tested. Raise the setpoint of the operating controller to simulate a call for heat. For each test, open the master switch and install the jumper wire(s) between the subbase wiring terminals listed in the Test Jumpers column of Table 10 or Table 11. Close the master switch before observing operation. Read the voltage between the subbase wiring terminals listed in the Voltmeter column of Table 10 or 11. If there is no voltage or the operation is abnormal, check the circuits and external devices as described in the last column. Check all wiring for correct connections, tight terminal screws, correct wire size, and proper wiring techniques. Replace all damaged or incorrectly sized wires. Replace faulty controllers, limits, interlocks, actuators, valves, transformers, motors and other devices as required. Obtain normal operation for each required test before continuing the checkout. After completing each test, be sure to remove the test jumper(s).
66-1195 - 01
Page 18
RM7890; RM7895 100 VAC 7800 SERIES RELAY MODULES
Table 10. RM7890 Static Checkout. Test Number
Test Jumpers
Voltmeter
Normal Operation
If Operation is Abnormal, Check the Items Listed Below
WARNING
Explosion Hazard. Can cause severe injury, death or property damage. Make sure that all manual fuel shutoff valves are closed.
IMPORTANT Low fuel pressure limits, if used, could be open. Bypass them with jumpers for the remaining static tests, if required. 1
None
3 to L2
Line voltage at terminal 3.
1. Master Switch. 2. Power connected to the Master Switch. 3. Overload protection (fuse, circuit breaker) has not opened the power line.
2
None
6 to L2
Line voltage at terminal 6.
1. Limits. 2. Burner controller.
3
3 to 10a, Ignition spark (if ignition transformer is connected to terminal 10).
1. Watch for spark or listen for buzz. a. Ignition electrodes are clean. b. Ignition transformer is okay.
4
3 to 8a, 1. Ignition spark (if ignition transformer is connected to terminal 8). 2. Automatic pilot valve opens (if connected to terminal 8). NOTE: Refer to wiring diagram of system being tested.
1. Watch for spark or listen for buzz. a. Ignition electrodes are clean. b. Ignition transformer is okay. 2. List for click or feel head of valve for activation. a. Actuator, if used. b. Pilot valve.
5
3 to 9a, Automatic fuel valve(s) opens. If Same as test number 4. If using direct spark using direct spark ignition, check ignition, check the first stage fuel valve(s) instead the first stage fuel valve(s) instead of the pilot valve. of the pilot valve.
6
3 to 4, Alarm, if used, turns on.
Final
Alarm.
CAUTION Equipment Damage Hazard.
Incorrect wiring can damage equipment. After completing these tests, open the Master Switch and remove all test jumpers from the subbase terminals. Also remove the bypass jumpers from the low fuel pressure limits (if used).
a
Use an ammeter in place of the jumper wire to verify current draw of the terminal loads. Do not exceed ratings shown in Tables 2 and 3.
66-1195 - 01
18
Page 19
RM7890; RM7895 100 VAC 7800 SERIES RELAY MODULES
Table 11. RM7895 Static Checkout. Test Number
Test Jumpers
Voltmeter
Normal Operation
If Operation is Abnormal, Check the Items Listed Below
WARNING
Explosion Hazard. Can cause severe injury, death or property damage. Make sure that all manual fuel shutoff valves are closed.
IMPORTANT Low pressure fuel limits, if used, could be open. Bypass them with jumpers for the remaining static tests, if required. 1
None
5 to L2
Line voltage at terminal 3.
1. Master Switch. 2. Power connected to the Master Switch. 3. Overload protection (fuse, circuit breaker) has not opened the power line.
2
None
6 to L2
Line voltage at terminal 6.
1. Limits. 2. Burner controller.
3
4 to 5
7 to L2
Burner motor (fan or blower) starts. Line voltage at terminal 7 within 10 seconds.
1. Burner motor circuit. a. Manual switch of burner motor. b. Burner motor power supply, overload protection and starter. c. Burner motor.
4
5 to 10a, Ignition spark (if ignition transformer is connected to terminal 10).
1. Watch for spark or listen for buzz. a. Ignition electrodes are clean. b. Ignition transformer is okay.
5
5 to 8a, 1. Ignition spark (if ignition transformer is connected to terminal 8). 2. Automatic pilot valve opens (if connected to terminal 8). NOTE: Refer to wiring diagram of system being tested.
1. Watch for spark or listen for buzz. a. Ignition electrodes are clean. b. Ignition transformer is okay. 2. List for click or feel head of valve for activation. a. Actuator, if used. b. Pilot valve.
6
5 to 9a, Automatic fuel valve(s) opens. If Same as test number 5. If using direct spark using direct spark ignition, check ignition, check the first stage fuel valve(s) the first stage fuel valve(s) instead of the pilot valve. instead of the pilot valve.
7
5 to 3, Alarm, if used, turns on.
Final
Alarm.
CAUTION Equipment Damage Hazard.
Incorrrect wiring can damage equipment. After completing these tests, open the Master Switch and remove all test jumpers from the subbase terminals. Also remove the bypass jumpers from the low fuel pressure limits (if used).
a
Use an ammeter in place of the jumper wire to verify current draw of the terminal loads. Do not exceed ratings shown in Tables 2 and 3.
CHECKOUT
Limit the trial for pilot to ten seconds, and limit the attempt to light the main burner to two seconds from the time the fuel reaches the burner nozzle. Do not exceed the nominal lightoff time specified by the equipment manufacturer. Close the manual fuel shutoff valve(s) if the flame is not burning at the end of the specified time.
WARNING
Explosion Hazard. Can cause severe injury, death or property damage. Do not allow fuel to accumulate in the combustion chamber. If fuel is allowed to enter the chamber for longer than a few seconds, an explosive mixture could result.
19
66-1195 - 01
Page 20
RM7890; RM7895 100 VAC 7800 SERIES RELAY MODULES
Checkout Summary
WARNING
1. 2. 3.
Electrical Shock Hazard. Can cause severe injury, death or property damage. Use extreme care while testing the system. Line voltage is present on most terminal connections when power is on.
1. 2. 3.
4. 5. 6. 7.
Open the master switch before removing or installing the relay module. Make sure all manual fuel shutoff valve(s) are closed before starting the initial lightoff check and the Pilot Turndown tests. Do not put the system into service until you have satisfactorily completed all applicable tests in this section and any others required by the equipment manufacturer.
8. 9.
Preliminary inspection, all installations. Flame signal measurement, all installations. Initial lightoff check for proved pilot, all installations using a pilot. Initial lightoff check for direct spark ignition (DSI) of oil, all burners using DSI. Pilot turndown test, all installations using a pilot. Hot refractory hold-in test, all installations. Ignition interference test, all installations using flame rods. Flame signal with hot combustion chamber, all installations. Safety shutdown tests, all installations.
See Fig. 14 for location of component parts and see Fig. 5 or 6 or Q7800 Specifications, form 65-0084, for terminal locations.
Preliminary Inspection
CAUTION Equipment Damage Hazard.
When performing the following inspections, check to verify:
Use of improper equipment will cause operational failure. Do not replace the RM7890, RM7895 Relay Module with a lower or higher functioning relay module until you have made the necessary wiring changes or the burner will not sequence.
1. 2. 3. 4. 5.
IMPORTANT 1. If the system fails to function properly, refer to 7800 SERIES Relay Modules Checkout and Troubleshooting, form 65-0229. 2. Repeat all required CHECKOUT tests after all adjustments are made. All tests must be satisfied with the flame detector in its final position.
6. 7. 8. 9.
Equipment Recommended
10.
Volt ohmmeter (one megohm/volt minimum sensitivity):
11.
a. 0 to 300 Vac range. b. 0 to 6000 ohms range. c. 0 to 10 Vdc range.
Wiring connections are correct and all terminal screws are tight. Flame detector is clean, installed and positioned properly. (Check the applicable installation instructions.) Correct combination of amplifier and flame detector is used. See Table 4. Plug-in amplifier is securely in place. Burner is completely installed and ready to fire. (Consult equipment manufacturer instructions.) Fuel lines are purged of air. Combustion chamber and flues are clear of fuel and fuel vapors. Power is connected to the system disconnect switch (master switch). Lockout switch is reset (push in reset pushbutton) only if the relay module is powered; see Fig. 14. System is in the STANDBY condition and POWER LED is energized. All limits and interlocks are reset.
Flame Signal Measurement Measure the flame signal at the appropriate times defined in the following checkout tests. Read the flame signal volts dc at the flame amplifier test jacks + and - (Com). See Fig. 16 and Table 12. Table 12. Flame Signal.
Minimum Acceptable Steady dc Voltagea 1.25 Vdc a
Maximum Expected dc Voltage 5.0 Vdc at the KDM or 5.0 Vdc at a one megohm per volt meter.
This minimum or a stronger signal should be easily obtained if the detector is installed correctly and positioned to properly sense the flame. This voltage must be obtained before completing checkout.
66-1195 - 01
20